• 제목/요약/키워드: Plant construction

검색결과 2,239건 처리시간 0.03초

A Presentation of a Cost Classification System for Gas Plant Construction Projects

  • Park, Moonsun;Kim, Yongsu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.625-626
    • /
    • 2015
  • The purpose of this study is to present a cost classification system that can be used in gas plant construction projects. Towards this end, it examined the detailed statements of the construction companies which had experience in carrying out plant construction projects. Based on the above, it also presented a life-cycle (i.e., EPCC) cost classification system for the gas plant construction projects by conducting the Delphi analysis through the expert opinions.

  • PDF

화학 사고 예방을 위한 Plant 건설 종사자의 Tool Box Meeting이 재해예방행동에 미치는 영향 (Effect of Tool Box Meeting of Plant Construction Workers on Disaster Prevention Behavior for Chemical Accident Prevention)

  • 오일환;김상길;조규선
    • 산업진흥연구
    • /
    • 제8권4호
    • /
    • pp.47-60
    • /
    • 2023
  • 본 연구의 목적은 건설종사자의 TBM을 통한 건강신념요인이 재해예방행동에 미치는 영향에서 자기효능감과 안전의식의 매개효과를 파악하고자 하였다. 이를 위해 건강 관련 행동을 예측하고 설명하기 위해 개발된 사회심리학적 건강 행동 변화 모델인 건강신념이론의 주요 변수들을 적용한 연구모형을 제시하였다. 본 연구의 연구모형을 실증적으로 검증하기 위해 화학 Plant 건설 TBM을 활용한 경험이 있는 건설종사자들을 대상으로 설문 조사를 하였다. 연구결과 첫째, 화학 Plant 건설을 활용한 건설종사자의 지각된 심각성은 자기효능감과 안전의식에 유의미한 영향을 미치는 것으로 나타났다. 둘째, 화학 Plant 건설을 활용한 건설종사자의 지각된 개연성은 자기효능감과 안전의식에 유의미한 영향을 미치는 것으로 나타났다. 셋째, 화학 Plant 건설을 활용한 건설종사자의 지각된 장애는 자기효능감과 안전의식에 유의미한 영향을 미치는 것으로 나타났다. 넷째, 화학 Plant 건설을 활용한 건설종사자의 지각된 이익은 자기효능감과 안전의식에 유의미한 영향을 미치는 것으로 나타났다. 본 연구의 목적은 TBM을 통해 화학 Plant 건설종사자의 재해예방행동으로 중대 재해를 감소시키고자 한다.

LNG 플랜트 공사의 PMIS 개발방향에 관한 기초연구 (A study on the development direction for PMIS in LNG plant construction)

  • 한재구;진경호;박환표
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.298-300
    • /
    • 2013
  • Depending on the very large and complicated of the LNG plant project, for the successful execution of the project, the operating system that is seamlessly integrated in EPC phase is needed. Therefore, we surveyed and analyzed the PMIS development and application status in domestic and international plant construction. Based on the results of the research, we proposed the development direction for PMIS in LNG plant construction.

  • PDF

원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델 (Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant)

  • 신대웅;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

해외 발전소 건설의 효율화를 위한 표준분류체계 상위구조 (Outline of Standard Classifications for International Power Plant Construction)

  • 강미연;하지원;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.184-185
    • /
    • 2014
  • International construction contracts to Korean construction companies have been dramatically increased over the 48 years (Contract received worth 65.2 billion dollars in 2013). Especially, the plant construction sector has achieved about 61% among the 65.2 billion dollars. Under this trend, in order to ensure plant construction's competitiveness, 'standard classification' is an important area for systematic management. However, these standards in the plant construction are not widely utilized yet, in comparison with civil and building sectors. Therefore, in this research, a higher level of standard classifications is proposed for various types of power plants from a PMO's (Project Management Office) perspective. This study also provides a comparative analysis outlining different features and common components based on various types of power plants.

  • PDF

플랜트 유틸리티 시공에서 리스크 관리에 관한 연구 (On the Analysis of Risk Management for a Utility Construction Work in Plant Projects)

  • 한기돈;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

플랜트 및 건설수출 입찰의 성공 및 실패모델에 관한 연구 (A Study on the Regression Models of Success and Failure of Tenders for Plant and Construction Exports)

  • 유규열
    • 한국국방경영분석학회지
    • /
    • 제29권1호
    • /
    • pp.88-111
    • /
    • 2003
  • This paper is to suggest strategic options for improving the export performance of the plant and construction industry. The overall objective of this study is to explore the feasibility of a sustained export performance in the plant and overseas construction industry by an analysis of its international competitiveness and technological competence. The empirical work of this study relates to a chosen sample of Korean and non-Korean firms in the plant and construction industry sector. Primary data was collected through a comprehensive questionnaire survey administered to plant and construction firms in twelve countries, including Korea. The actual number of firms for which full information at a sufficient level of disaggregation was obtained was 62, a response rate of 44.6%. Of these, 42 firms were drawn from Korean plant and construction firms and the remaining 20 firms from 11 other countries. The structure of responding firms by industry shows a total of 29 plant exporters and 33 construction firms. Data analysis was carried out using SPSS statistical technique such as Multiple Regression in order to examine the linear relationship among variables. The findings of the study indicate that export success and failure in plant and construction export markets is determined by firm size and by various qualitative variables. The high export volume (export success) of Plant and construction exporters is more strongly influenced by mutual economic cooperation and number of employees than by sales volume and competent knowledge of the plant and construction markets. It was also found that weak political and diplomatic relation between countries, low sales volume and lack of bid experience have an adverse effect and represent serious barriers to exports.

플랜트 건설공사의 벤더관리 발전방향 기초연구 (A study on the development direction for vendor management in plant construction)

  • 박환표;한재구;진경호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.189-190
    • /
    • 2011
  • The purpose of this study is to suggest the development direction for vendor management in plant construction. Therefore this research has proposed the integration management of vendor and information standardization. This research has proposed that plant industry association manage the basic information of vendor. And each company manage the performance evaluation of vendor's firm. Expecially, vendor management system should be developed by ISO information system.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF