• 제목/요약/키워드: Power Plant Park

검색결과 1,381건 처리시간 0.033초

전원공급기 점검장치 개발 (Development of Power Supply Testing System)

  • 박종범;김영화;이해규;이낙희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 B
    • /
    • pp.703-705
    • /
    • 1999
  • The Power supplies used commonly in the Nuclear, Thermal and Hydraulic Power Plant are required to test the function and reliabilities. For the better contribution of reliable operation and speedy maintenance of Power Plant, it is necessary to gather and analyze the datum, to print out the result of testing using PC and proper controllers. Various kinds of power supply shall be tested and examined automatically. By storing the test results in the Database it is possible to find out the changing of characteristics of power supplies. So it is very useful to prevent any problems that may occur in the power supplies.

  • PDF

신재생 에너지와 기존 발전기술과의 투자리스크 요인별 민감도 비교 (The Sensitivity Comparison of Each Risk Factors Analysis on Renewable Energy and Other Generating Technologies)

  • 고경호;박세익
    • 신재생에너지
    • /
    • 제7권4호
    • /
    • pp.10-17
    • /
    • 2011
  • Recently, electricity industry is facing high market uncertainty which has ever had and which increase risks in power market. In this study, we analyze risk factors such as discount rates, initial investment (overnight cost), plant factor, fuel cost, carbon price, etc, for the perspective of investor. For the analysis of risk factors, we used LCOE method. The results of this study show that renewable energy is more affected by plant factor and overnight cost than other risk factors. First, Renewable energy has higher proportion of overnight cost in the total investment than that of other technologies. Second, renewable energy is free of fuel cost and carbon price so plant factor is the most important factor, in other words, competitiveness of renewable energy depends on plant factor. Furthermore, we conducted economic feasibility of wind power and PV in domestic case study. The minimum requirement condition to get profitability is that plant factor 15% and overnight cost \6,000,000/kW and 26%, \2,200,000/kW for PV and Wind Power, respectively.

휴대용 화상전송 원격정비 감시시스템의 개발 (A Development of Image Transfer Remote Maintenance Monitoring System for Hand Held Device)

  • 김동완;박성원
    • 전기학회논문지P
    • /
    • 제58권3호
    • /
    • pp.276-284
    • /
    • 2009
  • In this paper, we develop the image transfer remote maintenance monitoring system for hand held device which can compensate defects of human mistake. The human mistakes always happen when the worker communicate information each other to check and maintenance the equipment of the power plant under bad circumstance such as small place and long distance in power plant. A worker couldn't converse with other when in noisy place like Power plant. So, we make some hand device for handy size and able to converse in noisy place. The developed system can have improvement of productivity through increasing plant operation time. And developed system is composed of advanced H/W(hard ware) system and S/W(soft ware)system. The H/W system consist of media server unit, communication equipment with hand held device, portable camera, mike and head set. The advanced s/w system consist of data base system, client pc(personal computer) real time monitoring system which has server GUI(graphic user interface) program, wireless monitoring program and wire ethernet communication program. The client GUI program is composed of total solution program as pc camera program, and phonetic conversation program etc.. We analyzed the required items and investigated applicable part in the image transfer remote maintenance monitoring system with hand held device. Also we investigated linkage of communication protocol for developed prototype, developed software tool of two-way communication and realtime recording skill of voice with image. We confirmed the efficiency by the field test in preventive maintenance of plant power.

발전기의 사고 시뮬레이션과 분석 (Fault Simulation and Analysis of Generator)

  • 박철원;오용택
    • 전기학회논문지P
    • /
    • 제62권3호
    • /
    • pp.151-158
    • /
    • 2013
  • Large generator of power plant is very important. In order to protect large generator from faults, digital protective relay or IED is required. However, all protective relays for generators of the domestic power plant are operated by foreign products. And now, for technological independence from foreign and improvement of import substitution effect, IEDs using domestic technology are being developed. To evaluate performance of developing next-generation power devices, the study of the dynamic characteristics of the power plant, generator system modeling, fault simulation and analysis, should be considered. Specially, To obtain IEEE Standards COMTRADE format for relay operation test, generator system modeling and fault simulation using PSCAD/EMTDC tools must be preceded. Until now, a complete modeling of generator internal windings and fault simulation techniques dose not exist. In this paper, for evaluation performance of relay elements of developing IED, the generator system modeling and various faults simulation using PSCAD/EMTDC tools were performed. And then, the various transient phenomena through obtained relaying signal of developed modeling were analyzed.

설계기준초과지진에 대한 원전 배관 평가 방법 검토 (Review of Evaluation Method for Nuclear Power Plant Pipings under Beyond Design Basis Earthquake Condition)

  • 이대영;박흥배;김진원;김윤재
    • 한국압력기기공학회 논문집
    • /
    • 제12권1호
    • /
    • pp.56-61
    • /
    • 2016
  • After Japanese Fukushima nuclear power plant accident caused by the beyond design basis earthquake and tsunami, it has turned to be a major challenge for nuclear safety. IAEA, US NRC and EU have provided new safety design standards for beyond design basis event, Domestic regulatory bodies have also enacted guidances for licensees and applicants on additional methods related to beyond design basis events. This paper describes several evaluation methods for applying to nuclear power plants piping for beyond design basis earthquake. As a results, energy method based on the absorbed energy on nuclear power plant, deterministic method following design code and theory, experience method considering past earthquake data and information and probabilistic methods similar to probabilistic risk assessment were reviewed.

플라이애시를 혼합한 원전구조물 콘크리트의 기초물성 (Properties of Power Plant Structures Concrete Using the Fly-ash Admixtures)

  • 박광필;김성수;정호섭;김종필;이용광
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.419-420
    • /
    • 2009
  • 산업화의 발전과 환경에 대한 관심 급증으로 전력사용이 늘어나고 있다. 이에 대한 대책으로 원자력 발전소의 신설이 급증하고 있는 실정이다. 따라서, 원전구조물에 사용되는 콘크리트의 품질에 대한 검증자료가 국내에 많이 부족하므로 본 연구에서는 원전구조물 콘크리트에 대한 물성평가를 통하여 원전구조물 콘크리트의 기초자료로 활용하고자 한다.

  • PDF

A Study on the Measurement of Whole-Body Vibration in Some Coal-fired Power Plant Workers

  • Heo, Seung-Moo;Lee, Yun Keun;Park, Hee Sok
    • 대한인간공학회지
    • /
    • 제32권4호
    • /
    • pp.341-344
    • /
    • 2013
  • Objective: This study measured and evaluated the characteristics of the whole body vibration experienced in some coal-fired power plant in Korea. Background: Few studies have been carried out in Korea about the effects of whole body vibration of power plants on humans. Method: The evaluation scheme suggested by the Law of Noise and Vibration Control was applied. Results: It was found that 28.9% of total measurement points were above the limit suggested by the law. Conclusion: Many workers are exposed to whole body vibration during their job completion, and more efforts should be applied to prevention and control of the plat vibration.

국내 건설원전의 기계적철근이음 공법 적용성 분석 (Research on the constructability of mechanical splices in Nuclear Power Plant in Korea)

  • 방창준;이병수;정영환;임상준;박종혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.13-14
    • /
    • 2013
  • Mechanical splices has been applied in nuclear power plant according to ASME(American Society of Mechanical Engineering) and ACI(American Concrete Institute) Code requirements. In particular sleeve with ferrous filler metal splices and cold roll formed parallel threaded splices have been used in domestic nuclear power plants. The objective of this study is to find out the constructability of the mechanical splices which had been used in Korea nuclear job site and to review the technical trends in the near future.

  • PDF