건설공사 사후평가 제도 활성화 방안 수립 (Strategies for Facilitating Post-Construction Evaluation and Management System)

  • 이강욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

건설공사 사후평가 수행결과 활용도 개선 방안 (Improvement scheme of utilization of the results of the post-construction evaluation system)

  • 이두헌;박재우
    • 한국건설관리학회논문집
    • /
    • 제14권6호
    • /
    • pp.78-89
    • /
    • 2013
  • 건설공사 사후평가 제도는 공공건설사업 수행결과를 반영하여 향후 유사한 공공건설사업의 계획 수립 시 활용되어져야 하나, 현행 제도는 당초 기획 계획 당시에 추정한 수요, B/C비율, 공사비, 공사기간 등 예측치와 건설공사 완공후 일정기간(3년 내지 5년) 경과후에 측정한 실제 결과치를 단순히 비교하여 제시하는 수준에 그치고 있다. 또한 대부분 공공발주기관에서는 수동적인 사후평가 업무수행에 그치고 있어 제대로 환류가 이루어지않고 있다. 이에 본 연구에서는 공공발주기관을 대상으로 설문조사를 실시하여 건설공사 사후평가 제도의 수행현황을 파악하였으며, 국내 사후평가 제도와 유사한 미국과 일본의 건설사업 평가체계를 벤치마킹하였다. 또한, 건설공사 사후평가 제도와 관련된 국토부 실무담당자와의 수차례 업무회의를 실시하여 사후평가 수행의 적시성 확보 및 활용성 강화방안을 제시하였다. 이와 같이 건설공사 사후평가 제도 개선을 통해 건설사업 수행과정에서의 목표 및 성과에 대한 확인 점검 분석 체계를 내실화하고, 건설공사 특성별로 평가내용 및 방법을 차등화함으로써 발주청의 사후평가 수행에 대한 실천력이 제고될 것으로 기대된다.

정보화 성과의 사전-사후평가 차이에 관한 사례연구 (A Case Study of the Discrepancy between Ex Ante and Ex Post Evaluation of IS Performance)

  • 이국희;박소현;구본재;이미영
    • Journal of Information Technology Applications and Management
    • /
    • 제19권2호
    • /
    • pp.59-78
    • /
    • 2012
  • The purpose of this longitudinal case study is to shed light on the reliability problems of IS performance evaluation by analyzing the discrepancy between ex ante evaluation in 2011 and ex post evaluation in 2012. Through an information system development project of a public enterprise, the gap between ex ante and ex post evaluation was ascertained and the causes as to why such gap occurs and the success factors that can solve the problems were derived. The ex ante evaluation of IS performance was performed based on both IS success model and BSC model and the ex post evaluation was carried out at the time after the target system has been built up by applying the evaluation measures and process that are similar to the ex ante evaluation. In the ex ante evaluation the business performance improved by the target system was estimated to 18.2%. On the other hand, it was seen as being low at 15.2% in the ex post evaluation and the differences were found to be statistically significant in 6 out of 10 measures. The reasons as to why such gap occurs were diagnosed as being of 2 types : (1) changes in the evaluation psychology according to the differences in the evaluation objectives; and (2) excessive expectation levels of the target system that is formed at the time of the ex ante evaluation. In other words, the users who have excessive expectations tend to overestimate in the ex ante evaluation and, in the ex post evaluation, tend to underestimate lower than the actual performance mainly due to disappointment on the results that do not meet the early expectations. As solutions to overcome the reliability problem of ex ante evaluation, 3 factors were derived : (1) the temperance of excessive expectation levels of the users; (2) a clear definition of the scope and functionality of the target system; and (3) actual commitments for the evaluations of IT performance.

IT 비즈니스 가치 평가관점 : 사전-사후 평가시점 및 정보시스템 유형별 차이 (Evaluation Criteria of IT Business Value : The Difference Between Ex Ante and Post Implementation Evaluation)

  • 박소현;이국희
    • Journal of Information Technology Applications and Management
    • /
    • 제15권1호
    • /
    • pp.203-224
    • /
    • 2008
  • The purpose of this study is to investigate the evaluation perspectives of IT business value and empirically analyze the differences of evaluation perspectives between ex ante evaluation and post implementation evaluation, and among various information system types. 4 evaluation perspectives which have been used in the previous studies and in the field of industry practices are financial, customer, internal process, and growth, which are based on the BSC model. Data of 98 information systems have been collected from 89 companies including manufacturers, banks, insurances, and stock trading companies. As results of multi-way MANOVA test, 3 out of 8 hypothesis have been accepted statistically. While the order of importance of 4 perspectives in ex ante evaluation is customer, financial, internal process, and growth, the order of post implementation evaluation appears to be much different : that is, internal process, customer, financial, and growth. These findings provide insights for both IT practitioners and researchers.

  • PDF

감리업체 사전/사후 평가방안의 공학적 연계 (A Study on the Relationship between the Ante and Post Audit Companies Evaluation)

  • 선우종성
    • 한국IT서비스학회지
    • /
    • 제3권1호
    • /
    • pp.117-126
    • /
    • 2004
  • In this study an evaluation method is proposed, with the strong relationship between the ante and post audit works evaluation. The ante evaluation does in general and systematic ways, with past audit results and proposals. The criteria-based evaluation is used for the audit activities and outputs. The critical success factors for the projects applies to the activities evaluation and product evaluation framework to the output. The ante and post evaluation have the cross evaluation items to be the whole and continuous one. Eighteen common evaluation items are derived, with their own evaluation elements in detail, which have only differences of the actually done and expectations between the ante and post. The proposed evaluation makes the ante and post one to be related with each other in a systematic and objective ways, to enhance the reliability of audit results and effectiveness of the audit.

사후평가의 평가체계 개선방안에 관한 연구 (A Study on Improvement Evaluation of Reliability of Ex-post)

  • 조창희;김시곤;안찬기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2182-2191
    • /
    • 2011
  • Postmortem evaluation through the dictionary and the lack of points for the wrong strategy to respond to the avoid the prediction is important. However, the prevailing system of ex post facto assessment of postmortem simply does not have statistical figures to be provided only for the conditions. Thus, in this study, rail business is mainly evaluation procedures and evaluation of the verification system of ex post facto evaluation as to the issue, do not improve.

  • PDF

건설공사 사후평가 전문기관 설치 필요성 연구 (A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects)

  • 이두헌;박희성
    • 대한토목학회논문집
    • /
    • 제36권2호
    • /
    • pp.285-295
    • /
    • 2016
  • 건설공사 사후평가 제도는 공공건설사업의 계획단계에서 예측한 이용수요 사업비 사업기간 등에 대한 예측치를 준공 후에 평가함으로써, 차후 유사사업 추진 시 그 평가결과를 참고하여 발주청의 시행착오를 줄이기 위한 목적으로 2000년도에 도입되었다. 그러나 객관성 및 신뢰성이 결여된 평가 수행체계 및 부재한 활용주체로 인하여 건설공사 사후평가 제도 정착 및 활성화에 걸림돌이 되고 있다. 이에 본 연구에서는 선진외국의 건설사업 평가수행 및 관리 활용 체계를 벤치마킹하여 국내 사후평가 체계 개선을 위한 시사점을 도출하였고, 공공 발주청 사후평가 담당자 및 사후평가위원회 활동경험이 있는 전문가를 대상으로 설문조사를 실시하여 사후평가 전문기관 설치의 필요성 및 전문기관에서 담당해야 할 기능 및 업무내용 등을 도출하였다. 도출된 분석결과를 바탕으로 최종적으로 본 연구결과가 실효성이 확보될 수 있도록 관련 법령 및 지침 개정안을 마련하였다. 본 연구 결과를 통해 향후 전문기관이 설치된다면 대규모 건설사업 시행과정을 면밀히 분석하여 차후 유사사업 수행 시에 많은 시행착오를 줄일 수 있으며, 관행적 반복적으로 적용되는 건설사업 수행방식을 개선하여 기술경쟁력이 제고될 수 있다.

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • 제5권4호
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

건설공사 사후평가시스템 입력오류 분석에 관한 연구 (A Study of Error Analysis for Post Evaluation System on the Construction Projects)

  • 김경훈;이두헌;김태영
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.77-85
    • /
    • 2015
  • 현재 건설공사 사후평가시스템 입력과정에서 자료가 오류 및 누락이 발생되는 경우가 많아 데이터의 신뢰성이 떨어지는 경우가 많다. 이에 따라 본 연구에서는 사후평가 결과분석의 신뢰성 확보를 위해 건설공사 사후평가시스템의 입력누락 및 입력오류에 대한 세부적인 분석을 실시하였다. 분석결과, 건설사업 초기 단계일수록 자료의 미입력된 자료의 비중이 높게 나타났다. 그리고 분석된 등록오류로는 참고자료의 부정확, "원" 단위 오류, 입력항목에 대한 이해부족 등으로 나타났다.

일반농산어촌개발사업 사후평가체계 정립을 통한 우선 지원마을 선정 방법 - 태안군 일반농산어촌개발사업을 중심으로 - (A Method of Selecting Priority Support Villages by Establishing an Post Evaluation System for Rural Development Projects - In the Case of Rural Development Projects of Taean-gun -)

  • 양지은;노윤진;이재호
    • 농촌계획
    • /
    • 제27권4호
    • /
    • pp.71-82
    • /
    • 2021
  • A diverse rural development projects are continuously increasing. However, in most villages, the business run by residents is not being operated normally. Followed by these problems, a follow-up management evaluation system has been created and utilized, but the existing evaluation system is only administratively approached and not suitable for application in reality. This research emphasizes that the perspective of community and re-startup support should be added to the evaluation system as these are projects that are carried out to improve the quality of life of local residents and enhance the rehabilitation of villages. Based on the evaluation system proposed in this study, field surveys and interview surveys were conducted targeting 10 villages in Taean-gun, Chungcheongnam-do in South Korea. As a result of the study, various types that have not been activated were derived, and they were presented by categoriz ing them. The purpose of this study is to help the rehabilitation of common rural villages by providing a updated post evaluation system and items that can be applied not only to Taean-gun but also to numerous villages in the entire villages in South Korea.