• 제목/요약/키워드: Pre-cast concrete

검색결과 43건 처리시간 0.032초

프리캐스트 콘크리트 부재설계에서 지식기반시스템의 적용 (Application of Knowledge-Based System in the Design of Pre-cast Concrete Member)

  • 김성중;이승창;이병해
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1995년도 봄 학술발표회 논문집
    • /
    • pp.176-183
    • /
    • 1995
  • The design process of pre-cast concrete member needs various design parameters and the engineer's experiences. The introduction of knowledge-based system in the design of pre-cast concrete member enables us to design complicated members using the designer's heuristics. The objectives of this research are to study useful methodology for representing knowledge and data in the development of knowledge-based system and to show the application of methodology by developing a prototype sysytem for design of pre-cast concrete member. This paper nrst describes methodology for building knowledge-based system. It then presents knowledge-based system for pre-cast concerete member design.

  • PDF

초유동 콘크리트의 2차제품 적용에 관한 연구 (Application of the Pre-cast Concrete of the Super Flowing Concrete)

  • 권영호;이상수;원철;박칠림
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1997년도 봄 학술발표회 논문집
    • /
    • pp.285-291
    • /
    • 1997
  • This study is the experimental results on the applicability of the super flowing concrete, which is the pre-cast concrete, to various cases. The primary purpose of this study is to verify the demolding strength, the handling strength of the super flowing concrete at various curing conditions, and the site quality control of the DWS (Daewoo Multi-Room Modular Construction System). From the experimental works, required strength and curing cycles are satisfied. Furthermore site quality control details and quality of the pre-cast concrete using the super flowing concrete are obtained. From now on, this study may suggest how to apply the super flowing concrete for common circumstance.

  • PDF

Wide Joint를 가진 PC벽체 수직접합부의 거동에 관한연구 (Structural Behavior and system Development of Wide Vertical Joints for the Pre-cast Concrete Walls)

  • 최수연;신영수;홍건호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 가을 학술발표회 논문집(II)
    • /
    • pp.897-902
    • /
    • 2000
  • In most of large panel pre-cast concrete system, the narrow joints have inefficiency to assemble several panels and structural problems due to their complicated process after construction. To improve, practically, structural performance and inefficiency to assemble, the behavior and strength of new wide joints method should be investigated experimentally. The result is that the shear force of wide joints is similar to that of loop joints, or more than. It seems that the use of wide joints is the possible methods in a construction field.

Cracking of a prefabricated steel truss-concrete composite beam with pre-embedded shear studs under hogging moment

  • Gao, Yanmei;Zhou, Zhixiang;Liu, Dong;Wang, Yinhui
    • Steel and Composite Structures
    • /
    • 제21권5호
    • /
    • pp.981-997
    • /
    • 2016
  • To avoid the cracks of cast-in-place concrete in shear pockets and seams in the traditional composite beam with precast decks, this paper proposed a new type of prefabricated steel truss-concrete composite beam (ab. PSTC beam) with pre-embedded shear studs (ab. PSS connector). To study the initial cracking load of concrete deck, the development and distribution laws of the cracks, 3 PSTC beams were tested under hogging moment. And the crack behavior of the deck was compared with traditional precast composite beam, which was assembled by shear pockets and cast-in-place joints. Results show that: (i) the initial crack appears on the deck, thus avoid the appearance of the cracks in the traditional shear pockets; (ii) the crack of the seam appears later than that of the deck, which verifies the reliability of epoxy cement mortar seam, thus solves the complex structure and easily crack behavior of the traditional cast-in-place joints; (iii) the development and the distribution laws of the cracks in PSTC beam are different from the conventional composite beam. Therefore, in the deduction of crack calculation theory, all the above factors should be considered.

하천환경에서의 그라스콘크리트의 적용성 연구 (Hydraulic Application of Grass Concrete In River Environment)

  • 장석환;남용혁;김서영;박성범;박웅서;박상우
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.472-477
    • /
    • 2006
  • This study aims at investigating the failure cases of the pre-cast block system in river environments which widely used nowadays and reviewing the effect and flow resistance for grass concrete structure through the physical experiments by hydraulic model test and developing application method in river slope or levee which has rigid flood resistance. Grass concrete structure has been independently tested under high velocity flow under the super critical condition, it survived the 8 m/sec maximum flow velocity. This results shows grass concrete system is also suited to use in aggressive river environments such as repairing a flood damaged embankment that had placed at risk the adjacent drainage channel with vegetation.

  • PDF

Modelling and integrity assessment of shear connectors in precast cast-in-situ concrete bridges

  • Moyo, Pilate;Sibanda, Bongani;Beushausen, Hans
    • Structural Engineering and Mechanics
    • /
    • 제42권1호
    • /
    • pp.55-72
    • /
    • 2012
  • Precast-cast insitu concrete bridge construction is widely practiced for small to medium span structures. These bridges consist of precast pre-stressed concrete beams of various cross-sections with a cast in-situ reinforced concrete slab. The connection between the beams and the slab is via shear links often included during the manufacturing process of the beams. This form of construction is attractive as it provides for standardisation, reduced formwork and construction time. The assessment of the integrity of shear connectors in existing bridges is a major challenge. A procedure for assessment of shear connectors based on vibration testing and finite element model updating is proposed. The technique is applied successfully to a scaled model bridge model and an existing bridge structure.

Study on seismic performance of connection joint between prefabricated prestressed concrete beams and high strength reinforcement-confined concrete columns

  • Jiang, Haotian;Li, Qingning;Jiang, Weishan;Zhang, De-Yi
    • Steel and Composite Structures
    • /
    • 제21권2호
    • /
    • pp.343-356
    • /
    • 2016
  • As the common cast-in-place construction works fails to meet the enormous construction demand under rapid economic growth, the development of prefabricated structure instead becomes increasingly promising in China. For the prefabricated structure, its load carrying connection joint play a key role in maintaining the structural integrity. Therefore, a novel end plate bolt connecting joint between fully prefabricated pre-stressed concrete beam and high-strength reinforcement-confined concrete column was proposed. Under action of low cycle repeated horizontal loadings, comparative tests are conducted on 6 prefabricated pre-stressed intermediate joint specimens and 1 cast-in-place joint specimen to obtain the specimen failure modes, hysteresis curves, skeleton curves, ductility factor, stiffness degradation and energy dissipation capacity and other seismic indicators, and the seismic characteristics of the new-type prefabricated beam-column connecting joint are determined. The test results show that all the specimens for end plate bolt connecting joint between fully prefabricated pre-stressed concrete beam and high-strength reinforcement-confined concrete column have realized the design objectives of strong column weak beam. The hysteretic curves for specimens are good, indicating desirable ductility and energy dissipation capacity and seismic performances, and the research results provide theoretical basis and technical support for the promotion and application of prefabricated assembly frames in the earthquake zone.

Study on prestressed concrete beams and poles with cement replaced by steel dust

  • Sujitha Magdalene, P;Harishankar, S
    • Advances in concrete construction
    • /
    • 제5권4호
    • /
    • pp.391-405
    • /
    • 2017
  • Cement acts as the most important component of concrete as it binds and holds the concrete together. But it is one of the major $CO_2$ emitters all over the world, during manufacturing (900 kg of $CO_2$ per 1000 kg). Some of the modern construction methods aim at reducing the amount of usage of cement and came out with numerous solutions for replacement of the same. One such supplement in current trend is the Steel dust or the Electric Arc Furnace Dust (EAFD), which is a waste product from the electric arc furnace when the scrap metal is melted. When the concrete containing steel dust is exposed to atmosphere, the environmental oxygen and moisture play role to form rust and ultimately the member becomes harder. As Cement is the binder of conventional concrete, only certain percentage of the same could be replaced by the new material, steel dust. Tests were conducted for the 28 days cube strength of M45 grade (suitable for prestressing) concrete which has 0%, 10%, 20%, 30%, 40% and 50% steel dust instead cement. From the test, the optimum percentage replacement of steel dust was obtained, for which the beams and overhead poles were cast, prestressed and tested for the failure load and deflections. A conventional concrete beam and overhead pole were also cast, prestressed and tested to compare the results with those of the beam and pole that contained steel dust. The load vs. deflection plot and other results from the test is also discussed.

쉴드터널의 사다리꼴 세그먼트라이닝 배열방법 개선에 대한 연구 (Study on improving method of arranging trapezoidal pre-cast segment lining in shield tunnel)

  • 김정현;강경진
    • 한국터널지하공간학회 논문집
    • /
    • 제9권1호
    • /
    • pp.1-18
    • /
    • 2007
  • 본 연구는 쉴드터널 공사시 사용되는 사다리꼴 세그먼트라이닝의 배열방법에 관한 것이다. 사다리꼴 세그먼트라이닝은 공장에서 기제작된 Taper를 가진 콘크리트 세그먼트를 터널내에 반입과 동시에 조립하므로써 형성되는데, 이렇게 형성된 사다리꼴 세그먼트라이닝은 회전조립시 Taper량의 계산에 의하여 단 한가지 타입으로 다양한 터널노선에 맞는 배열을 가능하게 하므로 세그먼트에 의한 터널시공시 가장 효율적인 공법이라 할 수 있다. 본 연구는 사다리꼴 세그먼트라이닝의 설계제원 및 터널 노선의 선형(직선 혹은 곡선)의 조건을 분석하여 터널선형에 맞는 배열방법을 고안하고 실제 터널내에서 작업자가 활용할 수 있는 컴퓨터 프로그램을 제작하여 자동으로 배열순서를 결정하는 원리에 대하여 설명하고자 한다.또한,가변하는 실제 터널내에서 작업자가 세그먼트라이닝의 배치상태를 측정한 값이 컴퓨터 프로그램에서 계산된 결과와 상이할 때 작업자는 측정한 데이터를 컴퓨터 프로그램에 입력하여 프로그램의 계산상태를 실제 세그먼트 조립상태로 일치시킨 후, 다음 세그먼트라이닝의 배열자료로 사용하여 연속된 작업이 되도록 하는 방법을 제공하는 것이 본 연구의 기술적 요지이다.

  • PDF

조립식 터널 라이닝(PCL)의 내진성능 평가 및 해석기법에 대한 고찰 (A Study on the Seismic Performance Evaluation and the Seismic Analysis Method for Pre-Cast Concrete Lining)

  • 정형식;배규진;이용준
    • 한국지반공학회논문집
    • /
    • 제17권5호
    • /
    • pp.197-207
    • /
    • 2001
  • 1980년대 이래 국내 터널의 시공법은 원지반의 강성을 활용한 NATM이 주를 이루고 있다. 그러나 NATM은 터널내부에 설치되는 내부라이닝의 여러 가지 문제점을 내포하고 있기 때문에 노르웨이에서는 조립식 터널 라이닝(Pre-Cast Concrete Lining, PCL)을 개발하여 현장타설 콘크리트 라이닝의 문제점을 해결하고자 하였다. 그러나 노르웨이와 같은 북유럽지역에서는 지진이 거의 발생되지 않고 있기 때문에 PCL공법 개발당시에 지진에 대한 영향을 고려하지 못하였다. 따라서 PCL공법을 국내에 도입하기 위해서는 먼저 지진에 대한 영향을 분석하여야 할 것으로 판단되므로 본 연구에서는 PCL공법 적용시 지진에 대한 안정성 평가 및 합리적 내진해석을 위한 연구를 수행하고자 하였다. PCL의 내진성능을 판단하기 위하여 먼저 국내에서 주로 많이 사용되고 있는 해석기법인 유사정적해석법과 응답스펙트럼해석법을 이용하여 분석하였으며 지반과 구조물의 상호작용에 대한 영향을 분석하기 위해 시간이력해석을 수행하여 터널심도별 PCL의 내진성능을 분석하였다. 이와 같은 방법으로 PCL의 내진해석을 수행한 결과, 부재에 발생된 응력이 허용응력 이내에서 발생되어 PCL의 내진성능을 확보된 것으로 판단된다. 또한 시간이력해석에 의한 지반-구조물 해석을 수행한 결과에 의하면 PCL의 내진성능을 확보하기 위한 터널의 최소 토피고가 터널직경에 2배 이상인 것으로 확인되었다. 또한 단순 구조물의 내진해석만으로는 PCL의 내진성능을 과소평가할 우려가 있는 것으로 나타났다.

  • PDF