• 제목/요약/키워드: Preliminary Cost Management

검색결과 106건 처리시간 0.027초

WEB FRONT-END COMPUTING RELATIONAL DATABASE SYSTEM FOR ITEM-LEVEL PRELIMINARY HIGHWAY COST ESTIMATES

  • Jui-Sheng Chou ;James T. O'Connor ;Khali R. Persad ;Wai Kiong Chong
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.509-514
    • /
    • 2005
  • In recent years, use of the web technologies and on-line process has immensely swapped single-user platform practice. This study attempted to develop preliminary cost estimating program by means of Web technologies based on statistical modeling results. A prototype Web-based Preliminary Item-Level Cost Estimating System (WBPILCES) using open source software was developed as an on-line estimating tool in this research. The primary objective is to study the possible flexibility of implementing a centralized information system that will be maintained by the Texas Department of Transportation (TxDOT) IT division. The full-scale deployment of proposed information architecture is expected to seamlessly integrate with legacy database system currently used by TxDOT so as to streamline data storage, cost growth tracking and estimates documentation.

  • PDF

철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 - (A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway -)

  • 서상교;성덕룡;노병국;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.

  • PDF

국가연구개발사업의 전주기 관리방안 탐색: 연구개발 부문 예비타당성조사 제도를 중심으로 (Exploration of Life-cycle Management for Government R&D Program: the Case of Preliminary Feasibility Study on R&D Program)

  • 안상진;박은지;이윤빈
    • 기술혁신학회지
    • /
    • 제17권1호
    • /
    • pp.124-145
    • /
    • 2014
  • 국가연구개발사업은 시장실패를 교정하기 위한 정부정책 구현에 있어서 매우 중요한 활동이며 최근 재정규모의 확대로 인해 성과평가에 대한 중요성과 더불어 효율적인 관리체계 구축에 대한 논의가 진행되는 분야이다. 본 연구는 이러한 국가연구개발사업에 대해 전주기 관리방안을 모색하기 위한 탐색 연구이다. 체계적인 논의에 있어서 관리체계에 대한 사항을 사전평가의 관점을 중심으로 살펴보았다. 국외 사례와 국내 제도의 비교를 통해 현행 국가연구개발사업의 수명주기 관리와 관련하여 제도차원의 고려사항을 도출했고 국가연구개발사업의 사전분석에 대한 사례 자료를 수집하고 분석을 수행하였다. 이를 통해 현재 제도상의 문제점을 구체화하였으며 향후 국가연구개발사업의 전주기적 관리를 효과적으로 적용하기 위해서 연구개발 정부지출의 범주화와 지출성격에 따른 관리체계 이원화가 필요함을 제시하였다.

RC라멘교의 기본설계단계 개략공사비 산정모델 (The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge)

  • 김병수;권석현
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • 건설공사에 소요되는 공사비의 개략적인 산정은 건설프로젝트의 계획단계뿐만 아니라 기본설계단계에서 예산을 확정하기 위해서 필수적이다. 현재 국내의 개략공사비 산정모델은 단위길이당 단가 또는 단위면적당의 단가를 이용하여 계산하는 선형적인 단순 모델로써 오차율이 너무 큰 문제점이 있다. 본 연구에서는 과다한 오차율의 문제를 해결하기 위하여 RC라멘교의 특성을 고려하였으며 공사비의 변동특성에 따라 그룹핑(Grouping) 및 대표물량방식 그리고 합성단가를 사용한 모델을 개발하였다. 본 연구의 결과 실제 설계공사비와의 오차를 상당히 줄일 수 있었으며 따라서 발주처나 용역업체에서 RC라멘교의 예산을 산정하는데 기여할 것으로 기대한다.

EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

산업안전보건관리비 계상기준 개선방안 연구 (A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards)

  • 안방율;송태석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF

초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 - (Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok)

  • 강승희;정영수
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.48-56
    • /
    • 2020
  • 기획단계에서의 공사비 예측은 타당성 분석, 예산 책정, 계획수립 등을 위한 기초정보를 제공한다는 점에서 성공적인 프로젝트 수행을 위한 중요한 요소이다. 본 연구에서는 초기 기획단계의 신한옥 공사비 예측 정확도 향상을 목적으로 전체 공사비 중 가장 많은 비중을 차지하는 목공사는 다양한 조건(구조형식, 지붕형태, 평면형태 등)에 의해 개략 물량을 자동 산출하여 공사비를 예측하고, 이외의 공종은 단위단가식을 적용해 공사비를 예측하는 모델을 제시하였다. 2개의 사례를 대상으로 개략 견적 모델로써의 활용성 및 타당성을 검증하였으며, 총공사비의 오차율은 각각 -4%(사례 1), -6%(사례2)로 나타났다. 이러한 결과값은 초기 기획단계에서 실무활용 가능한 범위에서의 오차를 보였다.

공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구 (A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market)

  • 김민기;신성훈;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.265-270
    • /
    • 2002
  • 국내 건설사업은 잘못된 관행, 졸속한 사업추진, 사전조사의 미흡 등으로 인하여 불필요한 사업을 추진하거나 잦은 설계변경을 함으로써 예산 낭비를 초래해 왔다. 1999년 건교부에서 '원가절감을 위한 공공건설효율화종합대책'을 발표한 이후 많은 정책적인 노력이 있었음에도 결구하고 사업비에 크게 영향을 미치는 시공 전 단계의 사업비관리 부문은 여전히 취약하다는 지적이다. 발주자 측면에서 적정공사비를 반영한 사업비가 산정되지 않고 건설사업이 단계별로 추진되는 과정에서 이를 고수하기 위한 관리도 수행되지 못하고 있다. 따라서, 본 연구에서는 선진 사업비관리 체계에 대해 조사하여 시사점을 도출하고, 국내의 실제 프로젝트 및 관련 제도에 있어 시공 전 단계 사업비관리의 문제점 및 현황을 사업비관리(Cost Management)의 관점에서 분석하여, 국내 사업비관리의 개선방안에 대해 제안하고자 한다.

  • PDF

외식 프랜차이즈 가맹점창업 시 예비 창업자의 브랜드 선택 속성에 관한 연구 (A Study on Brand Selection Property of Preliminary Business Founder In Food Service Franchise Foundation)

  • 성대권;우종필;이형근
    • 한국프랜차이즈경영연구
    • /
    • 제3권1호
    • /
    • pp.92-110
    • /
    • 2012
  • 최근 경제적 불안과 실업율의 증가 등의 사회적인 문제로 인하여 창업시장의 수요가 증가 하는 가운데 청년창업 지원방안, 중기청 창업지원 계획 등의 정부의 창업 지원정책을 바탕으로 창업 시장은 지속적인 성장 추세를 보이고 있다. 이 같은 창업 시장의 확대에 힘입은 프랜차이즈 시장의 동반 상승이 예상되는 바, 프랜차이즈 시장에 대한 보다 현실적이고 구체적인 연구는 그 중요성이 점차 커질 것으로 사료된다. 본 연구에서는 가맹희망자의 브랜드 선택에 있어 기존에 선행연구를 개선하여 브랜드 선택에 영향을 미지는 선행 변수로 브랜드이미지, 본사의 지원, 창업비용, 정보탐색활동으로 보고 브랜드 선택에 영향을 미치는 요인을 규명하였으며, 그 결과는 다음과 같다. 첫째, 첫째, 창업업종 연령, 성별, 결혼여부에 따라 브랜드 이미지에 대한 생각 및 창업가능성에는 차이가 있다. 둘째, 예비창업자의 가맹계약의향에 있어 가장 중요한 요소는 경제적 특성이다. 브랜드 이미지 및 가맹지원, 정보탐색활동은 가맹희망자에게 있어 큰 영향을 미치는 속성으로 보기는 어려우며, 오히려 가맹점을 운영하는데 드는 비용(초기 창업비용 및 자기자본과의 일치성, 홍보비용, 운영자금, 시설/장비 재투자 등)이 중요한 속성인 것으로 나타났다. 특히 초기 창업비용과 자기자본과의 일치성은 가맹희망자에게 있어 가장 중요한 요인인 것으로 나타났다.