• Title/Summary/Keyword: Plants construction work

Search Result 81, Processing Time 0.026 seconds

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

A Study on the Actual Condition Survey of Apartment Rebar Work (공동주택 철근공사의 실태조사에 관한 연구)

  • Lee, Taick-Oun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.71-79
    • /
    • 2008
  • The rebar work is very related to the safety and durability of the building. Recently, the rebar work is produced some serious problems due to the lack of skillful crafts-man and the rising cost of rebar materials. Many papers have dealt with the rebar work of the manufacturing system in plants with a view to improvement those problems. But, the research on the rebar work of the manufacturing system in field is in a insignificant condition. This study presents the following improvement schemes as a result. First, the education strengthening for evaluation on practical affairs, second, the reinforcement of drawing & management in shop drawing and finally the simplification of apartment rebar work in slab. Also, this paper aims at advancing apartment rebar work by the actual condition survey in slab work. The further research will be needed about the whole structure parts such as foundation, wall, girder and rebar truss-deck plate as one of the improvement methods.

Design on Slopes Revegetation and Tentative Instruction on Construction Work (비탈면 녹화 설계 및 시공 잠정 지침)

  • Jeon, Gi-Seong;Kim, Nam-Choon;Lee, Tae-Ock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.1
    • /
    • pp.100-113
    • /
    • 2007
  • In Korea, there has been no revegetation applicable standard for slopes formed by road construction work up to now, so revegetation work has been done using mostly foreign varieties in the manner of early revegetation. However, foreign varieties have some shortcomings; for example, they tend to be dried to death after construction work. Besides, due to the rift in the supporting soil, these revegetated varieties are often displaced from the slopes. Thus, the Ministry of Construction & Transportation on July, 2005 established revegetation standard on the slopes suited for the natural eco-system of Korea and organized positively recommending directions for using self-sewn plants growing near the slopes in overall consideration of soil, weather, regional conditions. The locations specified in this direction are the slopes at the road construction jobsite like the expressway, highways, and local roads. In addition, the Ministry's standard and directions stipulated that damaged slopes's natural environment and eco-system due to various road construction work should be restored, and thus a feeling of stability and pleasantness should be provided to road users as well. Also, the Ministry tried to select seed plants and revegetation measures suited for surrounding environment to put the environment-friendly slope revegetation measures into practice through the test revegetation work in order to prevent illegal construction practices and to improve the quality of revegetation. According to the direction, revegetation districts aimed at the slopes are divided into three ones in consideration of weather environment, regional environment, and forest environment as follows : national territory's core ecological green-land based district centering on the Taebaek Mountains; coastal ecosystem district including islands off the coast; inland eco-system district. The combination of revegetation plants according to environment revegetation districts, should be executed by dividing into herb-oriented type, woody plant colony type, and bio-species versatility restoration type, and the selection of seeding plants should be done in the presence of a supervisor and through test construction results and technology counseling from a specialist in natural eco-system restoration and revegetation measure seed combination standard according to environment revegetation districts. This direction will be executed in the manner of monitoring until the yea 2008 and 2009 it will be finalized and enforced on December, 2009.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

A Study on the Integrated Management System for Rebar Information in Building Construction (건설공사 철근정보관리 개선방안에 관한 연구)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

Assessment of risk of unit work in nuclear power plant construction using AHP (AHP를 이용한 원자력발전소 건설공사의 단위작업 위험도 평가)

  • Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.62-67
    • /
    • 2014
  • The purpose of this study is to analyze the degree of risk of the working unit of nuclear power plants construction. In order to do this, and the risk index by type and source of risk judgment derived in the previous study were utilized. Further, to derive a risk index of unit work in nuclear power plant construction, a survey targeting safety professionals was conducted. The analytic hierarchy process (AHP) was used for analysis of the survey. The following results were obtained. Firstly, the results of AHP showed that main building work is the most dangerous work, and base excavation work is the second dangerous work among 21 unit works. Secondly, so, it is required to invest more and to take a increasing interest in unit works of civil and architecture as compared to other unit works. Further, the results could be used to reduce the degree of risk in construction of the nuclear power plant.

Analysis of Factor Affecting for Improving Construction Engineering Market

  • Park, Junho;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.450-453
    • /
    • 2015
  • The Construction Engineering Industry (CEI) is construction field based on professional knowledge, staff and information service, and is distinguished by construction activity. The contemporary CEI market has extended globally and diversified construction work classifications. International construction engineering companies now have an important economic and social effect. Over the last five years (2009 to 2013), the top-200 global engineering firms reported global revenue that grew from 54.4 billion to 71.5 billion, about 27% growth (ENR, 2014). Countries such as the U.S.A., Canada, those in Europe (Several developed countries, i.e., United Kingdom, Netherlands, France, Spain, France, Italy, and Spain), Australia, Japan, China, and Korea comprise the bulk of world construction engineering revenue. Although the construction engineering market continues to grow, much of the work is limited to Europe, mid-Asia, and Asia. Additionally, specific construction types are focused on building projects, industrial plants, and refining plants. As such, there are imbalances in the construction engineering market and some market saturation. Further, there is heavy competition and the construction engineering market may shrink in the future. This paper analyzed various factors affecting the construction engineering market, specifically looking at construction classifications and factors related to a global market. To accomplish this, we collected to data from Engineering News Record (ENR) and recast each variable. And we used nonparametric statistics because the number of cases were small, making it difficult to assume a case's population parameter. Then we tested with the Kruskal-Wallis test and drew results. The results indicate that concentration in particular construction types and extending global regional markets will be have a positive effect on the overall global construction engineering market..

  • PDF

Use of Arundinaria munsuensis Y. Lee as Revegetation Plant Materials of Damaged Slopes (훼손지 비탈면 녹화용 식물소재로의 문수조릿대의 적용성 연구)

  • Jang, Hyung-Tae;Park, Won-Je;Kim, Nam-Choon;Park, Jong-Min
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.1
    • /
    • pp.133-140
    • /
    • 2012
  • The study of Arundinaria munsuensis Y. Lee to this day was limited to the field of morphological species classification since its first discovery at Jiri mountain in the late 1990s. This native plants, one of Korean endemic species found in Jiri Mt. necessitates further studies about its use as revegetation plants or groundcover plants in urban areas. This study was launched from this need followed by summaries of results below related to its usage. This targeted species is a native Korean species which its natural distribution on the subalpine zone has merit for the wide range of climatic adaptation. Also, the coverage rate reached 78.3% in three years mostly by rhizome growth with an expectation of full coverage in four years providing less maintenance needs after planting. The net price for the construction of pot seedling methods of this plants is relatively economical than other normal revegetation construction methods. For these reasons, drilling for the plants on cut and fill soil slopes driven from pot seedling adapts Arundinaria munsuensis Y. Lee as efficient revegetation plant. Total construction cost for pot seedling work($30cm{\times}30cm$) of Arundinaria munsuensis was approximately 21,000won which is in reasonable price range when compared to other revegetation construction methods of disturbed slopes. As a native Korean plant, Arundinaria munsuensis has wide range of climatic adaptation with less maintenance requirement after planting. This study may suggest a strong possibility of Arundinaria munsuensis as a pot planting material in sloped area.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.