• 제목/요약/키워드: Power supply plan

검색결과 215건 처리시간 0.036초

확률계획법을 활용한 원자력 대체비용의 분석 (Analysis on the Replacement Cost of Nuclear Energy Using a Stochastic Programming Model)

  • 정재우;민대기
    • 경영과학
    • /
    • 제30권1호
    • /
    • pp.139-148
    • /
    • 2013
  • A nuclear energy has been one of the most important sources to securely supply electricity in South Korea. Its weight in the national electricity supply has kept increasing since the first nuclear reactor was built in 1978. The country relies on the nuclear approximately 31.4% in 2012 and it is expected to increase to 48.5% in 2024 based on the long-term electricity supply plan announced by the Korean government. However, Fukushima disaster due to 9.0 magnitude earthquake followed by the tsunami has raised deep concerns on the security of the nuclear power plants. The policy makers of the country are much interested in analyzing the cost structure of the power supply in the case that the nuclear is diminished from the current supply portion. This research uses a stochastic model that aims to evaluate the long-term power supply plan and provides an extensive cost analysis on the changes of the nuclear power supply. To evaluate a power supply plan, the research develops a few plausible energy mix scenarios by changing the installed capacities of energy sources from the long-term electricity supply plan. The analyses show that the nuclear is still the most attractive energy source since its fuel cost is very much stable compared to the other sources. Also the results demonstrate that a large amount of financial expenditure is additionally required every year if Koreans agree on the reduction of nuclear to increase national security against a nuclear disaster.

원전 및 신재생에너지 정책에 따른 전력공급비용 분석 (Analysis of Power Supply Cost According to Nuclear and Renewable Energy Policies)

  • 우필성;김강원;황순현;김발호
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.16-21
    • /
    • 2018
  • As a result of the Fukushima disaster and climate change due to excessive greenhouse gases, international energy affairs are currently focused on establishing safe and environment-friendly policies. To achieve this, Republic of Korea has established a plan for environment-friendly energy supplies. It is expected that policy enforcement will be accompanied by an increase in energy supply costs. An analysis of energy supply costs is necessary before the establishment of any national energy policy. This paper analyzes and compares the energy supply costs accompanying environmental and nuclear energy policies, based on the Korean National Energy Master Plan and the Basic Plan for Long-Term Electricity Supply and Demand, in order to understand the implications of these national energy policies.

전력수급기본계획 수립에서 의향서 평가절차의 개천 방안 (A Study on the Improvement of Planning procedure and estimation of Capacity Addition in Long Term Electricity Plan)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.745-747
    • /
    • 2005
  • After restructuring electricity industry, national long term electricity plans moved to "Basic plan of electricity supply and demand" from "Long term power development plan". The main point is a change of path from plan of power development at national level to plan of electricity supply and demand at company level. A proposal by generation company is surveyed and reflected to the basic plan of electricity supply and demand. The second plan shows over 40% reserves in result of the proposals. It is the time to evaluating the proposal which covers market function in the basic plan of electricity supply and demand at the stage of market change. This research presents the need of evaluation of proposals and the methods of evaluation. Also it presents the alternative planning procedure to reflecting the evaluation methods.

  • PDF

사례연구를 통한 공항의 비상전원에 관한 연구 (A Study on the Emergency Power of the Airport with the case study)

  • 최홍규;최영준
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 학술대회 논문집
    • /
    • pp.129-133
    • /
    • 2005
  • While everyone who uses electric power desires perfect frequency, voltage, stability, and reliability at all times, this cannot be realized in practice. The supplying utility cannot be expected to provide a perfect power supply because many of the causes of power supply disturbances are beyond the control of the utility. The outage happens but due to many reason. The electricity equipment requires consequently the emergency power supply. We classify the subordinate for quick supply of the emergency power supply and must grope the supply plan. We will find out in this paper through the case study about the emergency power efficient operation plan.

  • PDF

전력수급기본계획의 적정 설비예비율 산정 개선방안 (A Study on the Assessment of Reasonable Reserve Margin in Basic Plan of Electricity Supply and Demand)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.418-419
    • /
    • 2006
  • After electricity power industry restructuring, "Long term power development plan", setting up by government, is replaced by "Basic plan of electricity supply and demand". In this basic plan, one of the most important factors is assessment of appropriate capacity margin. The benefit of GENCO is decided by the market price, and the price is largely affected by the level of reserve margin. As a consequence, appropriate reserve margin is determined by market power. However, Cost Based Pool(CBP) is a limited competitive market, and government policy for supply and demand is very important factor or reserve margin determination. This paper points out issues about existing reserve margin assessment method which is used in basic plan and suggests improved assessment method. In the case study, capacity margin is calculated by proposed assessment method and result shows the advantages of suggested method.

  • PDF

배전설비의 환경조화방안 (A plan to harmonize the equipments of power distribution with its environment)

  • 이재관;김상률
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1206-1209
    • /
    • 1998
  • For 21th Century, the assignment of power distribution will be the expansion of equipments to supply electric power and harmony with its environment, in process of approving value consciousness of land, space, and the preservation of surroundings. This paper proposes a plan to match with the requirement about equipments, having ability to supply electric power, being harmonized itself with its surroundings by applying a general concept of "Amenity" when we choose an established form of power distribution.

  • PDF

이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획 (KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site)

  • 송인호;오종석
    • 전력전자학회논문지
    • /
    • 제27권5호
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

전력수급기본계획에 열병합발전 설비 반영 방법론의 개발 (The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;김미예;우성민;조성린;임현성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

전력수급기본계획에 열병합발전 설비 반영시의 효과분석에 관한 연구 (The Analysis of Effect in Order to Consider Combined Heat and Power Capacity in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;문정호;연준희;정현성;우성민;김미예
    • 에너지공학
    • /
    • 제16권1호
    • /
    • pp.22-31
    • /
    • 2007
  • 본 논문에서는 전력수급기본계획에 열병합발전설비의 최적용량을 반영할 수 있는 방법론을 개발하였으며 이에 따른 효과를 분석하였다. 이를 위해 열병합발전의 계획발전원가를 새로이 산정하여 심사곡선법(Screening Curve Method : SCM)을 이용한 정태적 최적 전원을 구성하였다. 이때, 열병합발전은 전기와 열을 생산하는 것이 가장 중요한 특징이므로 이를 고려할 수 있도록 열병합발전의 전기용량과 열용량을 모두 고려할 수 있는 계획발전원가를 도출하였다. 또한, 심사곡선법을 적용시키기 위한 부하지속곡선의 경우도 열병합발전의 특징을 고려하여 전기 및 열 부하지속곡선을 구성하여 적용하였다. 이때, 현재 수립된 전력 수급기본계획을 최대한 수정하지 않는 범위 내에서 열병합발전설비를 반영하도록 하였다. 열병합발전 건설계획을 반영한 계획안의 타당성을 증명하기 위해서 열병합발전 건설계획을 반영한 계획안과 전력수급기본계획을 비교 하였다. 즉, 발전량 기대치를 산출하여 발전원별 연료소비량 및 환경에 미치는 영향을 도출함으로써 열병합발전의 반영에 대한 효율성을 입증하였다.

포트폴리오 이론을 활용한 제6차 전력수급기본계획의 신규전원구성 비교 연구 (Portfolio Analysis on the New Power Generation Sources of the Sixth Basic Plan for Long Term Electricity Demand and Supply)

  • 김주한;김진수
    • 자원ㆍ환경경제연구
    • /
    • 제23권4호
    • /
    • pp.583-615
    • /
    • 2014
  • 우리나라는 2011년 발생한 순환정전사태를 비롯하여 지난 5년간 급격한 전력소비 증가, 수요 예측 실패에 따른 전력 수급난을 겪고 있다. 또한 일본의 후쿠시마 원전사태와 국제 연료가격 상승, 기술 발전 및 적용 가능한 발전원 증가로 인해 발전 환경의 불확실성이 큰 폭으로 증가하였다. 이러한 대내외적 환경 변화로 인해 안정적 전력공급에 대한 정책적 검토가 필요하게 되었고 신규전원구성에 대한 다양한 논의가 이루어지게 되었다. 실제로 "민관 합동 워킹그룹" 에서는 에너지 기본계획 및 원전 비중 변화, 전원구성에 대한 시나리오 검토를 수행한 바 있다. 이러한 국내외 여건에 따라 본 연구에서는 제6차 전력수급기본계획과 정책 제안 그리고 우리나라의 전력 설비를 고려하여 포트폴리오 이론을 적용, 신규 전원구성 연구를 수행하였다. 본 연구의 전원 구성 결과에 따르면 향후 신재생 발전원의 비용하락과 화석 연료 발전원의 비용이 증가할 경우 신재생 발전원의 비중이 큰 폭으로 증가하며 발전믹스 내 발전원의 다양성이 증가 할 것이라는 결과가 도출되었다. 특히 위험수준(표준편차) 0.06~0.09 사이에서 가장 다양한 발전원을 보유한 효율적 전원구성이 나타남을 확인하였다. 이 밖에 기존 계획안은 효율적 곡선상에 위치하지 않기 때문에 비용-위험 기준에서 보다 개선될 수 있음을 확인하였으며 기존 방법론과 상호 보완적으로 본 연구의 방법론이 활용될 수 있음을 확인하였다. 마지막으로 본 연구 결과를 바탕으로 안정적이고 효율적인 전원믹스 운영을 위해서는 신재생 발전원의 확충과 더불어 전력저장시스템, 에너지관리시스템과 같은 전력 기술 개발 및 인프라 구축이 수반되어야 함을 확인하였다.