• 제목/요약/키워드: Power system construction

검색결과 1,650건 처리시간 0.043초

원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구 (A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF

Power Allocation Method of Downlink Non-orthogonal Multiple Access System Based on α Fair Utility Function

  • Li, Jianpo;Wang, Qiwei
    • Journal of Information Processing Systems
    • /
    • 제17권2호
    • /
    • pp.306-317
    • /
    • 2021
  • The unbalance between system ergodic sum rate and high fairness is one of the key issues affecting the performance of non-orthogonal multiple access (NOMA) system. To solve the problem, this paper proposes a power allocation algorithm to realize the ergodic sum rate maximization of NOMA system. The scheme is mainly achieved by the construction algorithm of fair model based on α fair utility function and the optimal solution algorithm based on the interior point method of penalty function. Aiming at the construction of fair model, the fair target is added to the traditional power allocation model to set the reasonable target function. Simultaneously, the problem of ergodic sum rate and fairness in power allocation is weighed by adjusting the value of α. Aiming at the optimal solution algorithm, the interior point method of penalty function is used to transform the fair objective function with unequal constraints into the unconstrained problem in the feasible domain. Then the optimal solution of the original constrained optimization problem is gradually approximated within the feasible domain. The simulation results show that, compared with NOMA and time division multiple address (TDMA) schemes, the proposed method has larger ergodic sum rate and lower Fairness Index (FI) values.

해외건설 수주경쟁력 향상을 위한 ODA (Official Development Assistance) 활용방안 (Strategy for Expansion of Overseas Construction Competitive Power by Official Development Assistance(ODA))

  • 최진욱;김재준;이한승;전낙근
    • 한국건설관리학회논문집
    • /
    • 제8권5호
    • /
    • pp.173-181
    • /
    • 2007
  • 정부의 지속적인 규제 정책으로 인해 국내 건설시장은 위축되어 있는 반면 해외 건설시장은 꾸준한 성장세를 보이고 있고, WTO(World Trade Organization)체제 출범 이후 국제적인 개방화가 가속되고 있다. 따라서 우리나라의 해외건설도 과거의 단순 입찰방식을 지양하고 해외건설 수주경쟁력 확대를 위한 전략 수립이 필요한 실정이다. 본 연구는 해외건설 분야에서 사업초기에서부터 발주처에게 프로젝트의 재원확보 방안을 제시함으로써 수주경쟁력을 증대시키는 것을 연구의 주제로 삼았으며 재원확보 방안으로 양허성(원조성격)을 지닌 공적개발원조(ODA)를 대상으로 하였다. 본 연구에서는 선진국 및 우리나라의 공적개발원조를 분석하고, 관련 분야 전문가를 대상으로 해외건설 및 공적개발원조에 대한 설문조사를 실시하여 현황 및 문제점을 알아보았으며, 이를 바탕으로 우리나라 공적개발원조의 경쟁력을 분석하고 해외건설 수주경쟁력 확대를 위한 전략을 제안하였다.

전력수급계획시스템 데이터베이스 설계 및 구축에 관한 연구 (A Study on The Database Design and Construction of Power System Operational Planning System)

  • 안양근;박시우;남재현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1012-1014
    • /
    • 1998
  • This paper presents a database design for power system operational planning system of the integrated system for power system operational planning and analysis that will be more economical and stable of power system operation. An alias of the integrated system is Highly Integrated Total Energy System(HITES). We first describe the requirements for the Power System Planning System of HTES. Database design is processed in two phases(conceptual design and physical design), and CDM(Conceptual Data Model) and PDM(Physical Data Model) are generated by Powerdesigner(CASE tool for database design). In the future, the constructed database needs to be tested and tuning.

  • PDF

제주풍력 전망 및 계통영향 분석 (Prospect and Influence Analysis of Jeju Wind Power System)

  • 김영환;강지윤;변군익;우현철;김건훈;김세호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.275-276
    • /
    • 2008
  • Construction of wind power plant is rapidly increasing since Jeju is known as the most suitable regarding wind power plants in Korea. But implementing wind power generation inevitably introduces new challenges due to its intermittent nature. In the paper, it is introduced the prospect of wind plant construction and influence analysis in Jeju power system.

  • PDF

Python 기반 WSCR 강건 지수를 이용한 미래계통 구축에 관한 연구 (A Study on Future System Construction Using WSCR Strengthness Index based on Python)

  • 박성준;허진;김현진;조윤성
    • 전기학회논문지
    • /
    • 제67권8호
    • /
    • pp.994-1001
    • /
    • 2018
  • In this paper, to studied about future power system construction using PSS / E-Python API. Python-based future system automatical construction methods and modeling of renewable sources. it confirmed the stability of the powert system for each renewable area by calculating the weighted short circuit ratio (WSCR) index. it calculated the short circuit ratio (SCR) and selected the transmission line linkage scenario to improve the stability of vulnerable areas. it confirmed the WSCR index improvement through the selected transmission line linkage of scenario, and analyzed the stability of the renewable power system applying the scenario. It describes Facts and Shunt devices adjustment for the load flow convergence. It describes the stable methed of the bus voltage through the transformer Ratio Tap adjustment. By performing PSS/E ASCC using the Python it was performed three-phase short circuit fault capacity analysis, it is confirmed whether excess of the fault current circuit breaker capacity. In order to contingency accident analysis, it have described the generation of one or two line list of each areas using the Python. The list is used to contingency analysis and describe the soluted of the transmission line overload through comparison before and after adding the scenario line.

원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구 (Process Model for development of EVMS in Nuclear Power Plant Project)

  • 김윤명;원서경;신일섭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

에너지 소비 원단위를 기초로 한 벽면부착형 BIPV 시스템의 성능평가에 관한 연구 - 대학교 강의동 건축물을 대상으로 - (Performance Evaluation of the Wall-Type BIPV System Based on the Energy Consumption Unit - A Study for University Lecture Building -)

  • 이강국;서원덕;홍원화
    • 교육시설 논문지
    • /
    • 제18권6호
    • /
    • pp.25-32
    • /
    • 2011
  • The building integrated photovoltaic(BIPV) system has a double advantage that it reduces costs for exterior materials and PV panels. It allows the construction of a low-energy building without the need for the additional installation space. At the construction planning stage, however, it requires sufficient evaluation on the efficiency and performance. This study was performed to promote the distribution of photovoltaic power generation system by estimating the potential photovoltaic power generation capacity of the BIPV system installed on the university lecture building and by evaluating the characteristics and performances of window, spandrel and combined attachment types via the simulation of generation capacity per unit area.

  • PDF

두 개의 지로터로 구성된 전유압 파워스티어링 장치의 1차원 해석 (One Dimensional Analysis of Hydrostatic Power Steering Unit Composed of Two Gerotors)

  • 김갑태;유범상;김경식;정황훈
    • 드라이브 ㆍ 컨트롤
    • /
    • 제17권4호
    • /
    • pp.113-124
    • /
    • 2020
  • Most of the work of construction equipment and agricultural machinery is done in off-road conditions. Autonomous driving required in these conditions uses GPS sensors, and PID controllers to control their speed and position. The hydrostatic steering, which is composed of a PSU, hydraulic hoses, and cylinders, rather than a mechanical coupling is used in these equipments. The PSU plays a key role in hydrostatic steering. Precise control of the position under various conditions requires detailed behavioral analysis of the basic components and operation. Two Gerotor PSU is now a commonly used safer option. The components of the PSU can be divided into mechanical and hydraulic actuating elements by its behavior. Since the system is combined by mechanical and hydraulic elements, the modelings are performed using Amesim, which is one of the most effective for the multi-domain dynamic system analysis. To confirm the validity of the model, input torque and pressures are checked with varying steering speed. The opening and the steering speed of normal and newly designed control valve set is investigated with the effect of centering spring force and friction. Finally, simulation results with fully detailed model with two gerotors are analyzed and compared with simple model.