• Title/Summary/Keyword: Priority estimation

Search Result 120, Processing Time 0.022 seconds

Fast Motion Estimation Algorithm Using Early Detection of Optimal Candidates with Priority and a Threshold (우선순위와 문턱치를 가지고 최적 후보 조기 검출을 사용하는 고속 움직임 예측 알고리즘)

  • Kim, Jong-Nam
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.21 no.2
    • /
    • pp.55-60
    • /
    • 2020
  • In this paper, we propose a fast block matching algorithm of motion estimation using early detection of optimal candidate with high priority and a threshold. Even though so many fast algorithms for motion estimation have been published to reduce computational reduction full search algorithm, still so many works to improve performance of motion estimation are being reported. The proposed algorithm calculates block matching error for each candidate with high priority from previous partial matching error. The proposed algorithm can be applied additionally to most of conventional fast block matching algorithms for more speed up. By doing that, we can find the minimum error point early and get speed up by reducing unnecessary computations of impossible candidates. The proposed algorithm uses smaller computation than conventional fast full search algorithms with the same prediction quality as the full search algorithm. Experimental results shows that the proposed algorithm reduces 30~70% compared with the computation of the PDE and full search algorithms without any degradation of prediction quality and further reduces it with other fast lossy algorithms.

Priority Setting for Occupational Cancer Prevention

  • Peters, Cheryl E.;Palmer, Alison L.;Telfer, Joanne;Ge, Calvin B.;Hall, Amy L.;Davies, Hugh W.;Pahwa, Manisha;Demers, Paul A.
    • Safety and Health at Work
    • /
    • v.9 no.2
    • /
    • pp.133-139
    • /
    • 2018
  • Background: Selecting priority occupational carcinogens is important for cancer prevention efforts; however, standardized selection methods are not available. The objective of this paper was to describe the methods used by CAREX Canada in 2015 to establish priorities for preventing occupational cancer, with a focus on exposure estimation and descriptive profiles. Methods: Four criteria were used in an expert assessment process to guide carcinogen prioritization: (1) the likelihood of presence and/or use in Canadian workplaces; (2) toxicity of the substance (strength of evidence for carcinogenicity and other health effects); (3) feasibility of producing a carcinogen profile and/or an occupational estimate; and (4) special interest from the public/scientific community. Carcinogens were ranked as high, medium or low priority based on specific conditions regarding these criteria, and stakeholder input was incorporated. Priorities were set separately for the creation of new carcinogen profiles and for new occupational exposure estimates. Results: Overall, 246 agents were reviewed for inclusion in the occupational priorities list. For carcinogen profile generation, 103 were prioritized (11 high, 33 medium, and 59 low priority), and 36 carcinogens were deemed priorities for occupational exposure estimation (13 high, 17 medium, and 6 low priority). Conclusion: Prioritizing and ranking occupational carcinogens is required for a variety of purposes, including research, resource allocation at different jurisdictional levels, calculations of occupational cancer burden, and planning of CAREX-type projects in different countries. This paper outlines how this process was achieved in Canada; this may provide a model for other countries and jurisdictions as a part of occupational cancer prevention efforts.

A TWO-DIMENSIONAL MAXIMUM SEARCH MEHHOD BY A GLOBAL PRIORITY STRATEGY WITH LOCAL PEAK ESTIMATION:ITS OPTIMAL SWITCHING CRITERION

  • Wakasugi, Yoshizumi;Yasuda, Genichi;Shin, Seiichi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1995.10a
    • /
    • pp.488-491
    • /
    • 1995
  • The paper presents a new global maximum search method for multimodal unknown functions of two variables. The search method is composed of two stages and sequentially samples the candidate point in a subdomain selected using a priority function in each stage. The search domain is auto-similarly divided into triangular subdomains, or cells, during the search process. A measure of accuracy of local maximum search is introduced to check if a local search has converged to a specified accuracy or the maximum of a local peak cannot be the global maximum. A criterion for switching from the first to the second stage, is proposed using a ratio of the observed peak width to the largest cell in the domain. By numerical simulations, the required number of trials is evaluated for some function models with different peak parameters, and the switching criterion is optimally determined. The results show that the proposed method obtains global maximum points with certainty and saves largely computation time even for functions with extremely steep peaks.

  • PDF

Advanced Seismic Retrofit Priority Decision For Seismic Performance Estimation of Existing Bridges (기존 교량의 내진성능평가를 위한 개선된 내진보강 우선순위 결정)

  • Park, Kwang-Soon;Ju, Hyeong-Seok;Choi, Hong-Cheol;Kim, Ick-Hyun
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.13 no.6
    • /
    • pp.47-57
    • /
    • 2009
  • Existing bridges are classified into 4 retrofit groups using the current preliminary screening method, considering key terms such as seismicity, vulnerability and social impact effect. However, some irrationality was found when the current method was applied to 442 existing bridges. As a result, it was determined that quantification and a more detailed classification of seismicity were required. The estimation of the vulnerability of box girder bridges having a long span length should be improved, as this showed a tendency to underestimate. It was also necessary to increase the level of social impact effect to that of vulnerability. In this study, an improved preliminary screening method has been proposed on the basis of the estimation results of existing bridges.

Development of A Estimation Method of Traffic Demand Between ICs and An Algorithm for Providing Traffic Information (고속도로 IC간 교통수요 추정과 이를 통한 교통정보 제공 알고리즘 개발)

  • Lee, Jun;Cho, Han-Seon;Kwon, Young-In
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.83-91
    • /
    • 2011
  • The objective of VMS(Variable Message Sign) is to provide the traffic information downstream to drivers upstream so that they can choose their routes or expect the travel time to arrive the destination. Because there is not enough time and space to show the message, VMS message should be selected carefully. However, the message of VMS has been simply selected among the pre-designed message sets based on the priority rule of events. If the traffic demand between origin and destination is identified along the freeway, message can be selected to provide the information of a route that more drivers will use. In this study, a time sliced OD(Origin/Destination) estimation method will be developed using the detector information of the on-ramp, exit ramp, and the main lanes. And the strategy of a priority rule of message was planned.

Allocation Priority Scheme for Multiprocessor Systems (다중프로세서 시스템에 적합한 우선순위 할당 결정기법에 관한 연구)

  • Park Yeong-Seon;Kim Hwa-Su
    • Journal of the military operations research society of Korea
    • /
    • v.17 no.2
    • /
    • pp.113-122
    • /
    • 1991
  • This paper presents the Allocation Priority Scheme (APS) for multiprocessor system. The objective of APS is to reduce the time-complexity on a Physical Mapping Scheme(PMS). The PMS is to allocate the nodes of the Data Dependency Graph (DDG) to the multprocessors efficiently and effectively. The APS provides the priority to each node (vertex) in the DDG. In other words, the goal of the APS is to find a request resource mapping such that the total cost (time-complexity) is minimized. The special case in which all requests have equal priorities and all resoruces have equal precedences, and the comparisons between our APS and other schems are discussed in the paper. The APS provides the heuristic rules which are based on maximum height (MH), number of children nodes ($N_c$), number of father nodes ($N_f$), and computation time ($T_c$). The estimation moth of the computaion time is in the paper.

  • PDF

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

A Study on Improvements of Landscape Impact Assessment - EIA and PER in Priority - (경관영향평가제도의 개선에 관한 연구 - 사전환경성검토와 환경영향평가를 중심으로 -)

  • Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.4
    • /
    • pp.68-80
    • /
    • 2005
  • This study intends to analysis problems and propose of EIA(Environmental Impact Assessment) and PER(Pre-Environmental Review) especially on division of landscape impacts. The problems of EIA and PER are first, on analysis of existing conditions side, insufficiency of the list of landscape elements and their descriptions and presentations, and the number of viewpoints and each validity second, on estimation of landscape impacts, the methods and techniques of estimation and simulation, and the process of impact estimation, third, on suggestion of reduction plans, reduction devices covering impacts, the lack of influence reduction forecasting devices, the deficiency of execution power of reduction plans, finally, the systematic connection of impact estimation with existing conditions analysis and reduction plans. Therefore, on each step from existing condition analysis to reduction plan suggestion, the solutions to each problem are proposed.

Qualitative Assessment for Hazard on the Electric Power Installations of a Construction Field using FMEA (FMEA를 이용한 건설현장 전력설비의 위험성에 대한 정성적 평가)

  • Kim Doo-hyun;Lee Jong-ho
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.36-41
    • /
    • 2004
  • This paper presents an qualitative assessment for hazard on the electric power installations of a construction field using FMEL The power installations have the mission to maintain the highest level of service reliability on the works. The more capital the electric power invest the higher service reliability they plausibly will achieve. However, because of limited resources, how effectively budgets can be allocated to achieve service reliability as high as possible. The assessment typically generates recommendations for increasing component reliability, thus improving the power installation safety. The FMEA tabulates the failure modes of components and how their failure affects the power installations being considered. Tn order to estimate the risks of a failures, the FMEA presents criticality estimation or risk priority number using the severity, occurrence, and detectability. The results showed that the highest components of the risk priority number among components were condenser, transformer, MCCB and LA. And In case of the criticality estimation, the potential failure modes were abnormal temperature rise, insulation oil leakage, deterioration for the transformer, overcurrent for the MCCB and operation outage fir the LA.

Signal Timing Calculation Model of Transit Signal Priority using Shockwave Theory (충격파 이론을 이용한 대중교통 우선신호의 신호시간 산정모형)

  • Park, Sang Sup;Cho, Hye Rim;Kim, Youngchan;Jeong, Youngje
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.897-905
    • /
    • 2015
  • This research suggested the traffic signal calculation model of active transit signal priority using a shockwave model. Using this signal priority timing optimization model, the shockwave area is computed under the condition of Early Green and Green Extension among active transit signal priority techniques. This study suggested the speed estimation method of backward shockwave using average travel time and intersection passing time. A shockwave area change is calculated according to signal timing change of transit signal priority. Moreover, this signal timing calculation model could determine the optimal signal priority timings to minimize intersection delay of general vehicles. A micro simulation analysis using VISSIM and its user application model ComInterface was applied. This study checked that this model could calculate the signal timings to minimize intersection delay considering saturation condition of traffic flow. In case studies using an isolated intersection, this study checked that this model could improve general vehicle delay of more over ten percentage as compared with equality reduction strategy of non-priority phases. Recently, transit priority facilities are spreading such as tram, BRT and median bus lane in Korea. This research has an important significance in that the proposed priority model is a new methodology that improve operation efficiency of signal intersection.