• Title/Summary/Keyword: Pre-erection

Search Result 30, Processing Time 0.025 seconds

Three-Dimensional Grillage Analysis of Reaction Forces on Supports of Pre-Erection Block (격자구조모델을 이용한 선체 PE블록의 반목 반력 해석 시스템 개발)

  • Ryu, Cheolho;Kim, Sungchan;Kim, Dong Geun
    • Journal of Ocean Engineering and Technology
    • /
    • v.27 no.4
    • /
    • pp.1-8
    • /
    • 2013
  • Many PE (pre-erection) blocks are supported by wooden, concrete, or steel supports when they are stocked in the outdoor areas of a shipyard. Their positions and numbers are planned on the basis of the workers' experience. Recently, many shipyards have been making PE blocks with various shapes and weight distributions because of the variety of ships and building technologies. Therefore, it is now necessary to deal with blocks that they have no experience with. We propose a method to conveniently and quickly evaluate the structural safety of PE block supports, without the need for special knowledge and technology related to structural analysis. This method can reduce the large number of man hours (MH) normally needed for the analysis. The three-dimensional grillage analysis is performed for a simplified grillage model of a PE block. For efficiency, the grillage model of the PE block is automatically built from its three-dimensional CAD model, and its weight is also automatically distributed on the grillage model. The integrated system has been comprehensively implemented to perform the grillage analysis for the reaction forces on block supports. This paper describes how to make a grillage model of a PE block and estimate the weight distribution of the block on this grillage model. These steps are verified by comparing the supports reaction forces to those of the 3D finite element analysis for the PE blocks that are provided by a shipyard.

A Study on the Stability of the Single-Layer Latticed Dome during Erection Using the Step-Up Method (Step-Up 공법에 의한 단층래티스돔의 시공시 안정성 연구)

  • Koo, Choong-Mo;Jung, Hwan-Mok;Kim, Cheol-Hwan
    • Journal of Korean Association for Spatial Structures
    • /
    • v.12 no.4
    • /
    • pp.109-118
    • /
    • 2012
  • The large-space single-layer lattice dome is relatively simpler in terms of the arrangement of the various framework members and of the design of the junction than the multi-layered lattice dome, can reduce the numbers and quantity of the framework members, and has the merit of exposing the beauty of the framework as it stands. The single-layer lattice dome, however, requires a stability investigation of the whole structure itself, along with an analysis of the stress of the framework members, because an unstable phenomenon called "buckling" occurs when its weight reaches critical levels. Many researchers have systematically conducted researches on the stability evaluation of the single-layer lattice dome. No construction case of a single-layer lattice dome with a 300-m-long span, however, has yet been reported anywhere in the world. The large-space dome structure is difficult to erect due to the gigantic span and higher ceiling compared with other common buildings, and its construction cost is generally huge. The method of erecting a structure causes major differences in the construction cost and period. Therefore, many researchers have been conducting various researches on the method of erecting such structure. The step-up method developed by these authors can reduce the construction cost and period to a great extent compared with the other general methods, but the application of this method inevitably requires the development of system supports in the center section as well as pre-existing supports in the boundary sections. In this research, the safety during the construction of a single-layer lattice dome with 300-m-long span using pre-existing materials was examined in the aspect of structural strength, and the basic data required for manufacturing the supports in the application of the step-up method developed by these authors during the erection of the roof structure were obtained.

Rubber Packing Damage Test Report for Procedure of Forebody Erection in the Sea (해상탑재 DAM공법에 따른 선체외판 선저부위의 도막박리 및 밀림방지 대책)

  • Kim Young-Nam;Im Myung-Soo;Yea Weon-Bae
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2005.06a
    • /
    • pp.144-150
    • /
    • 2005
  • The size of ship is being larger than the past in the shipping industry thanks to the increased quantity of goods transported by ship. Therefore, HHIC (Hanjin Heavy industries & Construction co., LTD) invented innovative construction method, so called 'DAM', to build a ship which is longer than the length of the HHIC's dry dock. On Erection at the sea by the application of DAM Method, Squeezing & Detachment of A/F film may occur as a result of the wave and the constriction between A/F film pre-applied on the side shell and DAM's Rubber Packing. Thus, the test for finding the minimum curing time of A/F film was performed to protect Squeezing & Detachment of A/F film on the hull. To verify the soundness of paint and to find the optimum condition during the erection period of the DAM, laboratory test was carried out under no immersion condition through the application of various coatings on the Rubber Packing. And two methods were selected from the results of laboratory test for actual MOCK-UP Test. In addition, the test for the film profile per temperature of silicone A/F coat and the film Squeezing was performed.

  • PDF

Shipyard Spatial Scheduling Solution using Genetic Algorithms

  • Yoon Duck Young;Ranjan Varghese
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.35-39
    • /
    • 2004
  • In a shipyard, there exist various critical decision making components pertaining to various production hindrances. The most prominent one is best-fit spatial arrangement for the minimal spatial occupancy with better pick-ability for the erection of the ship in the dock. During the present research, a concept have been conceived to evade the gap between the identification oj inter-relationships among a set of blocks to be included on a pre-erection area, and a detailed graphical layout of their positions, is called an Optimal Block Relationship Diagram A research has been performed on generation of optimal (or near Optimal) that is, with minimal scrap area. An effort has been made in the generation of optimal (or near-optimal) Optimal Block Relationship Diagram with the Goldberg's Genetic Algorithms with a representation and a set of operators are 'trained' specifically for this application. The expected result to date predicts very good solutions to test problems involving innumerable different blocks to place. The suggested algorithm could accept input from an erection sequence generator program which assists the user in defining the nature and strength of the relationships among blocks, and could produce input suitable for use in a detailed layout stage.

  • PDF

A Study on the Development of High Deposition Automatic Vertical Welding of Erection Stage in Shipbuilding (조선 탑재용접용 대입열 수직자동용접법의 개발에 관한 연구)

  • Park, Ju-Yong;Choe, Woo-Hyeon
    • Journal of Welding and Joining
    • /
    • v.26 no.5
    • /
    • pp.66-73
    • /
    • 2008
  • Welding work in pre-erection or erection stage of shipbuilding construction to be carried out in flat and vertical upward position mostly and Electrogas welding(EGW) is actively applied especially for vertical butt joint of thicker steel plate recently. In this study considered how to develope and improve mechanical properties of weld metal and HAZ in high heat input welding processes such as EGW and Electroslag welding(ESW) with its welding equipment in order to extend the application range to the longitudinal members and hatch coaming parts of container ship. Some components of welding system and parameters were modified to get the faster travel speed and reduce weld heat input, and also by adding additional filler rods or tubes increase the amount of deposited weld metal. With the test get some good date can apply to actual fabrication work and recommend items to manufacture welding materials make better. Above all things it's a fruition that to prepare the possibility of application of ESW to shipbuilding construction which fill up the gap of stoppage days of more than 20 years.

A System for Thermal Distortion Analysis of Hull Structures by Solar Radiation (선체의 태양복사 열변형 해석을 위한 전처리시스템)

  • Ha, Yunsok;Lee, Donghoon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.4
    • /
    • pp.275-281
    • /
    • 2016
  • One of the most important things for quality to meet ship-production schedule is an accuracy control. A ship is assembled by welding through whole production process, so it is important that loss by correction will not happen as much as possible by using some engineering skills like reverse design, reverse setting and margin for thermal shrinkage. These efforts are a quite effective in fabrication stages, but not in erection stages. If a ship block which consists of common steel is exposed to directional solar radiation, its dimensional accuracy will change high as time by its thermal expansion coefficient. Therefore, the measuring work would be often done at dawn or evening even with having a very accurate device. In this study, an FE analysis method is developed to solve this problem. It can change measured data affected by solar thermal distortion to ones not, even though ship-block is measured at an arbitrary time. It will use the time when measuring, the direction of block and the weather record by satellites. It is confirmed by a comparison between measured data of a ship-block and the result by suggested analysis method. Furthermore, a pre-processing system is also developed for fast application of the suggested analysis method.

Influence Factors for the Safety Assessment on the GPE Blocks during On-shore Transportation (GPE 블록의 연안운송시 안전성 평가를 위한 영향인자)

  • Kim, Sung-Chang;Hong, Ki-Sup;Shin, Dae-Kyun;Yu, Byeong-Seok;Kim, Kwan-Hong;Suh, Yong-Seok;Paeck, Se-Jin
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.6
    • /
    • pp.595-602
    • /
    • 2009
  • Great number of ships has been built by Korean Shipyards since early of 2,000 due to the expanding worldwide trade. Most of shipyards have enlarged the weight of erection block and many blocks have been assembled in block fabrication factories outside the shipyards to reduce the shipbuilding period. Especially, Giga blocks that exceed 2,000 tons are often assembled by the block fabrication factories outside the shipyard. Generally, the blocks are transported to building dock in shipyard by towing barges. Accident can be occurred during the sea transportation and it may bring about not only the delay of delivery but also a disaster on the ocean environments. Transportation condition of GPE (Grand Pre-Erection) block differs from the ocean going conditions of marine vessels. Special consideration should be included before transportation work in order to guarantee the safety of GPE blocks and barge carriers. In this paper, several examples, which have been investigated to set up the safety standard of transportation of the GPE blocks on coastal routes, are introduced. For the barge transportation on coastal sea route, the design criteria are discussed, considering the design wave, the acceleration induced by wave, structural strength, and the fixture condition of blocks.

Eurocode 4: A modern code for the design of composite structures

  • Stark, Jan
    • Steel and Composite Structures
    • /
    • v.5 no.4
    • /
    • pp.327-343
    • /
    • 2005
  • The European Standards Organisation (CEN) has planned to develop a complete set of harmonized European building standards. The Eurocodes, being the design standards, form part of this total system of European standards, together with standards for fabrication and erection and product standards. After a period of experimental use of the ENV(European Pre Standard)-versions of the Eurocodes, these are now converted into official EN's (European Standards). Design of composite steel and concrete buildings and bridges is covered by Eurocode 4. An overview will be given of the historic development of Eurocode 4, the structure and contents of the EN version and the present status and planning for completion. The Eurocode treatment of some selected technical items will be presented in more detail.

Application of PC Beam-Column Interior Joint with Splice Type Re-bar (PC 다층 연성 골조시스템의 현장적용 사례 연구)

  • Kim Joon-Ho;Jeon Byong-Kap;Park Soon-Kyu;Kim Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.9-13
    • /
    • 2006
  • The purpose of this study was to introduce the applied care of PC beam-column interior joint with splice type rebar. In this case, although the erection time of the introduced case was a little bit higher than that of general precast concrete method, this method was more effective than general precast concrete method in aspect of direct cost and the number of column joint. Therefore, this method could be adopted in the construction of the commercial and residential building in the future.

  • PDF

On-Site Construction Method for U-Girder with Pre-tension and Verification of Analytical Performance of Anchoring Block (프리텐션 U형 거더 현장 제작 방법 및 정착 블록 해석적 성능 검증)

  • Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.67-77
    • /
    • 2022
  • In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.