Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok  

Kang, Seunghee (College of Architectural, Myongji University)
Jung, Youngsoo (College of Architectural, Myongji University)
Publication Information
Korean Journal of Construction Engineering and Management / v.21, no.3, 2020 , pp. 48-56 More about this Journal
Abstract
Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.
Keywords
Preliminary Construction Cost; Wood Work Quantity; Unit Cost Model; Modernized Hanok; Module; Planning Stage;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Cho, Y., and Kim, W. (2012). "A Study on Modular Coordination About The New Korea Traditional Housing: According to the Analysis Intercolumniation." Journal of the Architectural Institute of Korea Planning & Design, 28(10), pp. 183-190.   DOI
2 Czarnigowska, A., and Sobotka, A. (2014). "Estimating Construction Duration for Public Roads During the Preplanning Phase." Journal of Engineering, Project and Production Management, 4(1), pp. 26-35.   DOI
3 Dursun, O., and Stoy, C. (2012). "Determinants of Construction Duration for Building Projects in Germany." Engineering Construction and Architectural Management, 19(4), pp. 444-468.   DOI
4 Kim, J. (2012). "A Study on Planning and Composition of Module Unit in Korean Traditional House." Journal of the Korean Housing Association, 23(4), pp. 41-48.   DOI
5 Kim, M., Kim, Y., Lee, Y., and Jung, Y. (2013). "Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok)." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 107-114.   DOI
6 Skitomore, R., and Ng, S. (2003). "Forecast Models for Actual Construction Time and Cost." Building and Environment, 38, pp. 1075-1083.   DOI
7 Kim, M., Kim, H., Ryu, J., and Jung, Y. (2014). "New Building Materials and Methods for Modernized Korean Housing (Hanok)." Korean Journal of Construction Engineering and Management, KICEM, 15(2), pp. 23-32.   DOI
8 Ministry of Land, Infrastructure and Transport (MOLIT) (2018). A Study on the Architectural Structure Standard of Small Scale Hanok, Research Report (National Standard).
9 Seo, N., Kang, S., Lee, Y., Jin, Z., Jeong, Y., and Jung, Y. (2019). "Variations of Building Methods and Costs of Modernized Hanok Test-bed Projects." Korean Journal of Construction Engineering and Management, KICEM, 20(3), pp. 86-96.   DOI
10 Yeom, D., Seo, H., Kim, Y., Cho, C., and Kim, Y. (2018). "Development of an Approximate Construction Duration Prediction Model During the Project Planning Phase for General Office Building." Journal of Civil Engineering and Management, 24(3), pp. 238-253.   DOI