• Title/Summary/Keyword: Plant Scheduling

Search Result 105, Processing Time 0.029 seconds

Fuzzy Estimator for Gain Scheduling and its Application to Magnetic Suspension

  • Lee, S.H.;J.T. Lim
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.382-382
    • /
    • 2000
  • The external force disturbance is the one of the main causes that deteriorate the performance of the magnetic suspension. Thus, this paper develops a fuzzy estimator for gain scheduling control of magnetic suspension systems suffering from the unknown disturbance. The proposed fuzzy estimator computes the disturbance injected to the plant and the gain scheduled controller generates the corresponding stabilizing control input associated with the estimated disturbance. In the simulation results we confirm the novelty of the proposed control scheme comparing with the other method using a feedback linearization.

  • PDF

DEVELOPMENT OF TRANSPLANT PRODUCTION IN CLOSED SYSTEM (PART II) - Irrigation Scheduling based on Evapotranspiration Rate-

  • Tateishi, M.;Murase, H.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2000.11c
    • /
    • pp.764-769
    • /
    • 2000
  • A new transplant production system that produces high quality plug seedlings of specific crop has been studied. It is a plant factory designed to produce massive amount of virus free seedlings. The design concept for building this plant factory is to realize maximum energy efficiency and minimum initial investment and running cost. The basic production strategy is the sitespecific management. In this case, the management of the growth of individual plantlet is considered. This requires highly automated and information intensive production system in a closed aseptic environment the sterilized specific crops. One of the key components of this sophisticated system is the irrigation system. The conditions that this irrigation system has to satisfy are: 1. to perform the site specific crop management in irrigation and 2. to meet the no waste standard. The objective of this study is to develop an irrigation scheduling that can implement the no waste standard.

  • PDF

A Work Scheduling Based on Analysis of Performance Data (실적자료분석(實績資料分析)에 의(依)한 일정계획(日程計劃))

  • Kim, Dong-Chan;Kim, U-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.4 no.2
    • /
    • pp.59-66
    • /
    • 1978
  • This paper is a work scheduling for design of piping Department of chemical plant using accumulated curve. Accumulated curve prepared by analysis of performance data, collected executed manhours for chemical plant of "D" Company during the past two years. It compared scheduled manhours with actual used manhours up to six months, put into the form of figures and charts the results can he summarized as below; 1) It can he found an important factor of critical control thus piping department got 30% of total scheduled menhours. 2) A plan of manpower mobilization can be scheduled before work starting. 3) Project progress can he found easily as put into the form of figures and charts for schedule to actual.

  • PDF

A Daily Optimal Operation Scheduling of Total Cogeneration System Operating by Combined Heat Power Plant and District Heat Devices (복합화력발전설비와 지역난방설비가 연계된 종합열병합발전시스템의 일간 최적운전계획 수립)

  • Jung, Ji-Hoon;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.183-186
    • /
    • 2001
  • This paper describes the optimal operation scheduling of total cogeneration system which is interconnected with combined heat power plant of utility and district heat devices. The numerical modeling about the cogeneration system and the auxiliary thermal energy devices are established and simulation is carried out by LINDO program in order to minimize the operation cost under the national viewpoint. The results reveal that the established numerical modeling and the operation strategy can be effectively applied to the total cogeneration systems to reduce the energy cost.

  • PDF

The multi-objective planning for minimizing tardiness and maximizing resource utilization in a multi-plant supply chain (다중플랜트 생산 공급망 계획에서 납기지연 최소화 및 자원이용 최대화를 위한 다목적 계획)

  • 한만형;문치웅;김종수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.269-272
    • /
    • 2001
  • In this paper, we presents a systematic methodology for minimizing tardiness and maximizing resource utilization in a multi-plant supply chain. A methodology is represented to a multi-objective mathematical program model. The model offers flexible and efficient multi-plant planning and scheduling. Also, We develope a realistic and flexible planning model using the genetic algorithm to solve the model.

  • PDF

Mathematical Modeling of Scheduling Problems for the Fusion Fuel Cycle (핵융합 공정주기에서의 생산 계획 최적화)

  • Lee, Suh-Young;Ha, Jin-Kuk;Lee, In-Beum;Lee, Euy Soo
    • Korean Chemical Engineering Research
    • /
    • v.58 no.4
    • /
    • pp.596-603
    • /
    • 2020
  • In this study, a mathematical model for optimal operation of the fusion fuel cycle is developed based on scheduling approach. The fusion fuel cycle consists of a system for storing and supplying deuterium and tritium, and receiving and separating process after the fusion reaction. Except that tritium is a radioactive material, most of these processes consist of catalytic reactions and separation process. For these reasons, it is possible to apply scheduling approach which is also widely utilized to chemical plants to derive the optimal operating scenarios. The developed model determined the optimal regeneration cycle to minimize the amount of tritium inside the vacuum pumps. Based on the characteristics of various device in the fusion reactor, the optimal tritium plant operation scenario is evaluated. The formulated model was applied to the actual tokamak scenario and utilized to analyze the fuel flow and balance of ITER fuel cycle.

A Study on the Weekly Operation planning of pumped Hydrostorage plant Considering Unit Commitment (기동정지계획을 고려한 제수발전소의 주간 운용에 관한 연구)

  • 송길영;홍상은;김영태
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.5
    • /
    • pp.319-327
    • /
    • 1987
  • This paper presents a dynamic programming sucdessive approximation algorithm for scheduling pumped storage hydro plants and shows how this method can be coordinated with the commitment of the thermal units of the system. The general object of operation of pumped hydrostorage plants is the minimization of the overall production cost and the maximization of generation reserves. The basic procedure used to obtain a combined pumped storage-unit commitment schedule is to execute the pumped storage scheduler and unit commitment scheduler iteratively. A combined DPSA algorithm has been presented to coordinate the scheduling of the pumped storage with the scheduling of the thermal units.

  • PDF

Fuzzy Estimator for Gain Scheduling and its Appliation to Magnetic Suspension

  • Lee, Seon-Ho;Lim, Jong-Tae
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.106-110
    • /
    • 2001
  • The external force disturbance is the one of the main causes that deteriorate the performance of the magnetic suspension. Thus, this paper develops a fuzzy estimator for gain scheduling control of magnetic suspension system suffering from the unknown disturbance. The propose fuzzy estimator computes the disturbance injected to the plant the gain scheduled controller generates the corresponding stabilizing control input associated with estimated disturbance. In the simulation results we confirm the novelty of the proposed control scheme comparing with the other method using a feedback linearization.

  • PDF

Scheduling of Tasks and Messages under Noise Environment (노이즈 환경 하에서 태스크와 메시지 스케줄링)

  • Kim, Hyoung-Yuk;Yoon, Gun;Park, Hong-Seong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.4
    • /
    • pp.377-384
    • /
    • 2004
  • Nowadays, control systems consist of smart sensors, smart actuators, and controllers connected via fieldbus. Some devices such as motors in plant environments generate high degrees of EMI or noise. This noise may cause communication errors and make the successful transmission of data longer. Therefore, the noise condition has to be considered at the design of a reliable control system based on a network. This paper presents a scheduling method of task and message to guarantee the given end-to-end constraints under noise environments. A noise model with multi-sources of noise is used, and the analysis method of message's response time is presented when the noise model is applied to CAN (Controller Area Network). Two kinds of noise models are applied to an example system, and the effect to each control loop s end-to-end response time is analyzed. We believe that the proposed method help system designers design the control system guaranteeing its requirements under noise environment.

Kalman Filtering with Optimally Scheduled Measurements in Bandwidth Limited Communication Media

  • Pasand, Mohammad Mahdi Share;Montazeri, Mohsen
    • ETRI Journal
    • /
    • v.39 no.1
    • /
    • pp.13-20
    • /
    • 2017
  • A method is proposed for scheduling sensor accesses to the shared network in a networked control system. The proposed method determines the access order in which the sensors are granted medium access through minimization of the state estimation error covariance. Solving the problem by evaluating the error covariance for each possible ordered set of sensors is not practical for large systems. Therefore, a convex optimization problem is proposed, which yields approximate yet acceptable results. A state estimator is designed for the augmented system resulting from the incorporation of the optimally chosen communication sequence in the plant dynamics. A car suspension system simulation is conducted to test the proposed method. The results show promising improvement in the state estimation performance by reducing the estimation error norm compared to round-robin scheduling.