• Title/Summary/Keyword: Plate girder bridge

Search Result 257, Processing Time 0.033 seconds

Vibrational Characteristics of the Deteriorated Railway Plate Girder Bridge by Full-scale Experimental Modal Analysis (Full-scale 실험 모드해석을 이용한 노후화된 철도판형교의 진동특성)

  • Kim, Joo-Woo;Jung, Hie-Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.1
    • /
    • pp.119-128
    • /
    • 2012
  • In this study, experimental vibration tests are performed on a real full-scale railway steel plate girder bridge, which resides in open-space environments. Using experimental modal analysis techniques, the modal parameters of the railway steel plate girder bridge yielded by the modal testing of the impact hammer are compared and investigated with the natural frequencies and mode shapes obtained by finite element analysis. This work focuses on the application of model updating techniques to measured experimental data and output-only data from an analytical vibration study that takes into account various geometric and material properties of the bridge members. A finite element model of the railway bridge structure is used to verify the modal experimental results. It is subsequently updated using the corresponding modal identification technique. The basic database is provided to evaluate damage, which can be determined based on the changes in the element properties, resulting from the process of updating the finite element model benchmark and experimental data.

Analysis of the Dynamic Behavior and Continuous Welded Rail of LRT Steel Bridge (경량전철 강교량에 대한 이동하중하 동적거동 및 장대레일 축력의 해석적 평가)

  • Seong Taek-Ryong;Kim Cheol-Hwan
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.564-571
    • /
    • 2005
  • Two-plate girder bridge and narrow steel box girder bridge are suggested for the steel wheel AGT system. For these bridge system, rail-bridge interaction analysis was carried out and dynamic behavior of these bridges was investigated. The result shows that all the estimated parameters satisfy the criteria concerned. As a result these two suggested bridge systems have enough performance to be competitive for the LRT elevated structures.

  • PDF

A Study of continuous PSC bridge with a reinforcement steel plate (보강강판을 이용한 연속 PSC 교량 공법에 관한 연구)

  • Koo Min-Se;Kim Hun-Hee;Jung Young-Do
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.422-429
    • /
    • 2005
  • It is limited to decrease height or section even by system conversion to indeterminate structure - continuous beam - in existing PSC girder bridges. In this study, the movement of connection is analyzed through actual field test, by increasing stiffness of negative moment area in continuous PSC bridge and developing continuous PSC bridge with embedded steel plate, that can overcome the demerit of existing connection. As a result, it is confirmed that the body unification of the connection is being realized and maintained. Moreover, the height of a span is suggested in continuous PSC girder bridge with embedded steel plate by computational analysis

  • PDF

Fatigue Assessment of Steel Railway Bridge by Service Loading about 65 Years

  • Hong, Sung-Wook;Chai, Won-Kyu;Lee, Myeong-Gu
    • International Journal of Safety
    • /
    • v.9 no.1
    • /
    • pp.12-20
    • /
    • 2010
  • In this study, a series of random field test and dynamic analysis in the time domain were carried out in order to find in the reason of fatigue damage of the main and the secondary members in the 3-span continuous steel plate girder railway bridge being under in service over 60 years. From the measured and the analyzed results, the stress distribution patterns were investigated for the members with fatigue damage. In addition, global and local numerical stress analysis was performed for the members damaged severely by corrosion, to estimate variation of the distribution by corrosion. Finally, a reasonable cut-off ratio in the steel plate railway bridge will be proposed by analyzing the equivalent stress ranges according the ratio.

Ultimate Strength Evaluation of Through Plate Girder Bridge Using Nonlinear Inelastic Analysis (비선형비탄성해석을 활용한 하로 판형교의 극한강도 평가)

  • Jeon, Shin-Youl;Tai-Huu, Thai;Kim, Seung-Eock
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1713-1718
    • /
    • 2010
  • An ultimate strength evaluation of the through plate girder bridge using nonlinear inelastic analysis is presented. In this method, separate member capacity checks after analysis are not required, because the stability and strength of the structural system and its component members can be rigorously treated in analysis. The method captures the inelastic redistribution of internal forces throughout a structural system, and allows an economic use of material for highly indeterminate steel bridges.

  • PDF

Field Test to Investigate Dynamic Characteristics of Steel Plate Girder Railway Bridges without Ballast (무도상 판형교의 동적거동특성 분석을 위한 실험적 연구)

  • 최진유;오지택;김현민;이상배
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.678-683
    • /
    • 2002
  • Field measurements were conducted to analysis dynamic characteristics of existing steel plate girder railway bridges without ballast. Three bridges which have 9m, 12m, 18m span length in Kyoung-Bu and Ho-Nam Line were selected for test. According to the each bridge, dynamic vertical deflections and vertical and horizontal accelerations were measured. Natural frequencies, vertical deflections and accelerations obtained from field tests were compared with the limit value specified in the UC, Japanese and Korean railway bridge specification.

  • PDF

After-fracture redundancy in simple span two-girder steel bridge

  • Park, Yong-Myung;Joe, Woom-Do-Ji;Hwang, Min-Oh;Yoon, Tae-Yang
    • Structural Engineering and Mechanics
    • /
    • v.27 no.6
    • /
    • pp.651-670
    • /
    • 2007
  • An experimental study to evaluate a redundancy capacity in simple span two plate-girder bridges, which are generally classified as a non-redundant load path structure, has been performed under the condition that one of the two girders is seriously damaged. The bottom lateral bracing was selected as an experimental parameter and two 1/5-scale bridge specimens with and without bottom lateral bracing have been prepared. The loading tests were first performed on the intact specimens without cracked girder within elastic range. Thereafter, the ultimate loading tests were conducted on the damaged specimens with an induced crack at the center of a girder. The test results showed that the cross beams and concrete deck redistributed partly the applied load to the uncracked girder, but the lateral bracing system played a significant role of the load redistribution when a girder was damaged. The redundancy was evaluated based on the test results and an appropriate redundancy level was evaluated when the lateral bracing was provided in a seriously damaged simple span two-girder steel bridge.

Dynamic Performance Enhancement of the Railway Plate Girder Bridge using the In-site Continuous Method (현장 연속화 기법을 통한 철도판형교의 동적성능향상)

  • Oh, Ji-Taek;Kim, Hyun-Min
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.774-782
    • /
    • 2011
  • In-site Continuous Method to improve the dynamic performance of railway plater girder bridge was developed. In this study, the In-site Continuous Method in the existing railway plate girder bridge was applied. Comparison of the results obtained from the field experiment were presented. The reductions in vertical acceleration were shown to approximately 24.8%, 45.4% and 27.5% in case of the freight train, passenger train and express tilting train, respectively. The reductions of lateral acceleration were shown to approx. 31%, 39% and 15% in the previous case. In the vertical displacement, the reductions were shown to approx. 20%, 13% and 12.6%, respectively. Through this method, we expect the problem of the restriction in speed up of train to be solve.

  • PDF

A Case study on Effect of Compositeness for Temporary Bridge Integrated Lining Board and Girder (복공판과 주형을 일체화한 가설교량에 대한 합성효과 검토 사례연구)

  • Yoon, Woo-Hyun;Chung, Jee-Seung;Lee, Jong-Soon;Yoon, Yong-Seok;Yang, Sung-Don
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.2
    • /
    • pp.34-41
    • /
    • 2012
  • In this study, it has been proposed the new type of temporary bridge which is structural performance maximization to integrated cover plate and girder as well as roll of lining board. Of all temporary bridge integrated cover plate and main girder in the form of a new type of structure is advantageous for the judge, but to the field of transport difficulties and challenges due to high altitude operations to take advantage of this challenge and deliver a structured, easy transport, and the synthesis of lining board possible was proposed. Lining board proposed in this study through experimental synthesis and analysis of the factors that influence the effectiveness of the construction and economic development in the construction method was superior, compared to the conventional lining board.

Capacity evaluation of PC-slab composite actions for the railway steel plate girder according to an experimental construction (PC-Slab 합성 철도판형교 유도상화 시험부설에 따른 성능 비교평가)

  • Min, Kyung-Ju;Lee, Sung-Uk;Choi, Hyung-Soo;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.697-706
    • /
    • 2011
  • There are more than 800 railway steel plate girder bridges which are in use and the total length is approximately 50 km. Among these, it shall be pointed out that non-ballast rail systems which lay on wood sleepers are the most critical members. To strengthen this type of structures, mainly two methods have been applied. The first one is the most typical method which is to replace the girders with slab girder system or steel composite girders and to add ballast. It is not uncommon that the construction cost of substructure is more than ten time higher than that of superstructures and even in this case, the structural uncertainty for the substructures is not diminished. To resolve above mentioned problems, new method was developed to rehabilitate railway steel girder bridge by adding PC-slab using transport equipment. Using this method, substructure strengthen is rarely required because the additional weight to the bridge superstructure is only up to 1.0t/m. Also it was possible to save the construction cost by reducing construction duration and by simplifying the construction process. Experimental construction was performed for Jewon bridge and measurements were performed before and after construction to verify the bridge capacity.

  • PDF