• Title/Summary/Keyword: Preliminary Plans

Search Result 132, Processing Time 0.024 seconds

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Study on Consideration Plan of Environmental Influence in Preliminary Feasibility Investigation of Railroad Work (철도사업의 예비타당성조사시 환경영향 고려방안에 관한 연구)

  • Sun, Hyo-Sung;Park, Young-Min
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1178-1183
    • /
    • 2006
  • This paper describes the plans of considering the environmental influences in the preliminary feasibility investigation of railroad work. Because the cost-benefit analysis method about the environmental costs by air pollution and traffic noise is mainly applied in preliminary feasibility investigation, not only the verification in the calculation method of these environmental costs but also the consideration in the environmental costs of the topographical damage and the ecosystem extinction by railroad work is needed. The environment-friendly plans in choosing the locations of the railroad route and station are also suggested, and they include (1) consideration of environment protection area, residential zone, and region with scenic beauty, (2) application of the existing railroad route and station, and (3) railroad route parallel to another traffic facility.

  • PDF

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

Parametric study on Continuous Welded Rail and Bridge interaction (장대레일 궤도와 교량의 상호작용에 대한 매개변수 분석)

  • Kim, Jong-Min;Han, Sang-Yun;Lim, Nam-Hyoung;Kang, Young-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.303-306
    • /
    • 2007
  • CWR(Continuous Welded Rail) and bridge interaction produce rail force, bridge displacement and rail/bridge relative displacement. Each of these has limitation by many codes. In this paper, analysis of interaction has been carried out by using foreign codes(UIC 774-3 R code of Europe etc.) because there is no code about interaction between rail and bridge in Korea. Recently, railway bridges with CWR has been constructed for structural and economical reasons. When designer plans railway bridges, design a bridge model first and then investigate railway forces and displacement by interaction analysis. If these results go out bounds from limitation, designer plans railway bridges again and again. In this paper, using the parametric study on CWR and railway bridge interaction, railway bridge parameters such as length of bridge span, area of bridge, moment of inertia, stiffness of pier, etc. are presented. It helps preliminary design of railway bridges.

  • PDF

Parametric Study on Properties of bridge by CWR(Continuous Welded Rail) and Bridge Interaction Analysis (장대레일과 교량의 상호작용 해석을 통한 교량제원 매개변수 분석)

  • Kim, Jong-Min;Han, Sang-Yun;Lim, Nam-Hyoung;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1460-1465
    • /
    • 2007
  • CWR(Continuous Welded Rail) and bridge interaction produce rail force, bridge displacement and rail/bridge relative displacement. Each of these has limitation by many codes. In this paper, analysis of interaction has been carried out by using foreign codes(UIC 774-3 R code of Europe etc.) because there is no code about interaction between rail and bridge in Korea. Recently, railway bridges with CWR has been constructed for structural and economical reasons. When designer plans railway bridges, design a bridge model first and then investigate railway forces and displacement by interaction analysis. If these results go out bounds from limitation, designer plans railway bridges again and again. In this paper, using the parametric study on CWR and railway bridge interaction, railway bridge parameters such as length of bridge span, area of bridge, moment of inertia, stiffness of pier, etc. are presented. It helps preliminary design of railway bridges.

  • PDF

Parametric Study on Rail and Bridge Interaction (레일과 교량의 상호작용 매개변수 분석 연구)

  • Kim, Jong-Min;Han, Sang-Yun;Lim, Nam-Hyoung;Kim, Jung-Hun;Kang, Young-Jong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.445-450
    • /
    • 2007
  • CWR(Continuous Welded Rail) and bridge interaction produce rail force, bridge displacement and rail/bridge relative displacement. Each of these has limitation by many codes. In this paper, analysis of interaction has been carried out by using foreign codes(UIC 774-3 R code of Europe etc.) because there is no code about interaction between rail and bridge in Korea. Recently, railway bridges with CWR has been constructed for structural and economical reasons. When designer plans railway bridges, design a bridge model first and then investigate railway forces and displacement by interaction analysis. If these results go out bounds from limitation, designer plans railway bridges again and again. In this paper, using the parametric study on CWR and railway bridge interaction, railway bridge parameters such as length of bridge span, area of bridge, moment of inertia, stiffness of pier, etc. are presented. It helps preliminary design of railway bridges.

  • PDF

Thermal dehydration tests of FLiNaK salt for thermal-hydraulic experiments

  • Shuai Che;Sheng Zhang;Adam Burak;Xiaodong Sun
    • Nuclear Engineering and Technology
    • /
    • v.56 no.3
    • /
    • pp.1091-1099
    • /
    • 2024
  • Fluoride-salt-cooled High-temperature Reactor (FHR) is a promising nuclear reactor technology. Among many challenges presented by the molten fluoride salts is the corrosion of salt-facing structural components. Higher moisture contents, in the FLiNaK (LiF-NaF-KF, 46.5-11.5-42 mol%) salt, aggravate intergranular corrosion and pitting for the given alloys. Therefore, several thermal dehydration tests of FLiNaK salt were performed with a batch size suitable for thermal-hydraulic experiments. Thermogravimetric Analysis (TGA) was performed for the three constituent fluoride salts individually. Preliminary thermal dehydration plans were then proposed for NaF and KF salts based on the TGA curves. However, the dehydration process may not be required for LiF since its low mass loss (<1.3 wt%). To evaluate the performance of these thermal dehydration plans, a batch-scale salt dehydration test facility was designed and constructed. The preliminary thermal dehydration plans were tested by varying the heating rates, target temperature, and holding time. The sample mass loss data showed that the high temperatures (>500 ℃) were necessary to remove a significant amount of moisture (>1 wt%) from NaF salt, while relatively low temperatures (around 300 ℃) with a long holding time (>10 h) were sufficient to remove most of the moisture from KF salt.

PRELIMINARY TRANSFER ORBIT MISSION ANALYSIS OF COMS

  • Kim, Bang-Yeop;Gicquel, Anne-Helene;Brichler, Geoffroy
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.336-339
    • /
    • 2006
  • In this paper, the preliminary transfer orbit analysis results for the COMS mission were presented. As the first step of transfer orbit analysis, the preliminary analyses of LAE burn strategy, geometrical visibility, and launch window were performed. For the analysis process, all launcher nominates were divided into three groups according to the declination of LAE thrust angle. So, the three launch cases were assigned as the representative launcher of each group, respectively. They are Ariane-5, Atlas summer and winter launch cases. And all analyses were performed at the representative launcher of each group. One nominal and three back-up plans were considered for the establishment of LAE burn strategy. And for geometrical visibility analysis, four TT&C ground stations were considered. Finally, the preliminary launch window analysis was performed about the duration of one year from the first day of September 2008. The analysis results show that the all launch cases comply with the transfer orbit operation requirements.

  • PDF

Recognition and Preference of Legalized Expansion of Living Space to Balcony (발코니 확장의 합법화에 대한 인식 및 선호)

  • Park, Kyoug-Ok;Lee, Sang-Un
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.97-102
    • /
    • 2006
  • The purpose of this study is to suggest complementary measures to the statute legalizing the expansion of living space to balcony, by means of survey on the recognition and preference of preliminary applicants for new apartments. The survey was done on 130 preliminary applicants who visited 3 model houses opened in Cheongju in June to July, 2006. Conclusions are as follows. (1) Most of preliminary applicants knew that the expansion of living space to balcony were legalized, but were not quite aware of legal details, so that more active publicity is needed by the government. In addition, if the government has a plan to impose tax to expanded space, it has to make clear the definition of the balcony space. (2) Preliminary applicants wanted space expansion of living room, main bed room and children's bed room in order, which implies that constructors have to suggest variety of expansion plans overpassing simple space expansion. (3) Preliminary applicants attached importance on the safety of expanded space. The management office is recommended to have the right to superintend its safety after construction.

  • PDF

The application of the Intuitive Method to Evaluate Feasibilities of Railway Project (철도사업에의 직관적 타당성 평가모형 적용)

  • Kim, Hyun-Woong;Hyeon, Jae-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.437-441
    • /
    • 2010
  • The SOC project such as road and railway performs a preliminary feasibility study according to the priority of the individual projects after establishing the master plans. For a preliminary feasibility study, feasibility evaluation should be performed according to the transport demand estimation and economic analysis. The feasibility of individual project will be performed by focussing on the results of analyzing economic feasibility. In case that analysis of the traffic demand and the economic feasibility every phase is performed, a lot of time and expense will be required in the course of promoting projects. So this study could give help to determine the priority of the project by intuitive method only in the phase to establish the master plan and a preliminary feasibility study.

  • PDF