• Title/Summary/Keyword: Priority Traffic

Search Result 534, Processing Time 0.028 seconds

The Determinants of Port Hinterlands Competitiveness in Korea-China: Focusing on Gwangyang Port and Qingdao Port (한·중 항만배후단지의 경쟁요인 비교분석에 관한 연구: 광양항과 칭다오항을 중심으로)

  • Qing, Cheng lin;Na, Ju Mong
    • International Area Studies Review
    • /
    • v.17 no.4
    • /
    • pp.109-130
    • /
    • 2013
  • This study aims to identify the priority for the Gwangyang and Qingdao hinterlands which are in the same category of benchmarking crowed paths. This study has been mainly done with comparison. There is certain limitation to use competitive factors of existing research so, this study has had proper competitive factors deriving from factors analysis and studied hinterland priority of competing factors by AHP. Major results are as follows. First, the factor analysis resulted in 20 factor that were 0.6 or higher loading level of commonality and then these 20 factors were divided into groups: operating factors, service factors, cost factors, port infrastructure factors, and hinterland conditions factors with the rotated component matrix analysis. Second, according to the result of top competitive factors, the best factor was the hinterland condition(0.256). The other factors such as infrastructure, economy, accessibility, incentive, and port traffic in hinterland were highly ranked in terms of general importance using multiple weights. Third, the result of detailed properties importance about the final alternative, Gwangyang hinterland was considered more highly than Qingdao hinterland in the port information system, the support a variety of administrative services, the efficiency of the customs, and the tax benefits.

A Study on the Optimal Span Width In the Bridge Main Span of Incheon 2nd Bridge (2) Economic Analysis on Port Operational Efficiency according to Traffic Schemes in the Bridge Main Span of Incheon 2nd Bridge (인천항 제2연륙교 주경간의 적정 교각폭 결정에 관한 연구 (2) 제2연륙교 주경간의 통항방식에 따른 항만운영효율의 경제성 분석)

  • Koo Ja-Yun;Kim Seok-Jae;Jang Eun-Kyu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.337-342
    • /
    • 2004
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, have been proposed by the private capital in 1999. But the optimal span width in the bridge main span have not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, me-way or two-way of vessels over 10,000G/T, in the bridge main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768..9 billion won.

  • PDF

An Algorithm for Stable Video Conference System (안정적인 화상회의 시스템을 위한 알고리즘)

  • Lee Moon-Ku
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.42 no.2 s.302
    • /
    • pp.11-20
    • /
    • 2005
  • In previous video conference system, when the number of participants in video conference increases by n, the bandwidth and memory of n2 is required. And also, it brings about increase in traffic and problem of a say during a conference in aspect of transmission of voice data. In this paper, we propose an algorithm of remote video conference using silence detection algerian to resolve the questions such as buffering method of video data in server and heavy traffic detection algorithm to the increase in participants. Video data buffering algorithm is not a method of broadcasting to other client in the server, but this algorithm uses two other methods; the buffering method of receiving compressed video data from clients and the indexing method for acquiring the video data of other participants in clients according to clients' bandwidth and network transmission speed. We apply a voice transmission algerian and a channel management algorithm to the remote video conference system. The method used in the voice transmission algorithm is a silence detection algorithm which does not send silent participants' voice data to the server. The channel management algorithm is a method allocating a say to the participants who have priority. In consideration of average 20 frames and 30ms regardless of a number of participants, we can safely conclude that the transmission of video and voice data is stable.

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.

  • PDF

Estimation of Willingness-To-Pay for Extensive Implementation of Congestion Pricing (혼잡통행료제도 확대시행에 따른 지불의사액 추정)

  • Kim, Gun-Young;Han, Sang-Yong;Kang, Kyung-Woo;Kim, Tae-Seung
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.7-14
    • /
    • 2005
  • Traffic congestion causes enormous social costs as well as loss of travel time and waste of energy. Though the Seoul metropolitan government implemented various forms of transportation policies such as urban road pricing and public transportation reform, traffic volume which across the Seoul metropolitan borders have greatly increased because of housing land development in suburban area. The purpose of this study is to estimate individual's willingness-to-pay(WTP) for extensive implementation of congestion pricing through policy-mix with bus rapid transit(BRT) system. So the field survey interviews carried out. The empirical analysis was done with priority given to the following two topics; derivation of individual WTP and prior evaluation of policy effect from the equity aspect. To estimate individual WTP, we adopted contingent valuation method (CVM). The former is to estimate individual WTP for respondent's maintaining his/her transit pattern when he/she is faced with congestion pricing by using compensating variation(CV) concept. And, the latter aims at evaluating policy effect from the equity aspect by calculating the Proportion of WTP to average income using WTP in income bracket for policy scenarios.

Evaluation of Travel Time Prediction Reliability on Highway Using DSRC Data (DSRC 기반 고속도로 통행 소요시간 예측정보 신뢰성 평가)

  • Han, Daechul;Kim, Joohyon;Kim, Seoungbum
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.4
    • /
    • pp.86-98
    • /
    • 2018
  • Since 2015, the Korea Expressway Corporation has provided predicted travel time information, which is reproduced from DSRC systems over the extended expressway network in Korea. When it is open for public information, it helps travelers decide optimal routes while minimizing traffic congestions and travel cost. Although, sutiable evaluations to investigate the reliability of travel time forecast information have not been conducted so far. First of all, this study seeks to find out a measure of effectiveness to evaluate the reliability of travel time forecast via various literatures. Secondly, using the performance measurement, this study evaluates concurrent travel time forecast information in highway quantitatively and examines the forecast error by exploratory data analysis. It appears that most of highway lines provided reliable forecast information. However, we found significant over/under-forecast on a few links within several long lines and it turns out that such minor errors reduce overall reliability in travel time forecast of the corresponding highway lines. This study would help to build a priority for quality control of the travel time forecast information system, and highlight the importance of performing periodic and sustainable management for travel time forecast information.

An Effective Application of AE Technique for the Detection of Defects in Steel Girder Bridges (강판형교에서의 효율적인 결함검출을 위한 AE기법의 적용)

  • Kim, Sang Hyo;Yoon, Dong Jin;Lee, Sang Ho;Kim, Hyung Suk;Park, Young Jin
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.3 s.32
    • /
    • pp.287-300
    • /
    • 1997
  • In this study, an effective application method of AE technique for the detection of fatigue crack in multi-girder steel bridges has been proposed. The applicability has been examined through the laboratory works with bridge model. The proposed analytical method which evaluates the remaining fatigue lives of structural members may improve the rational determination of the priority of inspection for structural members assuming to have fatigue cracks. Laboratory tests for the application of AE technique to steel girder bridges show that the frequency bands of traffic noise are in the range between 10 show that the frequency bands of traffic noise are in the range between 100~200 kHz and the AE signal raised from fatigue cracks is concentrated around 400~500 kHz. Therefore. R30 sensor is proved to be the most suitable for the detection of cracks in steel girder bridges. A linear proportionality between the crack propagation and the frequency of AE signals has been obtained. In addition, an economic and effective source location method for steel girder bridges was studied through experiments.

  • PDF

A Study on the Optimal Width of the Main Span In the 2nd Bridge of lncheon (2) Economic Analysis on Port Operation according to Traffic Schemes in the Main Span (인천항 제2연륙교 적정 주경간 폭 결정에 관한 연구 (2) 주경간의 통항방식에 따른 항만운영의 경제성 분석)

  • Koo Ja-Yun;Kim Seok- Jae;Jang Eun- Kyu
    • Journal of Navigation and Port Research
    • /
    • v.29 no.1 s.97
    • /
    • pp.65-69
    • /
    • 2005
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two-way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.

Development of V2I2V Communication-based Collision Prevention Support Service Using Artificial Neural Network (인공신경망을 활용한 V2I2V 통신 기반 차량 추돌방지 지원 서비스 개발)

  • Tak, Sehyun;Kang, Kyeongpyo;Lee, Donghoun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.18 no.5
    • /
    • pp.126-141
    • /
    • 2019
  • One of the Cooperative Intelligent Transportation System(C-ITS) priority services is collision prevention support service. Several studies have considered V2I2V communication-based collision prevention support services using Artificial Neural Networks(ANN). However, such services still show some issues due to a low penetration of C-ITS devices and large delay, particularly when loading massive traffic data into the server in the C-ITS center. This study proposes the Artificial Neural Network-based Collision Warning Service(ACWS), which allows upstream vehicle to update pre-determined weights involved in the ANN by using real-time sectional traffic information. This research evaluates the proposed service with respect to various penetration rates and delays. The evaluation result shows the performance of the ACWS increases as the penetration rate of the C-ITS devices in the vehicles increases or the delay decreases. Furthermore, it reveals a better performance is observed in more advanced ANN model-based ACWS for any given set of conditions.

Changes in patterns of plastic surgery emergencies at a level I trauma center in India during the COVID-19 pandemic

  • Singh, Veena;Haq, Ansarul;Sharma, Sarsij;Kumar, Sanjeev;Kumar, Aditya;Kumar, Amarjeet;Kumar, Neeraj;Kumar, Anil
    • Journal of Trauma and Injury
    • /
    • v.35 no.2
    • /
    • pp.108-114
    • /
    • 2022
  • Purpose: The coronavirus disease 2019 (COVID-19) pandemic has had major effects worldwide, including sudden and forceful setbacks to the healthcare system. The COVID-19 pandemic has also led to changes in the plastic and reconstructive management of emergency cases, including those due to road traffic accidents. This study analyzed changes in patterns of plastic surgery emergencies and modifications in consultation policies to minimize the exposure of healthcare workers. Methods: Data on plastic surgery emergency calls received from the trauma and emergency department were collected for a period of 2 months before and during lockdown. The data were then analyzed with respect to the cause, mechanism, and site of the injury, as well as other variables. Results: During lockdown, there was a 40.4% overall decrease in the plastic surgery emergency case volume (168 vs. 100). The average daily number of consultations before lockdown was 2.8 as compared to 1.6 during lockdown. Road traffic accidents remained the most common mechanism of injury in both groups (45.8% vs. 39.0%) but decreased in number during the lockdown (77 vs. 39). Household accidents, including burns, were the second most common cause of injury in both phases (7.7% vs. 20.0%), but their proportion increased significantly from 7.7.% to 20.0% in the lockdown phase (P=0.003). The percentage of minor procedures done in the emergency department increased from 53.5% to 72.0% during lockdown (P=0.002). Procedures in the operating room decreased by 73.1% during lockdown (67 vs. 18, P=0.001). Conclusions: The COVID-19 pandemic and lockdown orders in India greatly influenced trends in traumatic emergencies as observed by the plastic surgery team at our tertiary care center. Amidst all the chaos and limitations of the pandemic period, providing safe and prompt care to the patients presenting to the emergency room was our foremost priority.