• 제목/요약/키워드: Preventive Maintenance

검색결과 564건 처리시간 0.031초

지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구 (A study on the safety improvement and productivity's increase through continuous preventive maintenance)

  • 양두진;이창호
    • 대한안전경영과학회지
    • /
    • 제7권1호
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구 (A study on the safety improvement and productivity's increase through continuous preventive maintenance.)

  • 양두진;이창호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2004년도 추계학술대회
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

설비예방보전을 위한 TBM의 최적보전주기 설정모델 연구 (A Research on the Determining Model of the Optimizing Maintenance Interval in TBM for the Preventive Maintenance of Facilities)

  • 권오운;이홍철
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2003년도 춘계공동학술대회
    • /
    • pp.105-117
    • /
    • 2003
  • The purpose of this research aimed at performing the easy design. and also the easy on-the-job application or the maintenance interval determination methodology by presenting the determining model or the optimizing maintenance interval in TBM for the preventive maintenance or facility TBM(time-based maintenance) as the preventive maintenance requires the adequate determination or the maintenance interval. The maintenance interval or TBM shall be applied differently for the each interval such as He patrol inspection, maintenance, overhaul inspection. exchange. And it is based on the composition level of equipment. The already informed theories or interval determination methodology for the patrol inspection. repair. and overhaul inspection are difficult for adopting because or the several restriction problems in applying the maintenance schemes as the theory So, the model for determining the optimizing exchange interval or part, maintenance interval of auxiliary machine, unit equipment etc. was presented to apply in the maintenance easily and appropriately.

  • PDF

Markov State Model을 이용한 복합화력 발전설비의 최적의 유지보수계획 수립 (Application Markov State Model for the RCM of Combustion Turbine Generating Unit)

  • 이승혁;신준석;김진오
    • 전기학회논문지
    • /
    • 제56권2호
    • /
    • pp.248-253
    • /
    • 2007
  • Traditional time based preventive maintenance is used to constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is scheduled by RCM(Reliability-Centered Maintenance) evaluation. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by a Markov model. In case study, simulation results about RCM are used to the real historical data of combustion turbine generating units in Korean power systems.

EPRI의 예방정비기초자료에 근거한 원전 증기터빈의 예방정비기준 개발 (Development the Preventive Maintenance Template of the Nuclear Steam Turbine based on EPRI PMBD)

  • 이병학;이혁순
    • 한국압력기기공학회 논문집
    • /
    • 제6권1호
    • /
    • pp.1-8
    • /
    • 2010
  • The existing maintenance program is focused on time-based maintenance to inspect and repair components according to maintenance period, rather than condition-based maintenance or predictive maintenance. The preventive maintenance template of the steam turbine has been developed for optimizing maintenance procedure and improving reliability and availability of the steam turbine of nuclear power plants based on EPRI PM template methodology and EPRI technical reports about preventive maintenance.

  • PDF

클러스터 툴의 예방유지보수 스케줄링 모형 (A Preventive Maintenance Scheduling Model of the Cluster Tool)

  • 이현;박유진;허선
    • 산업공학
    • /
    • 제25권1호
    • /
    • pp.127-133
    • /
    • 2012
  • This paper considers the preventive maintenance scheduling problem of the cluster tool which is one of the most important manufacturing equipments in the next-generation semiconductor production environment. We define a random process that expresses the successive amount of chemicals accumulating inside the tool. Based on the renewal theory, we find the expected value and probability distribution of the time that the amount of accumulated chemicals exceeds a predetermined level. For a given probability that the accumulated chemicals exceeds the predetermined level we present a method to obtain the number of chamber operations to perform the preventive maintenance of that chamber. In addition, a method to get the preventive maintenance schedule for the whole cluster tool is presented. A numerical example is provided to illustrate our method.

Optimal Preventive Maintenance Policy Based on Aperiodic Model

  • Kim, Hee-Soo;Yum, Joon-Keun;Park, Dong-Ho
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2000년도 추계학술대회
    • /
    • pp.335-342
    • /
    • 2000
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. The PM improves the reliability of the system by predicting the possible failures and thereby preventing such failures from its occurrence. In this paper, we develop the optimal preventive maintenance policies based on the aperiodic PM model. We investigate an aperiodic preventive maintenance policy and propose several optimal PM policies which minimize the expected cost over an infinite time span. Park, Jung and Yum(2000) determine the optimal period and the optimal number of PMs based on Canfield's(1986) periodic model. Our techniques to derive the optimal preventive maintenance policies based on our aperiodic PM model is similar to those in Park, Jung and Yum(2000), which can be considered as the special case of our results.

  • PDF

Predictive and Preventive Maintenance using Distributed Control on LonWorks/IP Network

  • Song, Ki-Won
    • International Journal of Safety
    • /
    • 제5권2호
    • /
    • pp.6-11
    • /
    • 2006
  • The time delay in servo control on LonWorks/IP Virtual Device Network (VDN) is highly stochastic in nature. LonWorks/IP VDN induced time delay deteriorates the performance and stability of the real-time distributed control system and hinders an effective preventive and predictive maintenance. Especially in real-time distributed servo applications on the factory floor, timely response is essential for predictive and preventive maintenance. In order to guarantee the stability and performance of the system for effective preventive and predictive maintenance, LonWorks/IP VDN induced time delay needs to be predicted and compensated for. In this paper position control simulation of DC servo motor using Zero Phase Error Tracking Controller (ZPETC) as a feedforward controller, and Internal Model Controllers (IMC) based on Smith predictor with disturbance observer as a feedback controller is performed. The validity of the proposed control scheme is demonstrated by comparing the IMC based on Smith predictor with disturbance observer.

불안전한 유지보수를 고려한 전력 설비의 예방 정비 계획 (Preventive Maintenance Plan of Power System Unit Considering Imperfect Maintenance)

  • 변융태;김형준;김진오;김형철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.328-330
    • /
    • 2007
  • Recently, the research of PM (Preventive Maintenance) method on the RCM(Reliability-Centered Maintenance) of the system equipment is being actively advanced for a few years. The state of the power equipment is maintained like the states of the between 'as good as new ones' and 'as bad as old ones' by imperfect Maintenance that implies the life decrease of the equipment by frequent breakdown, the error of maintenance process, and so on. So, the Maintenance method considering the real case has to reflect Imperfect maintenance than perfect maintenance. This paper suggests the Preventive Maintenance method by using Quasi - Renewal Theory for the gas turbine equipment as deliberating the imperfect maintenance for the real cases.

  • PDF

연장된 보증을 갖는 예방보전모형 (Preventive maintenance model with extended warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권4호
    • /
    • pp.773-781
    • /
    • 2013
  • 최근에 기본 보증이 종료된 이후에 주어지는 시스템의 연장된 보증에 대한 관심이 증가되고 있다. 따라서 본 논문에서는 사용자 측면에서 최소수리보증이 있는 연장된 보증이 종료된 이후의 예방보전모형을 제안하였다. 이 때, 기본 보증과 연장된 보증 하에서 고장이 발생된 시스템에는 판매자에 의해서 무료로 최소수리가 이루어진다. 이러한 제안된 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 유도하였다. 또한, 유도된 단위시간당 기대비용을 최소화 하는 최적의 예방보전 주기와 예방보전 횟수를 결정하였다. 끝으로 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.