• Title/Summary/Keyword: Post-installed concrete anchor

Search Result 27, Processing Time 0.031 seconds

An Performance Evaluation of the Post-installed Anchor System According to the Freezing and Thawing of Concrete and the Corrosion of Anchor (콘크리트의 동결융해와 앵커의 부식에 따른 후 설치 앵커시스템의 성능평가)

  • Kwon, Min-Ho;Kim, Jin-Sup;Jung, Woo-Young;Kwon, Sang-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.5
    • /
    • pp.31-39
    • /
    • 2013
  • In this study, performance of the post-installed anchor system was evaluated with reduced strength of concrete and anchor. One of the post-installed anchors was selected to performance evaluation. Concrete strength was reduced by freeze-thawing test, and the post-installed anchor strength was reduced by corrosion test. The post-installed Anchor was installed in concrete of freezing and thawing and original concrete, and corroded anchor was installed in original concrete only. Anchor diameter and installation depth of the anchor were the variable for each specimen. Performance of post-installed anchor system of each specimen was evaluated by pullout test. Anchor diameter and installation depth of anchor, it may affect the performance of the post-installed anchor system from the experimental test results. Fracture mode of each post-installed anchor system had occurred differently depending on the durability of concrete and anchor. The anchor pullout strength from the experimental test results was used in order to compare with the results of CCD (Concrete Capacity Design) method, and CCD equation was modified. Modified equation was able to predict the anchor pullout strength of post-installed anchor system in Original concrete and freezing and thawing of concrete.

An Experimental Study on the Shear Failure Behavior of Post-installed Set Anchor for Concrete (콘크리트용 후설치 세트앵커의 전단파괴거동에 관한 실험적 연구)

  • Um, Chan-Hee;Yoo, Seung-Woon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.367-375
    • /
    • 2014
  • Recently the use of concrete post-installed set anchors has been increasing because this constructing method is flexible and easy to attach or fix structural members when we repair, reinforce, or remodel a concrete structures. Depending on the shear strength of steel, the strength of concrete, edge distance and anchor interval, etc, the anchor loaded in shearing exhibits various failure modes such as steel failure, concrete failure, concrete pryout. In this study, the objective is to investigate the effects of the variations like anchor embedment depth, anchor interval, edge distance and concrete strength on the shear failure behavior of post-installed concrete set anchor embedded in concrete. The results of embedment depth experiments show that concrete strength has much effection on the shallow embedment depth. Steel failure occur to all results of the anchor interval experiments, but concrete is failed when edge distance experiments that less than the embedment depth. Through the comparision of the same parameters experiments results show that as strong as concrete strength are the displacement results are small.

An Experimental Study on Pullout Characteristics of Post-installed Set Anchor for Concrete under Edge Distance, Anchor Interval and Concrete Strength (연단거리, 앵커간격 및 콘크리트 강도에 따른 콘크리트용 후설치 세트앵커의 인발특성에 관한 실험적 연구)

  • Suth, Ratha;Yoo, Seung-Woon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.2469-2475
    • /
    • 2014
  • In 1990s, with the increase of domestic building renovation but also increase the amount of anchor. The 45-degree cone failure theory has been used in concrete anchor bolts design, but the CCD (concrete capacity design) method was adopted as a new design method since 2000. However, the method has some problems because it is based on the experimental results of pre-installed concrete anchor bolts. In this study, the objective is to investigate the effects of anchor edge distance, anchor interval and concrete strength on pullout characteristics of post-installed concrete set anchor embedded in plain concrete.

An Experimental Study on the Pullout Failure Behavior of Post-installed Concrete Set Anchor (후설치 콘크리트 세트앵커의 인발파괴거동에 관한 실험적 연구)

  • Suth, Ratha;Yoo, Seung-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.1
    • /
    • pp.40-47
    • /
    • 2014
  • Recently the use of concrete post-installed set anchors has been increasing because this constructing method is flexible and easy to attach or fix structural members when we repair, reinforce, or remodel structures. Accordingly, designers and builders of Korea depend on foreign design codes since there are no exact domestic anchor design codes that they could credit. The anchor in plain concrete loaded in tensile exhibits various failure modes such as concrete breakout, splitting, steel failure, pull-out and side-face blowout, that depending on the tensile strength of the steel, the strength of concrete, embedment depth, interval, the edge distance and the presence of adjacent anchor. The objective is to investigate the effects of the variations like anchor embedment depth, interval and edge distance on pull-out fracture behavior of post-installed concrete set anchor embedded in plain concrete.

An Performance Evaluation of Post-installed Anchor according to the Effective Embedment Length (유효묻힘깊이에 따른 후설치앵커의 인발성능평가)

  • Hur, Moo-Won;Chae, Kyoung-Hun;An, Yeong Seung;Hur, Moo-Won
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.4
    • /
    • pp.19-25
    • /
    • 2019
  • Concrete wedge anchor is one of structural components to transfer load of an object attached to a primary structure. Recently, as retrofitting concrete structure is becoming a main issue, mechanical capacity of the anchor should be secured enough. In spite of the structural safety of Cast-in-place anchor, Post-installed anchor is more widely used with ease of placement or change of construction method. However, the post-installed anchors domestically produced have excessive coefficient of variation over 15% of ultimate tensile strength, which yields deteriorated quality in tensile strength. In this research, tensile strength test of anchors, which have improved sleeve and header and produced by a domestic company, was conducted for two variables, concrete strength and effective embedment depth. As a result, enough coefficients of variations were secured in all specimens. Also, in comparison to foreign products, the domestic ones have equal or higher performance.

A Parameter Study on the Shear Failure Behavior of Post-installed Set Anchor for Light Load (저하중용 후설치 세트앵커의 전단파괴거동에 관한 매개변수 연구)

  • Um, Chan-Hee;Yoo, Seung-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.55-63
    • /
    • 2015
  • Post-installed concrete set anchors are installed after the concrete hardened. These anchors increasing usage in development of construction equipment and flexible construction. The anchor loaded in shearing exhibits various failure modes such as steel failure, concrete failure, concrete pryout, depending on the shear strength of steel, the strength of concrete, edge distance and anchor interval, etc,. In this study, the objective is to investigate the effects of the variations like anchor embedment depth, edge distance and concrete strength on experimental and finite element analysis of shear failure behavior of post-installed concrete set anchor for light load embedded in concrete. The results of embedment depth experiments show that concrete strength has much affection on the shallow embedment depth. Concrete strength has no much affection with anchor interval and edge distance parameter and both experimental results occurred same failure mode. By comparing the experimental results that occurred steel failure mode show that as strong as concrete strength are the displacement results are small.

An Experimental Study on Pullout Characteristics of Post-installed Set Anchor for Concrete Under Embedment Depth and Concrete Strength (콘크리트용 후설치 세트앵커의 매입깊이 및 콘크리트 강도에 따른 인발특성에 관한 실험적 연구)

  • Suth, Ratha;Yoo, Seung-Woon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5237-5242
    • /
    • 2013
  • Recently, many bridges become not only functionally obsolete of bridge dick due to inadequate width but also structurally deficient of substructure due to erosion. In these case widening is almost always more economical than complete replacement, and therefore there is a need to make available the results of research and field experience pertaining to the widening of bridge substructure. But, an experimental study for the guarantee of unification between existing and new substructure with post-installed concrete set anchor is so insufficient that the development of post-installed concrete set anchor system for the unification should be settled promptly. The objective is to investigate the effects of anchor embedment depth and concrete strength on pullout characteristics of post-installed concrete set anchor embedded in plain concrete. The effects of embedment depth variable is depending on concrete strength as strong as concrete strength is pullout load is high. Regardless of concrete strength, embedment depth that less than 6 times appeared concrete failure mode but for embedment depth that over 8 times concrete strength has no affection on failure mode.

Design Evaluation of the Post-installed Anchor considering Effective Embedded Depth and Concrete Strength (유효 묻힘 깊이와 콘크리트 강도를 고려한 후설치 앵커의 설계식 평가)

  • Hur, Moo-Won;Chae, Kyoung-Hun;Won, Jae-Sik;Park, Tae-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.3
    • /
    • pp.13-20
    • /
    • 2021
  • Post-installed anchor is a structural material that connects structural and non-structural members to existing concrete members. However, there are cases where rebar interception and construction error occur at the site. In that case, measures are needed to prevent performance degradation of the rear-installation anchors. In this study, in order to evaluate the performance of torsional control expandable post-installed anchors for compressive strength and effective depth of the reference concrete was tested. The results of the most commonly used tests of M10 and M20 showed that had variable coefficients within 15%, satisfying the reliability presented in KCI(2017). It was also confirmed that the depth of the buried and the strength of concrete affect the strength of the pavement. Based on the results of the existing similar studies and the results of this study, the design equation of the post-installed anchor was proposed and the results were compared with the existing design.

Experimental Verification on the Structural Safety of Cantilever Beam Connected with Post-installed Adhesive Anchor Bolts (부착식 후설치 앵커로 연결된 내민보의 구조 안전성에 대한 실험적 평가)

  • Oh, Hong-Seob;Park, Sung-Rak
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.4
    • /
    • pp.529-536
    • /
    • 2011
  • Recently, there has been a growing interest in expanded sidewalks for existing bridges. The cantilever beam system applied to expanded sidewalks for existing bridges are connected with the concrete structure by adhesive anchor bolts. However, the extended sidewalks are currently constructed without standardized regulations, which lead to excessive design of the beam spacing and installation and the construction difficulties due to the excessive over-weight. Moreover, there is only limited analysis and experiment data on the post-installed adhesive anchor bolts, so the excessive number of bolts is used for the connection. This paper deals with a method to increase the effectiveness of beam sections and anchor bolts geometry for expanded sidewalk of existing bridge. The study results showed that the failure of cantilever beam connected by adhesive anchor bolts was dominated by bond failure of interface between concrete and bolt. Also, the results indicated the possibilities of improving serviceability as well as safety of the sidewalks by changing of beam section and prestressing the bolts.