Journal of Korea Society of Digital Industry and Information Management
/
v.10
no.1
/
pp.1-6
/
2014
In this paper, we propose a CPLD low power algorithm considering the structure. The proposed algorithm is implemented CPLD circuit FC(Feasible Cluster) for generating a problem occurs when the node being split to overcome the area and power consumption can reduce the algorithm. CPLD to configure and limitations of the LE is that the number of OR-terms. FC consists of an OR node is divided into mainly as a way to reduce the power consumption with the highest number of output nodes is divided into a top priority. The highest number of output nodes with the highest number of switching nodes become a cut-point. Division of the node is the number of OR-terms of the number of OR-terms LE is greater than adding the input and output of the inverter converts the AND. Reduce the level, power consumption and area. The proposed algorithm to MCNC logic circuits by applying a synthetic benchmark experimental results of 13% compared to the number of logical blocks decreased. 8% of the power consumption results in a reduced efficiency of the algorithm represented been demonstrated.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.7
no.2
/
pp.184-201
/
2013
In this paper, we study the problem of designing the power and number of cooperative node (CN) in the cooperation phase to maximize the average throughput for secondary user (SU), under the constraint of the total cooperation and transmission power. We first investigate the scheme of cooperative spectrum sensing without a separated control channel. Then, we prove that there indeed exist an optimal CN power when the number of CNs is fixed and an optimal CN number when CN power is fixed. The case without the constraints of the power and number of CN is also studied. Finally, numerical results demonstrate the characteristics and existences of optimal CN power and number. Meanwhile, Monte Carlo simulation results match to the theoretical results well.
Solar energy had become the main energy industry of renewable energy along with hydroelectric power generation. One of the technologies that contributed to the popularization of photovoltaic power and the decrease in the unit price of photovoltaic modules was the large-area solar cell. However, as the area increased, the light receiving area increased and the current value increased accordingly. Since power loss occurs when the current value was large, the number of busbar was increased to increase the current collection rate, and a technology to lower the current value through half-cutting was developed. The bus bar of the solar cell served as a passage through which the generated current was transmitted. This was because when the number of busbar decreases, the moving distance of electrons increased, so the amount of power generation decreases and when it increases, shadows occured. An important aspect of the electrode design was the optimal balance of these busbars and number of fingers. Therefore, in this study, the characteristics of the solar cell according to the number of front bus bars of the large-area solar cell were simulated using Griddler 2,5 pro. After selecting the number of busbar with the best characteristics, the difference was compared by varying the number of fingers and a better direction for the number of cutting was presented.
In this paper, we proposed low power algorithm for a task. The task means the inside of a necessary processor and external resources to work accomplishment of a system. Each task analyzes a life time and a number of called for implement a low power circuit. First of all, reduce power consumption of a task have maximum power consumption for low power circuit implementation. Therefore, first selecting a task had maximum power consumption. The task had a maximum power consumption ranking consider a life time and a number of called for each task. While a life time of task is long, top priority ranking to decrease power consumption to the task that the number of call generates the power consumption how a disguise is large in case of a lot of task becomes. Frequency decision to have minimum power consumption, and decrease power consumption all the circuit by a change of frequency of the task which the minimum task that a wasting past record is the maximum becomes. Also, keep continuously minimum power consumption, with every effort task until last life time in opening life time, and decrease gets total power consumption. Experiments results show reduction in the power consumption by 5.43% comparing with that [7] algorithm.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.12
no.6
/
pp.2581-2594
/
2018
The microcell terrain is the most common wireless network terrain in our life. In order to solve wireless network optimization of weak coverage in the microcell terrain, improve call quality and reduce the cost of the premise, power amplifiers in base stations should be adjusted according to user volume. In this paper, characteristics of microcell topography are obtained after analysis. According to the topography characteristics of different microcells, changes in the number of users at different times have been estimated, meanwhile, the number of scatter users are also obtained by monitoring the PCCPCH RSCP and other parameters. Then B-Spline interpolation method has been applied to scatter users to obtain the continuous relationship between the number of users and time. On this basis, power amplification can be chosen according to changes in the number of users. The methods adopted by this paper are also applied in the engineering practice, sampling and interpolation are used to obtain the number of users at all times, so that the power amplification can be adjusted by the number of users in a microcell. Such a method is able to optimize wireless network and achieve a goal of expanding the area of base stations, reduce call drop rate and increase capacity.
Journal of information and communication convergence engineering
/
v.5
no.1
/
pp.59-63
/
2007
In this paper, a CLB-based CPLD low-power technology mapping algorithm considered a Trade-off is proposed. To perform low-power technology mapping for CPLDs, a given Boolean network has to be represented in a DAG. The proposed algorithm consists of three steps. In the first step, TD(Transition Density) calculation has to be performed. Total power consumption is obtained by calculating the switching activity of each node in a DAG. In the second step, the feasible clusters are generated by considering the following conditions: the number of inputs and outputs, the number of OR terms for CLB within a CPLD. The common node cluster merging method, the node separation method, and the node duplication method are used to produce the feasible clusters. In the final step, low-power technology mapping based on the CLBs packs the feasible clusters. The proposed algorithm is examined using SIS benchmarks. When the number of OR terms is five, the experiment results show that power consumption is reduced by 30.73% compared with TEMPLA, and by 17.11 % compared with PLA mapping.
In this paper, a new symmetric multilevel inverter is proposed. A simple structure for the cascaded multilevel inverter topology is also proposed, which produces a high number of levels with the application of few power electronic devices. The symmetric multilevel inverter can generate 2n+1 levels with a reduced number of power switches. The basic unit is composed of a single and double source unit (SDS-unit). The application of this SDS-unit is for reducing the number of power electronic components like insulated gate bipolar transistors, freewheeling diodes, gate driver circuits, dc voltage sources, and blocked voltages by switches. Various new algorithms are recommended to determine the magnitude of dc sources in a cascaded structure. Furthermore, the proposed topology is optimized for different goals. The proposed cascaded structure is compared with other similar topologies. For verifying the performance of the proposed basic symmetric and cascaded structure, results from a computer-based MATLAB/Simulink simulation and from experimental hardware are also discussed.
The integrated power system combining a tidal power plant and two ocean current power parks is suggested. It is characterized by the set up of an ocean current power park in the lake side by installing a number of ocean current turbines generating electricity by using sea water flow discharged into the lake side from the turbine generator of a tidal power plant and an ocean current power park in the sea side by installing a number of ocean current turbines generating electricity by using sea water flow exiting into the sea side through the sluice gate from the lake side. The vision of the integrated power system is demonstrated by the simple theory and simulation results of the SIWHA Tidal Power Plant. And it is shown that the newly proposed integrated power system combining tidal power and ocean current power can produce very high economical benefits.
Journal of the Korean Society of Mechanical Technology
/
v.13
no.2
/
pp.85-91
/
2011
Computational results with pseudoplastic fluid flows for fully developed non-Newtonian laminar flows have been obtained. Those consist of the product of friction factor and Modified Reynolds number and Nusselt numbers with respect to the shear rate parameter in an annular pipe. The numerical results of the product of friction factor and Reynolds numbers and the Nusselt numbers for both Newtonian region and the power law region were compared with previously published asymptotic results, respectively. In the present calculations, the product of friction factor and Newtonian Reynolds numbers for pseudoplastic fluid at power law region in annular pipe is 180% less than that for Newtonian fluid. For power law fluids with different power law flow indices, the difference of the product of friction factor and power law Reynolds number between previous and the present results at the power law region is within 0.20%. The solutions also show the effect of the shear rate parameter on the Nusselt number and about 11% increase of Nusselt number at the power region.
Ajami, Ali;Mokhberdoran, Ataollah;Oskuee, Mohammad Reza Jannati
Journal of Electrical Engineering and Technology
/
v.8
no.6
/
pp.1328-1336
/
2013
Nowadays multilevel inverters are developing generally due to reduced voltage stress on power switches and low total harmonic distortion (THD) in output voltage. However, for increasing the output voltage levels the number of circuit devices are increased and it results in increasing the cost of converter. In this paper, a novel multilevel inverter is proposed. The suggested topology uses less number of power switches and related gate drive circuits to generate the same level in output voltage with comparison to traditional cascaded multilevel inverter. With the proposed topology all levels in output voltage can be realized. As an illustration, a symmetric 13-level and asymmetric 29-level proposed inverters have been simulated and implemented. The total peak inverse (PIV) and power losses of presented inverter are calculated and compared with conventional cascaded multilevel inverter. The presented analyses show that the power losses in the suggested multilevel inverter are less than the traditional inverters. Presented simulation and experimental results demonstrate the feasibility and applicability of the proposed inverter to obtain the maximum number of levels with less number of switches.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.