• Title/Summary/Keyword: Policy impact assessment

Search Result 387, Processing Time 0.032 seconds

Socio-economic and Environmental Impact Assessment in Agricultural Cultivation, Case Studies in Rice Cultivation and Shrimp Farming in the Mekong River Delta, Vietnam

  • Nguyen, Tran Nhan Tanh;Tran, Thi Hong Ngoc
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.6
    • /
    • pp.461-467
    • /
    • 2009
  • This paper provides two case studies of environmental impacts with socio-economic values. The first case is on flood protection levees conducted from 2003 to 2004 in Phu Tan district, An Giang province. The impacts were found by comparing full flood protection levees area (FFPL) to non-full flood protection levees area (NFFPL). Participatory Rural Appraisal (PRA) tools per each group of rich, middle, and poor people were used to list the impacts. Then, major impacts were selected by ranking and interviewing 60 households per site, and assessed by Cost Benefit Analysis (CBA) in rice production from 1996 to 2002 between two areas. The tested research indicated moving system of NFFPL to that of FFPL lost about 11 million VND/ha/year. The second case is on impacts of Penaeid shrimp farming conducted in Duyen Hai District, Tra Vinh Province in 2004-2005. Ninety households and 12 local officials were interviewed. Four PRAs were conducted and 36 water samples were taken inside and outside shrimp pond to measure values of DO, COD, Fe total, TSS, N-$NO_3{^-}$, N-$NH_4{^+}$, P-$PO{_4}^{3-}$, and Chlorophyll-a. Research results showed only 36.7% of the households got profit from shrimp farming. Highest financial efficiency was 0.72 for the semi-intensive system. Tested water indicators showed surface water quality did not match Vietnamese standard for surface water in coastal area (TCVN 5943-1995) and in rain. The water was very muddy and contaminated by organic aluminum. Summarily, the impacts were clarified more obviously via adding socio-economic values to assessment. Importantly, the values were transformed to household's income which is an indicator for policy-makers to consider the impacts obviously. Besides, data of different group of people impacted are cases contributing to consideration of the impacts in an appropriate social level.

Analysis of Biotope Area Ratio in the Environmental Impact Statements (환경영향평가서에 나타난 개발사업의 생태면적률 검토 연구)

  • Lee, Sang-Don
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.4
    • /
    • pp.394-401
    • /
    • 2018
  • Tendency in ratio of biotope area of environmental impact assessment (EIA) according to population, location, project type, and total project area was analyzed by type of the projects. According to EIA, biotope area ratio is the ratio of the weighted biotope areas and total project area. biotope area is important to resident's health and quality of their life. Ministry of Environment recommends to meet the biotope area ratio standard presented by each project type. The analysis is based on 4 types of project, urban development, industrial comlpex deveopment, tourism development, and waste and sewerage treatment facility, and 55 data extracted from them. It is needed that new standard that the population is reflected, adjustment that region and frequency are considered, and regulation strengthening according to achievement of 'the minimum achievable goals' to improve biotope area policy. The research includes more data and improvements of specific system are needed as a further research.

Social Impact Assessment of Introduction of Best Available Technology in Marine Industrial Facilities (해양산업시설 적용 가능한 최적기술 도입의 사회영향평가)

  • Wonsoo Kang;Moonjin Lee;Hoon Choi;Kyewon Kim;Youngkyu Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.2
    • /
    • pp.106-117
    • /
    • 2023
  • The social impact of hazardous and noxious substances from marine industrial facilities was evaluated, and implications for the application of social impact assessment items and methods required in the process of setting technology-based effluent limitations were derived. The scope of the study was based on marine industrial facilities in Incheon Metropolitan City. The analysis results are as follows. First, the impact on companies and industries was evaluated as "great," but large companies had little impact on operating profit losses, bankruptcy possibilities, and employment losses, while small and medium-sized companies had a large impact. Second, the impact on the community and economy was evaluated as "less," but it is judged that careful policy intervention is needed because the impact of fishing producers, local tourism workers, and the region can be concentrated and large. Third, it is judged that items and methods for calculating social loss costs and social benefits can be usefully applied in the method of setting technology-based effluent limitations.

A Study of Useability of Ecosystem Service Assessment on Strategic Environmental Assessment (전략환경영향평가 시 생태계서비스 평가 결과의 활용가능성에 관한 연구)

  • Park, Yoon-Sun;Kim, Choong-Ki;Lee, Who-Seung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.115-126
    • /
    • 2021
  • Strategic Environmental Impact Assessment (SEA) is a decision-making process taking into account the environmental impact, economic and social impact of policies, plans, and programs at the higher stage prior to the project plan for promoting sustainable development. In this study, we analyzed the process and criteria for selecting appropriate alternatives when establishing development plan in SEA. First, the criteria for estimating changes in ecosystem services following the implementation of development project of industrial complex were presented. Second, alternative evaluations were conducted through an analysis of ecosystem service scenarios to explore suitable alternatives in Anseong. As a result, the environmental quality of selected area as the existing project site deteriorated according to the implementation of the project, and the dimensional reduction technique confirmed that the change in ecosystem service factors in project area was the optimal location. In addition, the results of the scenario assessment to explore suitable alternatives in Anseong City showed that the existing site had large capacity in terms of water quality control services (scenario 1), scenario 2 in terms of preconditioning services, and scenario 3 in terms of water supply services. The guidance of Ecosystem service assessment is expected to be available in decision-making of large-scale strategies (e.g., SEA) and projects by presenting more quantitative criteria for determining the adequacy and location feasibility of development plans and policy plans. This is expected to require various support, including legislation and revision of related laws, believed to be supported by advanced research.

Analysis on Impact and Recovery Effectiveness of Hebei Sprit Oil Spill Accident for Living and Production Environment (허베이 스피리트호 유류유출 사고에 따른 생활 및 생산환경에 대한 영향 및 복원체감연구)

  • Lee, Moon-Suk;Kwon, Suk-Jae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.1
    • /
    • pp.1-6
    • /
    • 2011
  • The underlying principle of environmental conservation and restoration is to receive continuous services from nature. In this context, the basic objective of oil spill response and recovery activities is to allow affected residents to retain sustainability of their daily livelihood and productive environment. Hence, monitoring the status of socio-economic impact and the extent of restoration is an important parameter in the restoration effort to repair the damaged functions of environmental services with oil spill accident. However, assessment of socio-economic impact poses investigators with much difficulties in selecting the most appropriate approaches because the process often involves various stakeholders, directly and indirectly. Moreover, the analyses and interpretation of the results also pose a great challenge. The present study monitored fisheries and tourism numbers which were considered as major local socio-economic indicators of living and production environment affected by M/T Hebei Spirit oil-spill accident. This monitoring was conducted by examining the published papers and statistical reports. This was supplemented by surveying how the local residents actually felt about the damage and recovery for the first time in Korea. The results showed that the rate of the recovery was about 40~50 %, and the rate of the recovery seemed to be slowed or decreased. However, what the local residents actually felt was 2~10 points less than the literature surveys and statistical reports. These results suggested limits to using only the literature and statistical surveys for the traditional socio-economic impact assessment. The study also showed the need to include in the impact assessment process what and how the local residents actual feel about the oil spill damage and recovery process.

An Integrated Environmental Impact Assessment Model using FEMWASP and ArcView (FEMWASP 모형 및 ArcView를 결합한 통합적 환경영향평가 모형의 개발 및 적용)

  • Kim, Joon Hyun;Han, Young-Han;Choi, Yoon-Jung
    • Journal of Environmental Impact Assessment
    • /
    • v.7 no.2
    • /
    • pp.65-70
    • /
    • 1998
  • An integrated EIA tool was developed to analyze present and future environmental quality status of Youngwol Basin using ArcView and FEMWASP. All the input data and computational results were prepared and graphically displayed on the basis of ArcView. FEMWASP and ArcView were integrated using the command "system.execute" in script of Avenue. Modeling items were inserted in the GUI of ArcView. The modeling result showed that the water quality of the proposed Yougwol Lake would be at the stage of eutrophication. The developed system can be applied to the water quality management of drinking water resources to set up the regulatory acts and project plan of governmental policy.

  • PDF

Improvement of Biotope-Area-Ratio-Indicator and Appraisal System Applicable to Environmental Impact Assessment Projects (환경영향평가 대상사업에 적용가능한 생태면적률 지표 평가체계 개선)

  • Lee, Gwan-Gyu;Lee, Sang-Hyuk;Kim, Gyung-Ho;Lee, Jung-Hwan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.5
    • /
    • pp.113-125
    • /
    • 2011
  • Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.

A Study on the Plan for Advanced Noise-Policy in the 21st Century (21세기 소음정책 선진화 방안 고찰)

  • Yang, Geun-Ho;Park, Young-Min;Lee, Nae-Hyun;Chang, Yoon-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2009
  • The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.

Assessment of the Economic Impact of the Non-smoking Area Policy on Restaurant Sales (음식점 매출변화를 통해 살펴본 금연구역 정책의 경제적 영향 분석)

  • Noh, Jin Won;Yoo, Ki Bong;Lee, Yea Jin;Yoo, Sol;Kim, Seong Ryeol
    • Korea Journal of Hospital Management
    • /
    • v.22 no.4
    • /
    • pp.16-23
    • /
    • 2017
  • Purposes: Despite the positive health effects of both smokers and non-smokers, the non-smoking area policy is being negatively evaluated because of the vague fears of declining restaurant sales. The purpose of this study is to analyze the changes in sales of general restaurants(including liquor stores) and other restaurants that are considered to have the most applications of smoking cessation policy among the smoking facilities, and to examine the economic impact of the designation and expansion policies of non-smoking areas. Methodology: This study used the wholesale and retail trade survey data of the Korea National Statistical Office from 2011 to 2014 and analyzed 31,577 restaurants excluding missing values. For statistical analysis, t-test, ANOVA and Difference-in-differences(DID) models were used and the interaction term of area and year was entered. Findings: As the non-smoking area policy had been designated and expanded from December 2012 to December 31 2013, high restaurant sales in 2012 declined sharply in 2013. However, despite the expanding of the no-smoking area from January 1 2014 through December 31 2014, restaurant sales slightly recovered in 2014. In the case of other restaurants, there is no significant change in sales since the start of the policy in 2013. Practical Implications: The decline in restaurant sales due to the designation and expansion of non-smoking areas is temporary and can not be sustained over the long term. This result can be used to positively suggest negative perceptions of the designation and expansion policy of non-smoking areas. Also, this result can contribute to health promotion and smoking cessation policies by protecting non-smokers from the risk of secondhand smoking exposure and inducing smokers to decrease smoking rate and smoking amount.

The Study on the Institutional Trend and Introduction of SEA in Korea (전략환경평가의 제도화 동향과 국내 도입 방안)

  • Kim, Im-Soon;Kim, Yoon-Shin;Seo, Yong-Seok;Chang, Sung-Oun;Choi, Won-Wook;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.171-188
    • /
    • 2003
  • Environmental Impact Assessment(ElA) in Korea has been used to improve environmental conservation and decision-making since environmental impact statement(EIS) was introduced in 1981 with the promulgation of the Environmental Preservation Act in 1977. which replaoed the Pollution Control Act legislated in 1%3. Together with a rapid growth of environmental perception as well as the diversification of development activities, however, it has recently bring about a strong demand for a new assessment process related to the strategic level of policies, plan, programs. In order to overcome such a limit in ElA system, Prior Environmental Review System(PERS) was introduced for assessment of administrative plans mainly concerned with development projects in 1993. In 1999. the regulations for PERS have been established by an amendment of the Basic Environmental Policy Act.Therefore the foundation of EIA system to integrate environmental concerns in planning processes and project works has been refonned. However the results of the execution of PERS were somewhat insuffident due to the institutional and technical matters. As the world's attention turns to sustainability and the considerations of cumulative effects, the concept of strategic envirorunental assessment(SEA) has taken on more significance and urgency and increasing number of countries and international organizations now undertake some form of SEA. The term SEA, however, is variously defined and understood, generally it means a formal process of systematic analysis of the envirorunental effects of development policies, plans, programmes and other proposed strategic actions. This process extends the aims and principles of EIA upstream in the decision-making process, beyond the project level and when major alternatives are still open. In this paper, we are discussing the significance of SEA and its relevance to EIA and the international trends and institutionalization of SEA. In conclusion we are discussing the comprehensive developing plan for SEA in Korea, then proposing a plan to make institutional arrangements for its application.