• Title/Summary/Keyword: Power Plant Boiler

Search Result 345, Processing Time 0.034 seconds

Configuration of a Boiler Control System in Thermal Power Plant (화력 발전소 보일러 제어 시스템의 구성에 관한 연구)

  • 변승현;박두용;김병철;신만수
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.168-168
    • /
    • 2000
  • In this paper, a boiler control system for thermal power plant is configured. The boiler control system for thermal power plant is largely composed of an ABC(Automatic Boiler Control) system and a MBC(Mill Burner Control) system. ABC system controls analog process values, so almost all analog control logic is dealt with in ABC system. On the other hand, MBC system relates to sequence control logic such as MFT logic, Furnace Purge, Safety related logic. Advanced control systems made from advanced countries deal with an ABC system and MBC system in a distributed control system. In this paper, we adopt a DCS as an ABC system and adopt a PLC system as a MBC system to configure a boiler control system for thermal power plant using domestic control system. Finally the validity of the configured boiler control system is shown via simulation using digital simulator for boiler system in thermal power plant.

  • PDF

Economic Feasibility of Circulating Fluidized Bed Combustion Boiler Power Plant for Low Grade Coal (저급탄용 순환유동층 보일러 발전설비의 경제성 평가)

  • Hong, Min-Pyo;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.73-80
    • /
    • 2012
  • The structure and combustion characteristics, and the economic feasibility of the circulating fluidized bed combustion(CFBC) boiler using low grade coal were introduced. The economic feasibility is evaluated by comparing a 500 MW CFBC boiler power plant using low grade coal and a pulverized combustion boiler power plant with high grade coal. As the result of the evaluation, the pulverized coal combustion boiler power plant has an internal rate of return of 12.95%, 1,395.9 billion Korean won of net present value, and 6.26 years of payback period. On the other hand, CFBC boiler power plant has an internal rate of return of 13.54%, 1,704.3 billion Korean won of net present value, and 6.02 years payback period. Therefore, the CFBC boiler power plant has better feasibility in all aspects, as 0.59% higher of internal rate of return, 308.4 billion Korean won of higher net present value and 0.24 year of shorter payback period.

  • PDF

The Development of Boiler Fuel Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 연료제어 알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.1
    • /
    • pp.36-44
    • /
    • 2013
  • This paper is written for the development and application of boiler fuel control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. Fuel control algorithm has the upper algorithm and it is boiler master control algorithm that controls the fuel, feed water, air by generation output demand. Generation output demand by power load influences fuel control. Because fuel can not be supplied fast to the furnace of boiler, fuel control algorithm was designed adequately to control the steam temperature and to prevent the explosion of boiler. This control algorithms were coded to the control programs of distributed control systems which were developed domestically for the first time. Simulator for coal-fired power plant was used in the test step. After all of distributed control systems were connected to the simulator, the tests of the actual power plant were performed successfully. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.

A Study on the Boiler Efficiency through the puliverizer classifier improvement of New Fossil Power Plant (화력발전소의 미분기 미분도 조정장치 개조을 통한 보일러 효율의 평가에 관한 연구)

  • Kweon, Y.S.;Suh, J.S.
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.721-725
    • /
    • 2001
  • The main reason for applying pulverizer classifier-rotary type in fossil power plant is boiler high efficiency and energy saving movement in the government. This study intends to analyze the boiler efficiency through the pulverizer classifier-rotary type improvement in thermal power plant and makes its comparison to that of the used fixed type.

  • PDF

A Study of Superheater Temperature Control on an Once Through Boiler in Thermal Power Plant (화력발전소 관류보일러의 과열기 온도제어에 관한 연구)

  • Lee, Jo-Hyun;Jeong, Tae-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.10
    • /
    • pp.2022-2027
    • /
    • 2009
  • An supercritical once through boiler system has been used in the korea standard-type thermal power plant. It is critical in boiler operation that superheater temperature should be controlled within the specified limit. In this paper, control logic scheme is suggested for superheater temperature in once through boiler. Finally the simulation result using process model based simulator shows the validity of suggested control logic.

Precise Diagnosis Technology for Power Plant Boiler (발전용 보일러 정밀진단기술)

  • Park, Min-Su;Kim, Jong-Oh
    • Proceedings of the KSME Conference
    • /
    • 2000.04a
    • /
    • pp.914-919
    • /
    • 2000
  • In most case high temperature components in fossil power plant are damaged by fatigue, creep and degradation. Design of power plant components is based on ideal loading such as temperature, pressure and so on. But in many cases unexpected loadings are applied at components. A key ingredient in plant life extension is the preventive diagnosis technology and remaining-life-assessment technology. This paper describes diagnosis technology and life-assessment technology for power plant boiler. It helps in setting up proper inspection schedules, maintenance procedures, and operating procedure.

  • PDF

Supplementary Control of Conventional Coordinated Control for 1000 MW Ultra-supercritical Thermal Power Plant using Dynamic Matrix Control

  • Lee, Youngjun;Yoo, Euiyeon;Lee, Taehyun;Moon, Un-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.97-104
    • /
    • 2018
  • This paper proposes supplementary control of conventional coordinated control of a power plant which directly affects network frequency. The supplementary control with dynamic matrix control is applied for 1000 MW power plant with ultra-supercritical (USC) once-through boiler. The supplementary control signal is added to the boiler feedforward signal in the existing coordinated control logic. Therefore, it is a very practical structure that can maintain the existing multi-loop control system. This supplementary controller uses the step response model for the power plant system, and on-line optimization is performed at every sampling step. The simulation results demonstrate the effectiveness of the proposed supplementary control in a wide operating range of a practical 1000 MW USC power plant simulator. These results can contribute the stable operation of power system frequency.

Retrofit of Analog Boiler Control Systems with Digital Control Systems in a Thermal Power Plant

  • Park, Doo-Yong;Byun, Seung-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1304-1308
    • /
    • 2005
  • This paper presents the case that the existing analog control systems were retrofitted with digital DCS(Distributed Control System)s for boiler unit in thermal power plant. Replacement of existing worn-out or obsolete analog control systems has been considered. Replacement of existing analog control systems with another analog control systems has lots of difficulties in maintaining the systems due to being out of stock. Due to those difficulties, existing analog control systems have been retrofitted with digital DCSs in many industrial sites. KEPRI(Korea Electric Power Research Institute) accomplished the project that retrofitted analog control systems with the developed DCSs for boiler unit in middle-scale coal-fired thermal power plant. The benefits of an upgrade to digital control include a increase of reliability due to system redundancy, ease of modifying the control logic and the parameters of function block, ease of maintenance due to available spare parts, improvement of information display, ease of modifying MMI(Man Machine Interface) displays, a increase in system availability, and improvement of control performance. This paper describes how to use the parameters of existing analog controllers, the implementation of digital PID controller, control system configuration for boiler unit in thermal power plant, some boiler control loops, control result during commissioning, and the comparison of boiler characteristic test data after retrofitting with the existing test data.

  • PDF

The Evaluation of Mechanical Property of X20CrMoV12.1 Boiler Tube Steels (X20CrMoV12.1강의 열화에 따른 기계적특성 평가)

  • Kim, B.S.;Lee, S.H.;Kim, D.S.;Jung, N.G.
    • Journal of Power System Engineering
    • /
    • v.8 no.3
    • /
    • pp.18-22
    • /
    • 2004
  • Boiler is one of the most important utilities providing steam to turbine in order to supply mechanical energy in thermal power plant. It is composed of thousands of tubes for high efficient heat transfer. The material for boiler tubes is used in such high temperature and pressure condition as $540^{\circ}C$, 22MPa. The boiler tube material is required to resist creep damage, fatigue cracking, and corrosion damages. 2.25%Cr-1Mo steel is used for conventional boiler tubes, and austenitenite stainless steel is used for higher temperature boiler tubes. But the temperature and pressure of steam in power plant became higher for high plant efficiency. So, the property of boiler tube material must be upgaded to fit the plant property. Several boiler tube material was developed to fit such conditions. X20CrMoV12.1 steel is also developed in 1980's and used for superheater and reheater tubes in supercritical boilers. The material has martensite microstructures which is difficult to evaluate the degradation. In this thesis, degrade the X20CrMoV12.1 steel at high temperatures in electric furnace, and evaluate hardness with Vickers hardness tester and strengths with Indentation tester.

  • PDF

A Fuzzy Control for Boiler System of Fossil-Power Plant (화력발전 보일러를 위한 퍼지제어기의 설계)

  • Moon, Un-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.140-142
    • /
    • 2001
  • Three single loop fuzzy logic controllers are designed independently for the control of boiler system of fossil-power plant. The control rules and the membership functions of proposed fuzzy logic control system are generated automatically without using plant model. The simulation shows successful results for wide range operation of boiler system of fossil-power plant.

  • PDF