• Title/Summary/Keyword: Post evaluation system

Search Result 495, Processing Time 0.024 seconds

A Study on Establishing the Evaluation System of the Stock Enhancement Program (수산자원조성사업의 합리적인 평가체계 도입 방안에 관한 연구)

  • Kim, Dae-Young;Ryu, Jeoung-Gon;Lee, Jeoung-Sam
    • The Journal of Fisheries Business Administration
    • /
    • v.41 no.1
    • /
    • pp.1-24
    • /
    • 2010
  • The main goal of the study is to propose an objective and standardized evaluation system of stock enhancement programs. In order to achieve this goal, the study first suggested the need for stock enhancement program evaluation system through the review of current status and problems. Second, the study identified possible problems of the existing stock enhancement program evaluation by reviewing domestic and foreign evaluation systems. Finally the study proposed a new evaluation system and implementation plan of it. This study also classified the program evaluation criteria into ex-ante evaluation and ex-post evaluation according to the evaluation point in time, and applied the economic, political and technical feasibility tests into the evaluation of the stock enhancement program in order to solve the current problems of the evaluation. The evaluation process of the stock enhancement program is composed of an evaluation system design, estimation of weights using the analytical hierarchy process, design of estimation standard, conversion of scores and final summary of the evaluation. The central government takes the lead in the evaluation of the regional (metropolitan city or province) projects and the regional government is in charge of the evaluation of the local (city or county) projects. For the implementation of the ex-ante evaluation, either the regional or local governments ask for the evaluation and then submit an evaluation plan and other necessary documents to the upper level governments. The ex-post evaluation is then carried out by the upper level governments.

A study on the Improvement of the Construction Post-evaluation System in Public Construction Projects (건설공사 사후평가시스템의 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk;Yang, Sung-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.305-308
    • /
    • 2015
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.

  • PDF

A STUDY ON THE IMPROVEMENT OF POST-EVALUATION ITEM FOR PERFORMANCE MEASUREMENT IN THE BUILDING CONSTRUCTION

  • Lee, Eun-Ji;Ha, Hee-Yoon;Ko, Hyun;Kim, Jae-won;Kim, Jae-Jun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.407-416
    • /
    • 2007
  • The construction industry in South Korea is experiencing great changes: it is becoming developed on a larger scale, specialized to a high degree and rapidly incorporating with other industries. This development has resulted in higher demand of construction industry. Accordingly, the transparency and an objective method of evaluation in the process of projects in the construction industry are gaining more importance. Clients' and customers' needs also require more specific objective evaluation to find whether their projects are successfully performed or not. This study aims to discuss problems on the current post-evaluation items including the qualitative item analysis such as customer satisfaction. Moreover, this paper suggests the improved ways in which enable the application of the effective evaluation system to the construction industry.

  • PDF

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Development of the Qualitative Model for Post Construction Evaluation (건설공사 사후평가의 정성평가 모델 개발)

  • Lee, Kyu-Sun;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.733-739
    • /
    • 2018
  • Various public construction projects have been performed for public welfare and appropriate evaluation of the effectiveness and efficiency has been required. In accordance with legislation of a post construction project evaluation in Construction Technology Promotion Act, all construction projects that exceed 30 billion won in budget are required to perform post evaluation. Korean Government provides post construction evaluation manual that includes both quantitative and qualitative criteria. However, it only provides general concepts and procedures not but detail guidelines for different construction project types and characteristics. Therefore, this paper developed a standard format for qualitative evaluation using survey through analyzing previous cases and research. As a result, the developed standard for survey can be applied for most civil and architectural facilities. However, it will need further research regarding establishment of detailed evaluation criteria for each type of facilities and data storage system for feedback.

Study on the Evaluation Method of Electrical Isolation Property for Hydrogen Fuel Cell Vehicle in Post Crash (수소연료전지자동차의 충돌시 절연성능 평가방법에 관한 고찰)

  • Lee, Kiyeon;Gil, Hyoungjun;Kim, Dongook;Kim, Dongwoo;Kang, Daechul
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.23 no.6
    • /
    • pp.612-618
    • /
    • 2012
  • In this paper, in order to prevent electric shock of high voltage system of HFCV after crash test, insulation performance measurement methods were studied. Under conditions of in-use, insulation performance tests can be divided into measurement method using the vehicle's own RESS as DC voltage source and measurement method using DC voltage from off-vehicle sources. However, these tests can not be applied after a post-crash because parts of high voltage system cover should be removed, and insulation performance can be influenced during these tests. Therefore, we proposed post-crash insulation performance test methods for preventing electric shock through problem analysis of previous post-crash insulation performance tests. Also, test equipment which can measure voltage absence and total energy was developed. We verified performance of the equipment through experiments with vehicle test.

A Study on the Post Evaluation for University Public Space Renovation based on Analysis of Students' preference (대학생 선호도 분석 기반 대학 공용공간 리노베이션의 사후평가에 관한 연구)

  • Choi, Ho-Soon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.27 no.3
    • /
    • pp.15-23
    • /
    • 2020
  • Nowadays, many educational facilities are being renovated. However, due to the absence of a system for post renovation of educational spaces, users are less satisfied with the spaces after the renovation and there is a limit in establishing future directions for improving educational space renovation. From this point of view, this study was conducted to increase the users' satisfaction in renovation space planning of educational spaces and to establish a system for management after renovation. As a specific research method, the space preference of students was used to evaluate the space after renovation. By researching the opinions of the students who use the most educational space, not only the direction of the renovation plan of the future educational space can be given but also the user's opinion can be reflected in the spatial plan in detail. In terms of management of future educational spaces, this study can be used as a basic study for developing post evaluation indicators for renovation of educational facilities.

Research for Relations between Satisfaction of Participants and Intension of Participation in terms of Evaluation Indicators of Public Management System (공공관리제도의 평가지표에 대한 사업참여자의 만족도 및 사업참여의사에 관한 연구)

  • Lee, Jeong-Jae;Kim, Gu-Hoi;Lee, Joo-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.5
    • /
    • pp.269-281
    • /
    • 2016
  • This research made a evaluation indicators of public management system for operating efficient urban and housing redevelopment. We analyzed how satisfaction of participants about the evaluation indicators are used to parameters and affects intension of participation structure by using PLS structural equation model. We choose result evaluation tools: Foucs Group Interview and Balanced Score Card for appraising public management system. Specifically, We categorized setting business planning and selecting business tool, operating participation groups, motivating participation, post management and sustainability, and economics of business. As a results of the evaluation, setting business planning and selecting business tool, post management and sustainability, and economics of business influence comprehensive satisfaction. Post management and sustainability, economics of business, and setting business planning and selecting business tool turned out that they are very influential in the arranged order.

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.