1 |
H. S. Oh, S. R. Park, "Experimental Verification on the Structural Safety of Cantilever Beam Connected with Post-installed Adhesive Anchor Bolts", Journal of the Korea Concrete Institute, vol. 23, No. 4, pp.529-536, August, 2011. DOI: http://dx.doi.org/10.4334/JKCI.2011.23.4.529
과학기술학회마을
DOI
ScienceOn
|
2 |
J. S. Kim, M. H. Kwon, H. S. Seo, J. H. Park, "Performance Evaluation and Analysis Model for the Post-Installed Anchor", Journal of KOSHAM, vol. 13, No. 2, pp.89-95, April, 2013. DOI: http://dx.doi.org/10.9798/KOSHAM.2013.13.2.089
과학기술학회마을
DOI
ScienceOn
|
3 |
K. M. Lee, C. Y. Lee, S. H. Jung, S. W. Choi, "Tensile and Shear Test Method for Post-installed Mechanical Anchors Embedded in Concrete", Journal of the Korea Concrete Institute, vol. 21, No. 1, 2009.
|
4 |
I. H. Moo, Mechanical Behavior of Extra-Large Sized Anchor System Embeded in Concrete, Hanyang University, 2005.
|
5 |
ACI Committee349, Code Requirements for Nuclear Safety Related Concrete Structures(ACI 349-85), American Concrete Institute, Detroit, 1985.
|
6 |
F. Werner, E. Rolf, E. B. John, "Concrete Capacity Design(CCD) Approach for Fastening to Concrete," ACI Structural Journal. vol. 92, No. 1, pp.73-94, January, 1995.
|
7 |
S. Y. Hwang, A Study on the Fracture Resistance Characteristics of Post-Installed Anchor, Seoul National University of Science and Technology, 2011.
|
8 |
S. Y. Park, Assessment of Fracture Behavior and Design Methods for the Anchorage Systems Fastening to Concrete, Korea University, 1999.
|
9 |
Y. M. Park, M. H. Jeon, M. K. Choi, C. H. Kim, "A Study on the Concrete Breakout Capacity Evaluation of Medium-to-Large size CIP Anchor Bolts under Tension Loading", Journal of Korean Society of Steel Construction, vol. 23, No. 4, pp.493-501, August, 2011.
과학기술학회마을
|
10 |
J. M. Kim, Tensile Fracture Behavior of Anchors to Concrete, Changwon National University, 2002.
|