• Title/Summary/Keyword: Probabilistic Evaluation

Search Result 554, Processing Time 0.026 seconds

Recent research towards integrated deterministic-probabilistic safety assessment in Korea

  • Heo, Gyunyoung;Baek, Sejin;Kwon, Dohun;Kim, Hyeonmin;Park, Jinkyun
    • Nuclear Engineering and Technology
    • /
    • v.53 no.11
    • /
    • pp.3465-3473
    • /
    • 2021
  • For a long time, research into integrated deterministic-probabilistic safety assessment has been continuously conducted to point out and overcome the limitations of classical ET (event tree)/FT (fault tree) based PSA (probabilistic safety assessment). The current paper also attempts to assert the reason why a technical transformation from classical PSA is necessary with a re-interpretation of the categories of risk. In this study, residual risk was classified into interpolating- and extrapolating-censored categories, which represent risks that are difficult to identify through an interpolation or extrapolation of representative scenarios due to potential nonlinearity between hardware and human behaviors intertwined in time and space. The authors hypothesize that such risk can be dealt with only if the classical ETs/FTs are freely relocated, entailing large-scale computation associated with physical models. The functional elements that are favorable to find residual risk were inferred from previous studies. The authors then introduce their under-development enabling techniques, namely DICE (Dynamic Integrated Consequence Evaluation) and DeBATE (Deep learning-Based Accident Trend Estimation). This work can be considered as a preliminary initiative to find the bridging points between deterministic and probabilistic assessments on the pillars of big data technology.

Probabilistic Risk Evaluation Method for Human-induced Disaster by Risk Curve Analysis (확률.통계적 리스크분석을 활용한 인적재난 위험평가 기법 제안)

  • Park, So-Soon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.6
    • /
    • pp.57-68
    • /
    • 2009
  • Recently, damage scale of human-induced disaster is sharply increased but its occurrences and damages are so uncertain that it is hard to construct a resonable response & mitigation plan for infrastructures. Therefore, the needs for a advanced risk management technique based on a probabilistic and stochastic risk evaluation theory is increased. In this study, these evaluation methods were investigated and a advanced disaster risk evaluation method, which is based on the probabilistic or stochastic risk assessment theory and also is a quantitative evaluation technique, was suggested. With this method, the safety changes as the result of fire damage management for recent 40 years was analyzed. And the result was compared with that of Japan. Through the consilience of the traditional risk assessment method and this method, a stochastical estimation technique for the uncertainty of future disaster's damage could support a cost-effective information for a resonable decision making on disaster mitigation.

Estimation of Project Duration by Probabilistic Linkage Evaluation Technique (PLET) (확률적 연결관계 평가기법(PLET)에 의한 사업공기 추정)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.44-52
    • /
    • 2014
  • Generally, the most difficult works at scheduling are to estimate the duration of activities and linkages between them because the possibility that the duration and linkages could be exposed to the uncertainties is so high. When estimating a project duration, therefore, the probabilistic estimation of the duration as well as the probabilistic estimation of the linkages between activities should be considered concurrently. The PERT that is one of the most popular techniques applied for the probabilistic estimation of a project duration can not consider the uncertainties of the linkages because it only estimates the probabilistic duration limited to 'FS0' relationship. The purpose of this study is to propose the new method "PLET" for stochastically estimating the project duration based on the probabilistic estimation of the BDM's relationships, and also provide more wide and various probabilsitic information about the project duration by it.

The Study of FACTS Impacts for Probabilistic Transient Stability

  • Kim Hyung-Chul;Kwon Sae-Hyuk
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.129-136
    • /
    • 2006
  • This paper proposes a probabilistic evaluation for the transient stability of electrical power systems incorporating FACTS devices. The uncertainties of the fault location and relay operation time play important keys in power system instability evaluation. The TCSC and SVC are employed for the reduction of system instability probability. This method is demonstrated by the WSCC test system and the results are compared with and without FACTS by means of Monte Carlo simulation.

A Study on the Probabilistic Nature of Fatigue Crack Propagation Life(III) - A Method for Uncertainty Evaluation of Crack Propagation Rate - (피로크랙 진전수명의 확율특성에 관한 연구(III) - 크랙진전속도의 불확정성 평가수법 -)

  • 윤한용
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.15 no.5
    • /
    • pp.1635-1639
    • /
    • 1991
  • 본 연구에서는 제1보에서의 수법을 이용하여 초기크랙길이의 분포를 고려한 재료의 불확정성 평가수법을 제시하고자 한다.

Probabilistic Analysis of Equivalent Uniformly Distributed live toads (등가등분포 적재하중의 확률론적 분석)

  • 김상효;정시현;조형근
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1989.04a
    • /
    • pp.1-4
    • /
    • 1989
  • Since 1960's, structural engineers have recognized that tile inherent random nature of loadings and materials as well as the imperfect structural analysis may be important factors in tile structural safety evaluation. Based on the successful developments of the reliability based structural analysis and design, the design criteria of tile standards are recently developed(or modified) in the light of the probabilistic concepts. To develop the probability-based design criteria for tile domestic buildings, the probabilistic characters of loadings acting on structures should be defined first. In this study, therefore, live load data on apartment buildings have collected and analyzed in a systematic manner, and their probabilistic characteristics have been studied. Based oil the results, the lifetime extreme values are computed and compared with current design loads. More rational design loads are suggested, which are more consistent in the probabilistic concepts.

  • PDF

Reliability Assessment of Long-Period Cable-Stayed Bridges on Near Fault Earthquake(NFE) (근거리지진에서 장주기사장교의 신뢰성평가)

  • Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.1
    • /
    • pp.44-48
    • /
    • 2012
  • The seismic safety of long-period cable-stayed bridges is assessed by probabilistic finite element analysis and reliability analysis under NFE. The structural response of critical members of cable-stayed bridges is evaluated using the developed probabilistic analysis algorithm. In this study, the real earthquake recording(Chi-Chi Earthquake; 1997) was selected as the input NFE earthquake for investigating response characteristics. The probabilistic response and reliability index shows the different aspect comparing the result from FFE earthquake. Therefore, the probabilistic seismic safety assessment on NFE earthquakes should be performed for the exact evaluation of long-period cable-stayed bridges and the earthquake resistant design criteria should be complemented.

Probabilistic analysis of buckling loads of structures via extended Koiter law

  • Ikeda, Kiyohiro;Ohsaki, Makoto;Sudo, Kentaro;Kitada, Toshiyuki
    • Structural Engineering and Mechanics
    • /
    • v.32 no.1
    • /
    • pp.167-178
    • /
    • 2009
  • Initial imperfections, such as initial deflection or remaining stress, cause deterioration of buckling strength of structures. The Koiter imperfection sensitivity law has been extended to describe the mechanism of reduction for structures. The extension is twofold: (1) a number of imperfections are considered, and (2) the second order (minor) imperfections are implemented, in addition to the first order (major) imperfections considered in the Koiter law. Yet, in reality, the variation of external loads is dominant over that of imperfection. In this research, probabilistic evaluation of buckling loads against external loads subjected to probabilistic variation is conducted by extending the concept of imperfection sensitivity. A truss arch subjected to dead and live loads is considered as a numerical example. The mechanism of probabilistic variation of buckling strength of this arch is described by the proposed method, and its reliability is evaluated.

Systems Engineering Process Approach to the Probabilistic Safety Assessment for a Spent Fuel Pool of a Nuclear Power Plant (사용후핵연료저장조의 확률론적안전성평가 수행을 위한 시스템엔지니어링 프로세스 적용 연구)

  • Choi, Jin Tae;Cha, Woo Chang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.2
    • /
    • pp.82-90
    • /
    • 2021
  • The spent fuel pool (SFP) of a nuclear power plant functions to store the spent fuel. The spent fuel pool is designed to properly remove the decay heat generated from the spent fuel. If the cooling function is lost and proper operator action is not taken, the spent fuel in the storage pool can be damaged. Probabilistic safety assessment (PSA) is a safety evaluation method that can evaluate the risk of a large and complex system. So far, the probabilistic safety assessment of nuclear power plants has been mainly performed on the reactor. This study defined the requirements and the functional architecture for the probabilistic safety assessment of the spent fuel pool (SFP-PSA) by applying the systems engineering process. And, a systematic and efficient methodology was defined according to the architecture.

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.