Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2007.05a
/
pp.667-672
/
2007
The source of wayside noise for the train are the aerodynamic noise, wheel/rail noise, and power unit noise. The major source of railway noise is the wheel/rail noise caused by the interaction between the wheels and rails. The Structure borne noise is mainly a low frequency problem. The train noise and vibration nearby the elevated railway make one specific issue. In this paper, the train noise and structure borne noise by train are measured. From the results, we investigated the effect on the sound absorption tunnel for elevated railway.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2001.05a
/
pp.688-694
/
2001
The 84m discharge line of moisture separator reheater(MSR) in Kori-2 had been suffered by excessive vibration from the beginning of power generation. In 1993, a complementary measure was taken to reduce the vibration level by adding several supports in the MSR pipeline. However, the piping vibration was beyond the allowable limit and an appropriate countermeasure was required to prevent the fatigue failure of the pipeline from the abnormal vibration. In this study, the vibrational characteristics of MSR pipeline and the countermeasure for abnormal vibration was investigated. Among the several vibration reduction methods, piping layout change by smoothing the pipeline was applied to the MSR pipeline in Kori-2. Applying the countermeasure, the vibration level was found to dramatically reduce from 17cm/sec to l.0cm/sec at the full-power operation condition.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.4
/
pp.467-473
/
1999
We have realized the two kinds of power line communication systems by the FSK MODEM. The first approach is the DS-SS (Direct suquence-spread spectrum) technique using 8 bits pseudo noise, the other is Convolutional coding method by the new algorithm. Their characteristics are comparied with each other by experimenting their Bit Error Rates (BER) in high level of Noise. The results have showed that two systems are useful to the application of HA (Home Automation) systems.
In this paper, an appropriate modulation method was implemented as their results presented in details and verified by the simulations. The data compensation method at momentary high noise occurrence by using retransmission request techniques that uses error checking was discussed. Finally, application of other modulation method by detection of error rate per bit according to variation of channel error caused by electric equipment that is connected to power line was studied.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2002.08a
/
pp.37-40
/
2002
Ground connection began by experimenting lightning with the use of a kite and it means electric appliances, communication equipments, measuring instruments and so on connecting the Earth in order to flow away overcharged electricity. There are two kinds of earth connection: Power Ground and Signal Ground. Power Ground is for preventing an electric shock and in general there's no current in the connector. However in an accident, there's a quick flow of electricity out to the Earth. Signal Ground is not only for the safety of appliances but also for the safety of equipment operation. This paper is about connection for noise and interference reduce in order to prevent wrong operation and distortion of signal in the electrical appliances which can take place in cable TV.
Journal of the Korean Society for Precision Engineering
/
v.20
no.1
/
pp.99-106
/
2003
Uninterrupted power supply has become indispensable during the maintenance task of active electric power lines as a result of today's highly information-oriented society and increasing demand of electric utilities. The maintenance task has the risk of electric shock and the danger of falling from high place. Therefore it is necessary to realize an autonomous robot system. In order to realize these tasks autonomously, the there dimensional position of target object such as electric line and the stand of insulator must be recognized accurately and rapidly. The insertion task of an electric line into a sleeve is selected as the typical task of the maintenance of active electric power distribution lines in this paper. A modified hough transform is applied to the recognition of the center of electric line and optimal target position calculation method is newly derived in order to recognize the center 3 dimensional position of the electric line. By the proposed method, it is proved that the center position of the electric line can be recognized without respect to the noise of image and the shape of electric lines and the insertion task of an electric tine is realized.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2007.11a
/
pp.287-290
/
2007
This study examines the characteristics of noise occerred at a hydroelectric power plant by using the on-line partial discharge measured by eletrical detecting method under the high voltage rotating machines. In addition, it analyzes the noise pattern into frequency and its scale component by using the FTT technique.
Estimation and removal of power line interference in the electrocardiogram using adaptive noise cancelling techniques is presented. The system identification concepts are used to design the noise cancelling filter and the prediction error method is used to adjust filter coefficients. Computer simulation were performed to compare this method with the Lekov's method.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.23
no.8
/
pp.645-650
/
2010
The continuous increase demand for electric power leads to the additional construction of transmission facilities, but it is not easy to acquire right-of-way for transmission facilities. Therefor, there is a need for compact tower that can be built on a narrow right-of-way the compact tower with polymer insulation arm is a solution. It can be upgrading conventional 154 kV transmission line voltages to 345 kV levels. However transmission voltage is increasing, environment interference (corona noise, radio interference, etc.) will occur gradually. This environment interference is depending on the electrical clearances of tower and configuration of conductors. Therefore the analysis of the factors of environmental interference is necessary in order to upgrading transmission voltage. This paper presents the design factor of a compact tower to meet the environmental interference standard.
The Transactions of the Korean Institute of Electrical Engineers C
/
v.55
no.5
/
pp.245-249
/
2006
Corona characteristics of conductors are dependent on the electric field conditions in the immediate vicinity of the conductors. In case of DC transmission line, particularly, the space charge plays an important role in the electric field distribution. Therefore, DC corona cage simulation is necessary for long-term test in the same conditions. This paper presents the results of designing and constructing hardwares such as DC power supply, measurement system and DAS to carry out the simulation. The corona cage longitudinally is divided into five equal length sections and three inner sections of those are isolated from the ground of outer cage. The measurement items are radio noise, corona current, television noise, audible noise and meteorological conditions. In the next step, various simulations about the type and configuration of two or three candidate conductors will be conducted. And then finally an environmentally-friendly conductor for HVDC overhead transmission line will be decided.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.