DOI QR코드

DOI QR Code

Review of Evaluation Method for Nuclear Power Plant Pipings under Beyond Design Basis Earthquake Condition

설계기준초과지진에 대한 원전 배관 평가 방법 검토

  • 이대영 (한국전력기술 미래전력기술연구소) ;
  • 박흥배 (한국전력기술 미래전력기술연구소) ;
  • 김진원 (조선대학교 원자력공학과) ;
  • 김윤재 (고려대학교 기계공학부)
  • Received : 2016.05.31
  • Accepted : 2016.06.24
  • Published : 2016.06.30

Abstract

After Japanese Fukushima nuclear power plant accident caused by the beyond design basis earthquake and tsunami, it has turned to be a major challenge for nuclear safety. IAEA, US NRC and EU have provided new safety design standards for beyond design basis event, Domestic regulatory bodies have also enacted guidances for licensees and applicants on additional methods related to beyond design basis events. This paper describes several evaluation methods for applying to nuclear power plants piping for beyond design basis earthquake. As a results, energy method based on the absorbed energy on nuclear power plant, deterministic method following design code and theory, experience method considering past earthquake data and information and probabilistic methods similar to probabilistic risk assessment were reviewed.

Keywords

References

  1. IAEA, 2016, IAEA Safety Standard for protecting peoples and the environment, Safety of Nuclear Power Plants: Design, Specific Safety Requirements, No. SSR-2/1 Rev.1.
  2. US NRC, 2011, Near-Term Report and Recommendations for Agency Actions Following the Events in Japan.
  3. EPRI, 1991, TR-100082, Standardization of the Cumulative Absolute Velocity.
  4. US NRC, 1997, Pre-Earthquake Planning and Immediate Nuclear Power Plant Operator Postearthquake Actions, Regulatory Guide 1.166.
  5. EPRI, 1986, NP-6695, Guidelines for Nuclear Plant Responses to an Earthquake.
  6. Lee, Jong Rim, KEPRI, 2001, An Experimental Study on Seismic Damage Indicator Considering Cumulative Absolute Velocity Concept.
  7. EPRI, 2011, 1022682, EPRI-SQUG Damage-Indicating Parameter Information.
  8. ASME, 2015, Section III Appendix F, Rules for the Evaluation of Service Loading with Level D Service Limits.
  9. NRC, 1986, Safety Evaluation Report by the Office of Nuclear Reactor Regulation Relating to the Long-Term Service Seismic Reevaluation Program.
  10. EPRI, 2013, Seismic Probabilistic Risk Assessment Implementation Guide.