• Title/Summary/Keyword: Present cost

Search Result 3,273, Processing Time 0.033 seconds

Determination of Number of AGVs in Multi-Path Systems By Using Genetic Algorithm (GA를 이용한 다중경로의 시스템의 AGV 대수 결정 문제)

  • Kim, Hwan-Seong;Lee, Sang-Hun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.4
    • /
    • pp.319-325
    • /
    • 2001
  • Recently. AGV systems are used to serve the raw material to each work stations automatically. There exists a trade-off between the adequate service supply and the number of purchased AGVs. Also, to reduce the overall production cost, the amount of inventory hold on the shop floor should be considered. In this paper, we present a heuristic technique for determining the number of AGVs which includes the net present fixed costs of each station, each purchased AGV, delivering cost, stock inventory cost, and safety stock inventory cost. Secondly, by using a genetic algorithm, the optimal number of AGVs and the optimal reorder quantity at each station are decided. Lastly, to verify then heuristic algorithm, we have done a computer simulation with different GA parameters.

  • PDF

Economic Analysis of Heat Pump System through Actual Operation (히트 펌프 냉난방 시스템의 실사용을 통한 경제성 분석)

  • Shin, Gyu-Won;Kim, Gil-Tae;Joo, Ho-Young;Lee, Jae-Keun
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.921-926
    • /
    • 2006
  • The present study has been conducted economic analysis through actual operation of EHP and GHP which are installed at the same building of an university Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze LCC and economical efficiency is compared. The initial cost is considered on the basis of actual costs, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day. LCC applied present value method is used to assess economical efficiency of both them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives and when each of them are 4%, 2%, 8%, and 20 years, results of analysis short that EHP(148,257,306 won) is 8.05%(12,981,990 won) more profitable than GHP(161,239,295 won).

  • PDF

Cost effective design of RC building frame employing unified particle swarm optimization

  • Payel Chaudhuri;Swarup K. Barman
    • Advances in Computational Design
    • /
    • v.9 no.1
    • /
    • pp.1-23
    • /
    • 2024
  • Present paper deals with the cost effective design of reinforced concrete building frame employing unified particle swarm optimization (UPSO). A building frame with G+8 stories have been adopted to demonstrate the effectiveness of the present algorithm. Effect of seismic loads and wind load have been considered as per Indian Standard (IS) 1893 (Part-I) and IS 875 (Part-III) respectively. Analysis of the frame has been carried out in STAAD Pro software.The design loads for all the beams and columns obtained from STAAD Pro have been given as input of the optimization algorithm. Next, cost optimization of all beams and columns have been carried out in MATLAB environment using UPSO, considering the safety and serviceability criteria mentioned in IS 456. Cost of formwork, concrete and reinforcement have been considered to calculate the total cost. Reinforcement of beams and columns has been calculated with consideration for curtailment and feasibility of laying the reinforcement bars during actual construction. The numerical analysis ensures the accuracy of the developed algorithm in providing the cost optimized design of RC building frame considering safety, serviceability and constructional feasibilities. Further, Monte Carlo simulations performed on the numerical results, proved the consistency and robustness of the developed algorithm. Thus, the present algorithm is capable of giving a cost effective design of RC building frame, which can be adopted directly in construction site without making any changes.

The Optimal Microgrid Configuration Depending on the Change of Average Wind Speed and Fuel Cost (평균풍속 및 유가변동에 따른 최적 마이크로그리드 구성)

  • Kim, Kyu-Ho;Lim, Sung-Yong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.35-40
    • /
    • 2015
  • This paper presents the optimal network configuration for electric stations using HOMER software. For the given data such as annual average wind speed and grid costs, this software calculates the NPC(Net Present Cost), operating cost and COE(Cost of Energy). Based on these simulation results, it is possible to find the optimal network configuration for electric stations depending on the grid cost and average wind speed. When the rising grid cost is considered, it is essential to use grid and renewable energy together. Depending on the increase of the grid cost, NPC of the configuration using renewable energy and grid can be gradually getting smaller than NPC of the configuration using only grid.

The Comparative Analysis of the Present and Expected Level on Meal-Price and Facilities Investment Cost Perceived by Foodservice Managers of Contract-Managed Highschools in Seoul (서울시내 고등학교 위탁급식의 급식비와 투자비의 실태 및 위탁업체의 기대수준 비교 분석)

  • Bae, Hwan-Mee;Kim, Hyun-Ah;Shin, Seo-Young;Jo, Mi-Na;Park, Su-Yeon;Cha, Jin-A;Yi, Bo-Sook;Yang, Il-Sun
    • Journal of the Korean Society of Food Culture
    • /
    • v.17 no.5
    • /
    • pp.578-583
    • /
    • 2002
  • The purposes of this study were to a) find out the operational characteristics of the contract-managed highschool foodservice in Seoul, b) investigate the expected level of meal-price and facilities investment cost perceived by contract-managed highschool foodservice managers c) compare the present level and expected level of meal-price and facilities investment cost. From October 12 to November 13 in 2001, the questionnaires were mailed to 249 high schools which was managed by contract foodservice company with respondent rate 40.2%. Data were analyzed using SPSS Win(10.0) for descriptive analysis and one group paired t-test. The results of this study were as follows ; 1. The student enrollment of highschools run by contract-managed foodservice was 1,243 with 72.6% participation rate of school lunch program. The average meal-price was 2,138 won. The average annual period of school foodservice operation was 156.78 days per year. The average contracting period was about 3 years. 2. The average cost concerned in the facilities investment amounts 169,578,180 won at the initial investment and 25,204,092 won at the repairs and maintenance cost in the course of operation. 3. The present level of meal-price and facilities investment cost were respectively 2,136won/meal and 171,157,336.72 won. And expected level of meal-price and amount of facilities investment cost were 2,418.75 won and 121,353,215.19 won. Comparing the present level with the expected level of the meal- price and facilities investment cost, expected level of meal-price was significantly higher than the present level of meal-price(p<.001) and expected level of facilities investment cost was significantly lower than present level of facilities investment cost(p<.001).

A Study on the Benefit-Cost Analysis of Photovoltaic System in the Greenhome (그린홈 적용 태양광 발전시스템의 편익비용분석에 관한 연구)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.18 no.3
    • /
    • pp.112-117
    • /
    • 2014
  • The purpose of this study is to suggest the benefit-cost analysis for photovoltaic system in greenhome. Perspectives of benefit-cost analysis for photovoltaic system in greenhome is participant, non-participant, administrator and nation. This study identifies the cost and benefit components and benefit-cost calculation procedures from four major perspectives : participant, non-participant, administrator and nation. The results of benefit-cost analysis from each perspective can be expressed in a variety of ways, but in all cases it is necessary to calculate the net present value of photovoltaic system impacts over the lifecycle of those impacts.

Cost Benefit Analysis on the Economic Effect of the Water Fluoridation Program in Some Area of Cheong-Ju City (청주시 일부지역의 수돗물불소화사업 비용-편익 분석)

  • 정희웅;안형식;박형근;문혁수;조수헌;이희영;윤석준
    • Health Policy and Management
    • /
    • v.13 no.1
    • /
    • pp.23-45
    • /
    • 2003
  • This study was performed to evaluate economic effect of the water fluoridation program in Cheong-Ju City from 1982 to 2010. To study this economic effect, this study used cost-benefit analysis methodology from eight years old to fourteen years old in Cheong-Ju City. Major findings were as follows; First, total cost of fluoridation program in Cheong-Ju City was 1,384,164,734 korean won and total benefit was 15,057,426,621 Korean won from 1982 to 2010. Second, total cost which was converted by present value 2000 year was 1,687,412,718 won and total benefit which was converted by present value 2000 year was 14,582,548,519 Korean won. Cost-benefit ratio was 8.64. Net present value which happened from 1982 to 2000 was 7,990,710,155 Korean won and cost benefit ratio was 7.47. In conclusion, by the above result, economic impact of the water fluoridation program was very effective for children in some area of Cheong-Ju city.

A Study on the Development of Optimal Alternative Selection Model to Renew Building Equipments System (건축설비시설의 갱신을 위한 최적 대체안 선정모델 개발에 관한 연구)

  • 윤동원;이정재;정광섭;한화택;정순성
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.10
    • /
    • pp.950-961
    • /
    • 2000
  • The objective of this study is to develop optimal alternative selection model for renewing building equipments system. Cost Breakdown Structure of LCC in HVAC systems are deduced from resonable data and factors. As for Cost Breakdown Structure of LCC in HVAC system, pertinent level, title, CBS number, and block number are determined efficiently. Especially, in addition to current cost factor, it is possible to make Cost Breakdown Structure using present worth method more clear. A model of POWER LCC ver 1.0 used to analyze primary cooling system, heating system, and air conditioning system are POWER LCC ver 1.0_/sub SYSTEM/ : C1+ C2- C3+ C4+ C5+ C6+ C7±C8+ C9- C10/sub -1/+ C10/sub -2/+ C10/sub -3/, and is implemented with consideration of Cost Breakdown Structure and their summation using present-worth method. It is programmed with one of scientific languages, MATLAB 5.3.

  • PDF

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Economic Analysis of Heat Pump System through Actual Operation (교육 시설에서의 히트 펌프 냉난방 시스템 실사용을 통한 경제성 분석)

  • Kim, Gil-Tae;Cheong, Seong-Ir;Joo, Ho-Young;Ahn, Young-Chull;Lee, Jae-Keun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.6
    • /
    • pp.470-475
    • /
    • 2007
  • The present study has been conducted economic analysis through actual operation of electric heat pump (EHP) and gas engine driven heat pump (GHP) which are installed at the same building in the university. Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and economical efficiencies are compared. The initial cost is considered on the basis of actual cost, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives when each of them are 4%, 2%, 8%, and 20 years. The result shows that EHP (148,257,306 won) is more profitable than GHP (161,239,296 won) by 8.05% (12,981,990 won).