• 제목/요약/키워드: Preventive Maintenance(PM)

검색결과 61건 처리시간 0.024초

Optimal Preventive Maintenance Policy Based on Aperiodic Model

  • Kim, Hee-Soo;Yum, Joon-Keun;Park, Dong-Ho
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2000년도 추계학술대회
    • /
    • pp.335-342
    • /
    • 2000
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. The PM improves the reliability of the system by predicting the possible failures and thereby preventing such failures from its occurrence. In this paper, we develop the optimal preventive maintenance policies based on the aperiodic PM model. We investigate an aperiodic preventive maintenance policy and propose several optimal PM policies which minimize the expected cost over an infinite time span. Park, Jung and Yum(2000) determine the optimal period and the optimal number of PMs based on Canfield's(1986) periodic model. Our techniques to derive the optimal preventive maintenance policies based on our aperiodic PM model is similar to those in Park, Jung and Yum(2000), which can be considered as the special case of our results.

  • PDF

Optimal Preventive Maintenance Policy for a Repairable System

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • 제17권2호
    • /
    • pp.367-377
    • /
    • 2006
  • This paper develops a periodic preventive maintenance(PM) policy following the expiration of warranty. Two types of warranty are considered: renewing warranty and non-renewing warranty. Also, we consider the situation where each PM cost is an increasing function of the PM effect. We determine the optimal number of PM's before replacing the system by a new one and the optimal length of period for the periodic PM following the expiration of warranty. Explicit solutions to determine the optimal periodic PM are presented for the Weibull distribution case.

  • PDF

Cost optimization for periodic PM policy

  • Jung, Ki-Mun
    • 한국통계학회:학술대회논문집
    • /
    • 한국통계학회 2005년도 추계 학술발표회 논문집
    • /
    • pp.73-78
    • /
    • 2005
  • This paper considers a preventive maintenance policy following the expiration of renewing warranty, Most preventive maintenance models assume that each PM costs a fixed predetermined amount regardless of the effectiveness of each PM. However, it seems more reasonable to assume that the PM cost depends on the degree of effectiveness of the PM activity. In this paper we consider a periodic preventive maintenance policy following the expiration of renewing warranty when the PM cost is an increasing function of the PM effect. The optimal number and period for the periodic PM policy with effect dependent cost that minimize the expected cost rate per unit time over an infinite time span are obtained.

  • PDF

개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구 (Optimal Periodic Preventive Maintenance with Improvement Factor)

  • Jae-Hak Lim
    • 품질경영학회지
    • /
    • 제31권3호
    • /
    • pp.193-204
    • /
    • 2003
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

불완전보전을 고려한 시스템의 최적 정기 예방보전 시기 (Optimum Periodic Preventive Maintenance Time for a System with Imperfect Maintenance)

  • 정영배
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.221-226
    • /
    • 1994
  • Almost preventive maintenance policies assumed that the system after pm has failure rate as before pm with probability p and as good as new with probability 1-p. This paper considers the s-expected cost of the model with imperfect periodic preventive maintenance that increasing minimal repair costs at failure and obtains the optimum periodic preventive maintenance time. Numerical example are shown in which the failure time of the system has gamma distribution.

  • PDF

비용 종속적인 개선지수를 고려한 최적 예방보전 정책 (Optimal Preventive Maintenance Policy with Cost-dependent Improvement Factor)

  • 홍석수;박종훈;이창훈
    • 대한산업공학회지
    • /
    • 제36권2호
    • /
    • pp.108-116
    • /
    • 2010
  • The maintenance of a deteriorating system is often imperfect. Previous studies have shown that the imperfect preventive maintenance (PM) can reduce the wear out and aging effects of deteriorating systems to a certain level between the conditions of as good as new and as bad as old. In this paper, we employ the concept of the improvement factor in investigating two optimal PM policies; failure limit policy and periodic PM policy. We redefine the improvement factor model as a function of the cost of PM, using this concept, we derive the conditions of optimal PM policies and formulate expressions to compute the expected cost rate. Based on this information, the determination of the maintenance policies which minimize the cost rate is examined. Numerical examples for the Weibull distribution case are also given.

Extension of PM Model with Random Maintenance Quality

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • 제13권3호
    • /
    • pp.651-656
    • /
    • 2006
  • Wu and Clements-Croome (2005) investigate the optimization problem of PM policies for situations where the quality of PM is a random variable with a certain probability distribution. However, they assume that the cost of preventive maintenance is constant, not depending on the quality of PM. Thus, this paper considers a periodic PM model when PM cost depends on the quality of PM activity. The optimal PM policy are presented for the extended PM model and the numerical examples are presented for illustrative purpose.

On determining a non-periodic preventive maintenance schedule using the failure rate threshold for a repairable system

  • Lee, Juhyun;Park, Jihyun;Ahn, Suneung
    • Smart Structures and Systems
    • /
    • 제22권2호
    • /
    • pp.151-159
    • /
    • 2018
  • Maintenance activities are regarded as a key part of the repairable deteriorating system because they maintain the equipment in good condition. In practice, many maintenance policies are used in engineering fields to reduce unexpected failures and slow down the deterioration of the system. However, in traditional maintenance policies, maintenance activities have often been assumed to be performed at the same time interval, which may result in higher operational costs and more system failures. Thus, this study presents two non-periodic preventive maintenance (PM) policies for repairable deteriorating systems, employing the failure rate of the system as a conditional variable. In the proposed PM models, the failure rate of the system was restored via the failure rate reduction factors after imperfect PM activities. Operational costs were also considered, which increased along with the operating time of the system and the frequency of PM activities to reflect the deterioration process of the system. A numerical example was provided to illustrate the proposed PM policy. The results showed that PM activities performed at a low failure rate threshold slowed down the degradation of the system and thus extended the system lifetime. Moreover, when the operational cost was considered in the proposed maintenance scheme, the system replacement was more cost-effective than frequent PM activities in the severely degraded system.

Aperiodic Preventive Maintenance Model and Parameter Estimation

  • Kim, Hee-Soo;Yum, Joon-Keun;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • 제1권1호
    • /
    • pp.15-26
    • /
    • 2000
  • This paper considers an aperiodic preventive maintenance (PM) model for repairable systems, in which the time intervals between two consecutive preventive maintenances are unequal. To propose such an aperiodic PM model, we assume that each PM reduces the current hazard rate by a certain amount which depends on the number of PMs performed previously. If the system fails between PMs, the minimal repair is performed and the hazard rate remains unchanged after the repair. We give the exact expressions for the hazard rate function for the aperiodic PM model. Based on the proposed aperiodic PM model, we suggest the maximum likelihood method to estimate the parameters characterizing the model and apply the method to the case of Weibull distribution. Numerical examples for estimating the parameters are presented for the purpose of illustration.

  • PDF

EPRI의 예방정비기초자료에 근거한 원전 증기터빈의 예방정비기준 개발 (Development the Preventive Maintenance Template of the Nuclear Steam Turbine based on EPRI PMBD)

  • 이병학;이혁순
    • 한국압력기기공학회 논문집
    • /
    • 제6권1호
    • /
    • pp.1-8
    • /
    • 2010
  • The existing maintenance program is focused on time-based maintenance to inspect and repair components according to maintenance period, rather than condition-based maintenance or predictive maintenance. The preventive maintenance template of the steam turbine has been developed for optimizing maintenance procedure and improving reliability and availability of the steam turbine of nuclear power plants based on EPRI PM template methodology and EPRI technical reports about preventive maintenance.

  • PDF