• Title/Summary/Keyword: Priority Safety Management

Search Result 326, Processing Time 0.029 seconds

A Study on the development of the safety work manual of a small construction site that takes advantage of the risk assessment methods (위험성평가 기법을 활용한 소규모 건설현장 안전작업메뉴얼 개발에 관한 고찰)

  • Park, Jun Ho;Park, Hai Chun;Lee, Kyoung Hun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.301-310
    • /
    • 2013
  • This study compared the disasters in construction field under construction amount of 300,000,000 won and the whole construction fields in order to improve the efficacy of various industrial safety and health policies and services and examined the characteristics of disasters in construction field under 300,000,000 won. It also examined, compared and analyzed the characteristics of disaster in construction field under construction amount of 300,000,000 won that disaster prevention technical experts saw. The subjects of comparison were selected with statistical data of disaster for 2011 and those of disaster in construction field under construction amount of 300,000,000 won from January to August of 2012. And questionnaire was conducted with technical instruction experts of small-sized construction field and priority was drawn, compared and analyzed with AHP. Consequently, the results of different views between actual disaster data and experts' views were obtained. Therefore, this study suggested the characteristics of disaster in construction field under construction amount of 300,000,000 won and presented the methods for improving disaster prevention technical experts.

  • PDF

Decision Making of Seismic Performance Management Using Seismic Risk Assessment (지진위험도평가 방법을 이용한 내진성능관리 의사결정)

  • Kim, Dong Joo;Choi, Ji Hye;Kim, Byeong Hwa
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.23 no.6
    • /
    • pp.329-339
    • /
    • 2019
  • The strategy for the management of earthquakes is shifting from post recovery to prevention; therefore, seismic performance management requires quantitative predictions of damage and the establishment of strategies for initial responses to earthquakes. Currently, seismic performance evaluation for seismic management in Korea consists of two stages: preliminary evaluation and detailed evaluation. Also, the priority of seismic performance management is determined in accordance with the preliminary evaluation. As a deterministic method, preliminary evaluation quantifies the physical condition and socio-economic importance of a facility by various predetermined indices, and the priority is decided by the relative value of the indices; however, with the deterministic method it is difficult to consider any uncertainty related to the return-year, epicenter, and propagation of seismic energy. Also this method cannot support tasks such as quantitative socio-economic damage and the provision of data for initial responses to earthquakes. Moreover, indirect damage is often greater than direct damage; therefore, a method to quantify damage is needed to enhance accuracy. In this paper, a Seismic Risk Assessment is used to quantify the cost of damage of road facilities in Pohang city and to support decision making.

Priority Setting for Future Core Technologies in Biosystems Engineering using the Analytic Hierarchy Process (AHP를 이용한 기계화분야 미래유망기술의 우선순위 설정)

  • 이종인;김만수;조근태;김재한
    • Journal of Biosystems Engineering
    • /
    • v.29 no.2
    • /
    • pp.187-194
    • /
    • 2004
  • The study focused on setting priority among the future core technologies that were derived by Delphi in agricultural management & information using analytic hierarchy process(AHP). Items for setting priority were decided as ‘technology’, ‘market’, and ‘public concerns’by council. The future core technologies were divided into four parts by importance and R&D level. Technologies which consisted of upper two parts having higher importance were considered in the study. Questionnaires were given to 9 specialists in biosystems engineering. As the results, ‘market’ was decided as a most important item. The most important technologies were ‘Developing technology and system of post harvest processing for higher quality rice’ in group I, and ‘Developing sensor technology to evaluate quality and safety for agricultural products’ in group II.

A Study on the Priority Safety Management Items in the Medium and Small sized Construction Sites (중·소규모 건설현장 중점 안전관리 항목에 관한 연구)

  • Jang, Yun-Ra;Go, Seong-seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.38-49
    • /
    • 2020
  • As the quality of life has been improving, people are getting higher interest and higher expectation for safety. However, the accident rate at the construction site is still high. Therefore, it is urgent to secure the safety at the construction work. Due to the nature of the construction industry, construction sites are directly exposed to the external environment. The possibility of accident occurrence is increased due to various factors such as the always variable processes, the diversity of manpower input, the increase in vulnerable class, and the danger of construction equipment..Particularly, the disasters occurring at the small- or medium-sized construction sites (budget ≤ 12 billion KRW) account for 88.9% of the total disasters at construction sites (73.4% for casualty). It was due to the lack of management caused by the absence of supervisors and insufficient safety measures. Moreover, it is difficult for the small- or medium-sized construction sites to apply basic safety measures such as safety education and safety facility installation by themselves in order to prevent disasters because they don't have sufficient safety organizations. It is because they have relatively less safety personnel and poorer technology system than large-sized construction sites. Therefore, in order to reduce accidents in construction, it is necessary to prevent accidents at the small- and medium-sized construction sites. From this point of view, the objectives of this study were to identify the key risk items causing accidents frequently by analyzing the accidents at construction sites and identifying problems associated with safety management, and to secure the safety at the small- and medium-sized construction sites.

The Suitability Evaluation of Training on How to Use Fire Extinguisher through Analyzing Fire Safety Awareness of Preschoolers - Based on Preschoolers in Nowon-gu and Seongbuk-gu - (영유아의 화재안전 의식수준 분석을 통한 소화기 사용 교육의 적합성 평가 - 노원구와 성북구 소재 영유아를 대상으로 -)

  • Lee, Se-Myeoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.155-163
    • /
    • 2014
  • Preschoolers are the most effective age to start fire safety education. But, if the education contents are inappropriate, they may form the wrong habit to preschoolers. Many educational contents of fire safety in Korea are not so obvious in the principle and order of priority about what to do during fire and they often contain unnecessary contents to preschoolers such as how to use fire extinguisher. This paper has analyzed fire safety awareness of preschoolers and teachers and, based on the results, has claimed unsuitability of training on how to use fire extinguisher and has suggested the improvement of fire safety education.

A Study on the Implementation of USN Technologies for Safety Management Monitoring of Architectural Construction Sites (건축공사현장의 안전관리 모니터링을 위한 USN 기술 적용에 관한 연구)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.103-109
    • /
    • 2009
  • The construction industry has the highest death rate related to safety accidents of any industry. Furthermore, in contrast to other industries, where the death rate related to safety accidents has been steadily declining, both the death toll and the number of accidents in the construction industry have been on the rise. Construction accidents occur when various risks increase in an intertwined way to reach a tipping point; a moment when such factors cannot be tolerated any longer Conventional safety management methods have restrictions in terms of their ability to fully prevent all types of safety accidents. This research considers ways in which USN technology can be applied to safety management on a construction site, and derives a method of applying USN technology for safety management monitoring. The tasks related to safety management on construction sites, as well as the occurrence of accidents, are first analyzed. By analyzing the characteristics of construction accidents, the factors that must be a priority and the factors that can be a lower priority are derived. Finally, the configuration of a monitoring system for safety management on a construction site to which USN technology is applied is presented. It is expected that safety accidents can be prevented from occurring on construction sites by applying this cutting-edge USN technology.

A Study on the Investment Priority Using Kano Analysis and AHP (AHP를 이용한 Kano 품질요소의 투자우선순위 결정에 관한 연구)

  • 임성욱;양정희
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.199-209
    • /
    • 2004
  • Kano(1984) distinguishes five types of Quality requirement which influence customer satisfaction; Attractive, One-dimensional, Must-be, Indifferent, Reverse Quality element. Attractive requirements lead more than proportional satisfaction. Attractive Quality requirements are the key factors of order winner and the sources of customer delight. Attractive requirements do not influence customer satisfaction equally. This study presents Kano's model using AHP(Analysis Hierarchy Process) for the priorities of attractive Quality requirements.

A Study on Optimal Marketing Strategy in Kyong Ki Ceramics Industry (경기도자기 산업 최적 마케팅 전략 연구)

  • Kim Chang-Sik;Yang Kwang-Mo;Park Jae-Hyun;Kang Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.57-61
    • /
    • 2006
  • Growth possibility is big to culture tourism resources and representative tourist resort of the Korea that use view of nature photon circle properly such as ceramics that target area possesses. Area development plan through growth possibility should be arranged to international ceramics production complex and distribution complex. Therefore, Marketing analyzing future district theme establishment and strength in priority via past and present of target area.

  • PDF

A Study on the Factors Affecting Consumer Preference of Financial Products (금융상품의 소비자 선호에 미치는 요인에 관한 연구)

  • Chung, Soon-Suk
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.327-337
    • /
    • 2009
  • This paper intends to search factor affecting the selection of financial products by analyzing whether there is difference in the preference of individual financial products whose recognition of importance in the property of financial products in different, depending on the property of investors. The Analytical Hierarchy Process (AHP) is used to test the priority model. The study attempts to demonstrate how the model helps providing better decision choices in financial products.

  • PDF

A Study on the Dispatching Rules of One-process Job Using Computer Simulation (시뮬레이션을 이용한 단공정작업의 스케줄링에 관한 연구)

  • 이기영;김영민
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.2
    • /
    • pp.85-94
    • /
    • 2000
  • This paper deals with the selection of a proper dispatching rule for an one-process Job scheduling that follows a particular distribution of an order production. That is, it makes a distribution on an order per unit period and applies to simulation model that uses it. This study consists of two purposes either seeks adequately production scheduling using priority rule or seeks extension of the facilities that increase current production efficiency through computer simulation in scheduling.

  • PDF