This paper provides two case studies of environmental impacts with socio-economic values. The first case is on flood protection levees conducted from 2003 to 2004 in Phu Tan district, An Giang province. The impacts were found by comparing full flood protection levees area (FFPL) to non-full flood protection levees area (NFFPL). Participatory Rural Appraisal (PRA) tools per each group of rich, middle, and poor people were used to list the impacts. Then, major impacts were selected by ranking and interviewing 60 households per site, and assessed by Cost Benefit Analysis (CBA) in rice production from 1996 to 2002 between two areas. The tested research indicated moving system of NFFPL to that of FFPL lost about 11 million VND/ha/year. The second case is on impacts of Penaeid shrimp farming conducted in Duyen Hai District, Tra Vinh Province in 2004-2005. Ninety households and 12 local officials were interviewed. Four PRAs were conducted and 36 water samples were taken inside and outside shrimp pond to measure values of DO, COD, Fe total, TSS, N-$NO_3{^-}$, N-$NH_4{^+}$, P-$PO{_4}^{3-}$, and Chlorophyll-a. Research results showed only 36.7% of the households got profit from shrimp farming. Highest financial efficiency was 0.72 for the semi-intensive system. Tested water indicators showed surface water quality did not match Vietnamese standard for surface water in coastal area (TCVN 5943-1995) and in rain. The water was very muddy and contaminated by organic aluminum. Summarily, the impacts were clarified more obviously via adding socio-economic values to assessment. Importantly, the values were transformed to household's income which is an indicator for policy-makers to consider the impacts obviously. Besides, data of different group of people impacted are cases contributing to consideration of the impacts in an appropriate social level.
Tendency in ratio of biotope area of environmental impact assessment (EIA) according to population, location, project type, and total project area was analyzed by type of the projects. According to EIA, biotope area ratio is the ratio of the weighted biotope areas and total project area. biotope area is important to resident's health and quality of their life. Ministry of Environment recommends to meet the biotope area ratio standard presented by each project type. The analysis is based on 4 types of project, urban development, industrial comlpex deveopment, tourism development, and waste and sewerage treatment facility, and 55 data extracted from them. It is needed that new standard that the population is reflected, adjustment that region and frequency are considered, and regulation strengthening according to achievement of 'the minimum achievable goals' to improve biotope area policy. The research includes more data and improvements of specific system are needed as a further research.
Wonsoo Kang;Moonjin Lee;Hoon Choi;Kyewon Kim;Youngkyu Park
Journal of the Korean Society of Marine Environment & Safety
/
v.29
no.2
/
pp.106-117
/
2023
The social impact of hazardous and noxious substances from marine industrial facilities was evaluated, and implications for the application of social impact assessment items and methods required in the process of setting technology-based effluent limitations were derived. The scope of the study was based on marine industrial facilities in Incheon Metropolitan City. The analysis results are as follows. First, the impact on companies and industries was evaluated as "great," but large companies had little impact on operating profit losses, bankruptcy possibilities, and employment losses, while small and medium-sized companies had a large impact. Second, the impact on the community and economy was evaluated as "less," but it is judged that careful policy intervention is needed because the impact of fishing producers, local tourism workers, and the region can be concentrated and large. Third, it is judged that items and methods for calculating social loss costs and social benefits can be usefully applied in the method of setting technology-based effluent limitations.
Journal of the Korean Society of Environmental Restoration Technology
/
v.24
no.2
/
pp.115-126
/
2021
Strategic Environmental Impact Assessment (SEA) is a decision-making process taking into account the environmental impact, economic and social impact of policies, plans, and programs at the higher stage prior to the project plan for promoting sustainable development. In this study, we analyzed the process and criteria for selecting appropriate alternatives when establishing development plan in SEA. First, the criteria for estimating changes in ecosystem services following the implementation of development project of industrial complex were presented. Second, alternative evaluations were conducted through an analysis of ecosystem service scenarios to explore suitable alternatives in Anseong. As a result, the environmental quality of selected area as the existing project site deteriorated according to the implementation of the project, and the dimensional reduction technique confirmed that the change in ecosystem service factors in project area was the optimal location. In addition, the results of the scenario assessment to explore suitable alternatives in Anseong City showed that the existing site had large capacity in terms of water quality control services (scenario 1), scenario 2 in terms of preconditioning services, and scenario 3 in terms of water supply services. The guidance of Ecosystem service assessment is expected to be available in decision-making of large-scale strategies (e.g., SEA) and projects by presenting more quantitative criteria for determining the adequacy and location feasibility of development plans and policy plans. This is expected to require various support, including legislation and revision of related laws, believed to be supported by advanced research.
Journal of the Korean Society of Marine Environment & Safety
/
v.17
no.1
/
pp.1-6
/
2011
The underlying principle of environmental conservation and restoration is to receive continuous services from nature. In this context, the basic objective of oil spill response and recovery activities is to allow affected residents to retain sustainability of their daily livelihood and productive environment. Hence, monitoring the status of socio-economic impact and the extent of restoration is an important parameter in the restoration effort to repair the damaged functions of environmental services with oil spill accident. However, assessment of socio-economic impact poses investigators with much difficulties in selecting the most appropriate approaches because the process often involves various stakeholders, directly and indirectly. Moreover, the analyses and interpretation of the results also pose a great challenge. The present study monitored fisheries and tourism numbers which were considered as major local socio-economic indicators of living and production environment affected by M/T Hebei Spirit oil-spill accident. This monitoring was conducted by examining the published papers and statistical reports. This was supplemented by surveying how the local residents actually felt about the damage and recovery for the first time in Korea. The results showed that the rate of the recovery was about 40~50 %, and the rate of the recovery seemed to be slowed or decreased. However, what the local residents actually felt was 2~10 points less than the literature surveys and statistical reports. These results suggested limits to using only the literature and statistical surveys for the traditional socio-economic impact assessment. The study also showed the need to include in the impact assessment process what and how the local residents actual feel about the oil spill damage and recovery process.
An integrated EIA tool was developed to analyze present and future environmental quality status of Youngwol Basin using ArcView and FEMWASP. All the input data and computational results were prepared and graphically displayed on the basis of ArcView. FEMWASP and ArcView were integrated using the command "system.execute" in script of Avenue. Modeling items were inserted in the GUI of ArcView. The modeling result showed that the water quality of the proposed Yougwol Lake would be at the stage of eutrophication. The developed system can be applied to the water quality management of drinking water resources to set up the regulatory acts and project plan of governmental policy.
Journal of the Korean Society of Environmental Restoration Technology
/
v.14
no.5
/
pp.113-125
/
2011
Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.
The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.
Noh, Jin Won;Yoo, Ki Bong;Lee, Yea Jin;Yoo, Sol;Kim, Seong Ryeol
Korea Journal of Hospital Management
/
v.22
no.4
/
pp.16-23
/
2017
Purposes: Despite the positive health effects of both smokers and non-smokers, the non-smoking area policy is being negatively evaluated because of the vague fears of declining restaurant sales. The purpose of this study is to analyze the changes in sales of general restaurants(including liquor stores) and other restaurants that are considered to have the most applications of smoking cessation policy among the smoking facilities, and to examine the economic impact of the designation and expansion policies of non-smoking areas. Methodology: This study used the wholesale and retail trade survey data of the Korea National Statistical Office from 2011 to 2014 and analyzed 31,577 restaurants excluding missing values. For statistical analysis, t-test, ANOVA and Difference-in-differences(DID) models were used and the interaction term of area and year was entered. Findings: As the non-smoking area policy had been designated and expanded from December 2012 to December 31 2013, high restaurant sales in 2012 declined sharply in 2013. However, despite the expanding of the no-smoking area from January 1 2014 through December 31 2014, restaurant sales slightly recovered in 2014. In the case of other restaurants, there is no significant change in sales since the start of the policy in 2013. Practical Implications: The decline in restaurant sales due to the designation and expansion of non-smoking areas is temporary and can not be sustained over the long term. This result can be used to positively suggest negative perceptions of the designation and expansion policy of non-smoking areas. Also, this result can contribute to health promotion and smoking cessation policies by protecting non-smokers from the risk of secondhand smoking exposure and inducing smokers to decrease smoking rate and smoking amount.
Kim, Im-Soon;Kim, Yoon-Shin;Seo, Yong-Seok;Chang, Sung-Oun;Choi, Won-Wook;Han, Sang-Wook
Journal of Environmental Impact Assessment
/
v.12
no.3
/
pp.171-188
/
2003
Environmental Impact Assessment(ElA) in Korea has been used to improve environmental conservation and decision-making since environmental impact statement(EIS) was introduced in 1981 with the promulgation of the Environmental Preservation Act in 1977. which replaoed the Pollution Control Act legislated in 1%3. Together with a rapid growth of environmental perception as well as the diversification of development activities, however, it has recently bring about a strong demand for a new assessment process related to the strategic level of policies, plan, programs. In order to overcome such a limit in ElA system, Prior Environmental Review System(PERS) was introduced for assessment of administrative plans mainly concerned with development projects in 1993. In 1999. the regulations for PERS have been established by an amendment of the Basic Environmental Policy Act.Therefore the foundation of EIA system to integrate environmental concerns in planning processes and project works has been refonned. However the results of the execution of PERS were somewhat insuffident due to the institutional and technical matters. As the world's attention turns to sustainability and the considerations of cumulative effects, the concept of strategic envirorunental assessment(SEA) has taken on more significance and urgency and increasing number of countries and international organizations now undertake some form of SEA. The term SEA, however, is variously defined and understood, generally it means a formal process of systematic analysis of the envirorunental effects of development policies, plans, programmes and other proposed strategic actions. This process extends the aims and principles of EIA upstream in the decision-making process, beyond the project level and when major alternatives are still open. In this paper, we are discussing the significance of SEA and its relevance to EIA and the international trends and institutionalization of SEA. In conclusion we are discussing the comprehensive developing plan for SEA in Korea, then proposing a plan to make institutional arrangements for its application.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.