An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate - (이산형 이벤트 시뮬레이션 기반 최적의 건설장비 조합 도출 방법 제시 - 표준품셈 건설기계 시공능력 산식을 기반으로 -)

  • Ko, Yongho;Ngov, Kheang;Noh, Jaeyun;Kim, Yujin;Han, Seungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.21-29
    • /
    • 2022
  • Productivity estimation of construction operations is crucial to successful project delivery. Especially in the preconstruction phase, the adequacy and effectiveness of plans directly affect the actual performance of operations. Currently, productivity estimation is conducted by referring to existing references such as the Construction Standard Production Rate. However, it is difficult to promptly apply changing conditions of operations when using such references. Moreover, it is difficult to deduce the optimal combination of construction machinery for the given condition. This paper presents a simple simulation model that can be used to generate productivity data that considers site conditions and construction equipment combination. The suggested method is expected to be used as a decision making assisting tool for practitioners who rely on estimations using the Construction Standard Production Rate when establishing construction plans using heavy machinery such as backhoes, loaders and dumptrucks.

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.