• 제목/요약/키워드: Platform screen door

검색결과 107건 처리시간 0.03초

승강장 스크린 도어(PSD)시스템의 구조 안정성 평가 (Evaluation of the Structural Stability of Platform Screen Door(PSD))

  • 이재열;류봉조;전재선;김동현;이은규;신광복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1190-1197
    • /
    • 2006
  • We have evaluated the structural stability of a platform screen door due to train wind pressure. The platform screen door was installed at the ground and underground station and had 65 meters in length. Also, the platform screen door was a safety device because it was placed between the train and the platform. The finite element analysis was used to calculate the stresses and deflections of platform screen door caused by wind pressure using ANSYS 10.0. Quasi-static analysis was introduced to save calculating time and check quickly structural performances when compared to those of transient analysis. The results show that structural stability of the platform screen door under train wind pressure is proven and quasi-static analysis can quickly check the structural integrity of platform screen door.

  • PDF

지하철 역사 승강장의 스크린도어 도입에 관한 연구 (The Study of Introducing the Screen Door in Subway Station)

  • 김상운;성기창;강병근
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제10권2호
    • /
    • pp.51-58
    • /
    • 2004
  • In this paper, the problem of subway platform is analyzed and the alternative as a screen door is suggested. This paper aims to improve the facility law in subway platform. Because facility law related to platform is absent, the study scope is limited to detail design that is matched to rules. Field survey is performed to 300 persons that are 150 men and 150 women in Shingil station in which the screen door is established. Also the persons are used the screen door at least 3 times. It makes the field survey credible. The study is proceeded as follows ; First, the law related to platform, the problem of platform, and the plan and status of screen door are analyzed. Second, the definition, and composition of screen door are examined. Then, kinds of screen door is analyzed and the advantage and disadvantage of each kind of screen door are compared. Third, the necessity of establishing the screen door is examined through field survey and error range of stop position is investigated. Through this flow, final results is abstracted. Direction of facility related to subway platform, applied objective and range are suggested based on this study. This study focuses the stability of platform, pleasantness, and energy saving and suggests facility improvement direction through introducing the screen door and further study.

  • PDF

열차 진입 시 풍압에 의한 완전 밀폐형 승강장 스크린 도어(PSD)시스템의 구조 안정성 평가 (Evaluation of the Structural Stability of Platform Screen Door (PSD) due to Train Wind Pressure)

  • 이재열;류봉조;김동현;이은규;신광복
    • 한국철도학회논문집
    • /
    • 제9권5호
    • /
    • pp.594-600
    • /
    • 2006
  • In this study, transient and quasi-static analysis were done for the evaluation of structural integrity of the platform screen door due to train wind pressure. Fluent 6.0 was used to calculate the train wind pressure, and Ansys 10.0 was used to evaluate the structural stability of platform screen door due to train wind pressure. Transient analysis was used to check the design requirements of platform screen door, and quasi-static analysis was introduced to save the calculating time and check quickly structural performances when compared to those of transient analysis. The results show that structural stability of the platform screen door under train wind pressure is proven and quasi-static analysis can quickly check the structural integrity of platform screen door.

철도차량시스템과 PSD간 인터페이스 방안 및 적용 현황 (The Interface Scheme and Application Between Rolling Stock System and PSD)

  • 이종성;민영기;김경식;최종묵
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1510-1512
    • /
    • 2004
  • Platform Screen Door System is a facility on platform to separate platform from track, having automatic sliding door structures interlocked to opening and closing of train door with integrated control unit. When a train comes to a stop at a designed position at a station, onboard ATC/ATO system transmits train berth signal to wayside signaling system. In case of automatic/driverless operation, opening and closing of the Platform Screen Door will be controlled by wayside signaling system. Unfortunately, we often see the case in news that passengers fall into track and their contact with train lead to critical accidents. However, passengers will be free from such accidents on the platform with the Platform Screen Door System. Especially during the rush hours, to ensure passenger's safety and smooth getting on & off, it is necessary to arrange. some station staffs on the platform without the Platform Screen Door System. On the other hand, the Platform Screen Door System will realize such operation by fewer staffs. Due to the above reasons, the Platform Screen Door System is becoming more popular in subway system recently.

  • PDF

스크린도어가 설치된 지하철 승강장의 화재유동 전산 수치 모사를 이용한 스크린도어의 화재 영향 연구 (Effect of Platform Screen Door on fire in the subway station)

  • 장용준;정우성;박원희;김학범
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1337-1345
    • /
    • 2007
  • 본 연구는 플랫폼 스크린도어가 설치된 역사에서 화재시 스크린도어에 의한 효과와 화재에 대한 방재연구를 체계적으로 진행하기 위한 기초연구이다. 본문에는 스크린 도어의 종류와 특징에 대하여 기술하였다. 본 연구의 대상이 되는 스크린 도어에는 완전밀폐형이 설치된 역사를 대상으로 하였으며 승강장 종류는 섬식 승강장이다. 스크린 도어가 설치된 역사의 화재유동 전산수치모사에 화재전용 CFD code를 이용하여 수행하였다. 플랫폼 스크린도어의 영향을 분석하기 위하여 스크린도어가 설치된 경우와 설치되지 않은 경우를 해석 하였다. 또한 화원의 위치는 승강장과 선로부에 있는 경우로 나누었다. 화원의 성장시나리오는 Ultrafast model로 하였으며, 화원크기는 10MW로 하였다. 해석결과 플랫폼 스크린도어가 설치된 경우는 화원의 위치가 승강장에 있을 때 온도 및 연기의 전파가 주 탈출구인 계단에까지 4분 이내로 전파된다. 선로부에 있을 때는 스크린 도어에 의해 열, 연기 전파의 차단 효과가 있었다.

  • PDF

승강장 스크린 도어용 제어장치의 개발 (The Development of DCU for the Platform Screen Door)

  • 우천희;김진식
    • 전기학회논문지P
    • /
    • 제60권2호
    • /
    • pp.68-71
    • /
    • 2011
  • In the case of Seoul Metro, prior to installation of platform screen doors, had seen 4~6 cases a month of mortal injuries from accidents on the platforms, including suicide attempts towards the oncoming train. However, since the installation of platform screen doors, Seoul Metro has achieved a feat of '0 mortal injuries'. In the initial stages of introducing platform screen doors domestically, due to a lack of experience in controlling platform screen doors, the products were imported and installed through technical cooperations from Japan, France and the United States. Thereafter, following investments in technologies by domestic firms, domestic production of parts such as overall control mechanism, specific control mechanism, RF devices and others were achieved. However, having installed platform screen doors in a relatively short period of time, DCU(Door Control Unit), an integral part of the whole platform screen door system, is yet to be fully domestically produced. At this moment in time, installation is being done with imported products or DCUs developed with DC motors. In this research, advantages and disadvantages of DC and BLDC motors for use in DCU will be analyzed and will produce an own BLDC controlling unit in order to solve any problems arised. Furthermore, the BLDC controlling unit produced will be integrated with DCU to improve the performance of the product and its price competitiveness.

도시철도 환경개선 및 방재를 위한 스크린도어시스템 최적설계기술 개발 (Development of Optimum Design Technology of Platform Screen Door Systems for the Environment Improvement and Disaster Prevention of Urban Railway)

  • 김정엽
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.84-87
    • /
    • 2008
  • In order to maximize the effect of installing screen door system while to minimize the problems in an initial stage of introduction, it is strongly required to research an optimum installation solution in connection with ventilation and disaster prevention system alongside with safety structure analysis of screen door in respect to train-induced wind, as well as to develop the criteria for the operation after the installation. This paper presents the results of study to develop the optimum design technology in urban railway equipped with platform screen door systems.

  • PDF

스크린도어가 설치된 지하철에서 열차운행에 의한 비정상유동의 실험 및 수치적 해석 (Experimental and Numerical Analyses of Unsteady Tunnel Flow in Subway Equiped with Platform Screen Door System)

  • 김정엽;김광용
    • 설비공학논문집
    • /
    • 제18권2호
    • /
    • pp.103-111
    • /
    • 2006
  • To optimize the ventilation and smoke control systems in subway equipped with platform screen door, the technology to analyze the unsteady tunnel flow caused by running of train should be developed. The development of model experiment and numerical analysis technique with relation to unsteady flow of subway were presented. The pressure and air velocity changes in 1/20-scaling experiment unit were measured and results were comparied to those of 3-D unsteady numerical analysis applied with sharp interface method. The experimental and numerical results were quantitatively similar and it would be reasonable to apply sharp interface method to analyze the unsteady flow in subway equipped with platform screen door.

Study on Disaster Prevention in Case of Fire at Subway Platform with Platform Screen Door

  • Rie, Dong-Ho;Yoon, Sung-Wook;Ko, Jae-Woong;Lee, Keun-Oh
    • International Journal of Safety
    • /
    • 제4권2호
    • /
    • pp.36-42
    • /
    • 2005
  • A study on fire phenomena in a subway transit mass station has been carried out as a part of disaster prevention plan at the subway station. The ventilation facilities installed in both the platform and the trackway are designed to convert into a smoke exhaust system in emergency situation, creating an environment necessary for evacuation. 3 dimensional Numerical Simulations based on the CFD are carried out using a simulation tool, Fire Dynamic Simulator. Total of six different cases are made and performances are compared each other to find optimal vents operation to ensure safer environment for evacuation at the platform area considering the installation of platform screen door.

상대식 승강장에서 열차 운행에 의한 지하철 승강장 스크린 도어 풍압해석 (WIND PRESSURE TRANSIENTS ON PLATFORM SCREEN DOOR OF SIDE PLATFORMS IN A SUBWAY STAT10N CAUSED BY PASSING TRAINS)

  • 이명성;이상혁;허남건
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2007년도 춘계 학술대회논문집
    • /
    • pp.64-67
    • /
    • 2007
  • In the present study, the wind pressure transients on platform screen door in side platforms caused by passing trains have been investigated numerically. The transient compressible 3-D full Navier-Stokes solution is obtained with actual operational condition of subway train and the moving mesh technique is adopted considering the train movement. To achieve more accurate analysis, the entrance and exit tunnel of platform are included in a computational domain and detailed shape of train is also modeled Numerical analyses were conducted on five operational condition which are different velocity variation of subway train, existence of stationary train and passing each other trains. The results show that pressure load on platform screen door is maximized when the two trains are passing each other. It is also seen from the computational results that the maximum pressure variation was found to be satisfactory to various foreign standards.

  • PDF