Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project (플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Ji, Sang-Bok;Lee, Tae-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.66-76
    • /
    • 2008
  • Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.

The Introduction of Desalination Plant System (기획특집 - 해수담수화 플랜트 소개)

  • Cho, Maeng-Soo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.3
    • /
    • pp.27-31
    • /
    • 2009
  • Recent desalination plant system are being operated by applying one of the technologies as like MSF, MED and, or RO. The production cost of pure water from sea water by the desalination plant was U$9/m$^3$ in 1960, but now has been reduced to U$1/m$^3$ at present. The Power and Desalination Plant Project in Al Cobar of Saudi Arabia gave good chance to us export the similar plant systems actively to the world market. 1Hidd IWPP Project in Bahrain, Taweelah B Extension Project in Abu Dhabi of UAE and Ras Laffan B IWPP of Qatar are the recent large scale desalination projects under construction.

  • PDF

Plant Genetic Resources in Lam Dong province - Vietnam : Brief in medicine plants and wild orchids situation

  • Ket, Nguyen Van;Cho, Joon-Hyeong
    • Korean Journal of Plant Resources
    • /
    • v.22 no.6
    • /
    • pp.571-583
    • /
    • 2009
  • Lam Dong Province of Vietnam has an exceptional diversity of orchids and herbs. At least 920 herb species are widely mentioned in Vietnamese traditional medicinal literature and over 239 Lam Dong wild orchid species are used for attention under the Conservation Vietnamese wild orchids projects. In collaboration with Department of Plant Biotechnology, Dongguk University - South Korea working under supported ODA funds from Korea government (MIFAFF), we will consider how to collecting and preserving these plants in situ or conservating in vitro as a genetic resource.

A Study on the Gate Review of Small and Medium-Sized Plants (SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안)

  • Jin Il, Kim;Choong Sub, Yeum;Joong Uk, Shin;Sang Bae, Lee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

Productivity Obstacle Factors Analysis For The Overseas Chemical Plant Utilizing The Revised IPA (수정 IPA를 활용한 해외 화공플랜트 생산성 저해요인 분석)

  • Jeon, Woo-Geun;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.17-26
    • /
    • 2017
  • The total amount of overseas plant orders obtained by Korean construction companies in 2015 decreased by approximately 51% from the previous year. While a chemical plant sector has the highest portion of the plant orders by accounting for 63% of the plant industry, its orders also decreased by approximately 43% in the same year. Recently, plant construction companies in overseas projects have been dominating the engineering sector owing to their advanced technology, experience, and accumulated knowledge. Therefore, measures must be taken to secure the competitiveness of domestic companies in the global plant industry. Especially, productivity management is an important issue to strengthen the national competitiveness with the development of construction technology. As the productivity influences long term growth, we analyze productivity obstacle factors by using the revised IPA, a technique to measure attribute importance and performance. With the identified factors, we suggest improvement plans and measures to enhance productivity of overseas chemical plant projects. This study will help the companies to come up with medium and long term measures by discussing results and implications it provides.

A Study on the Sustainable Features of Realized and Planned Floating Buildings

  • Moon, Chang-Ho
    • Journal of Navigation and Port Research
    • /
    • v.36 no.2
    • /
    • pp.113-121
    • /
    • 2012
  • According to the climate change and the improvement of income level, floating building on water has been emerging as a strong alternative. This study was intended to suggest some reference materials of sustainability for new floating building projects. The concept of sustainability and floating building was investigated, and 3 realized projects and 3 planned projects were reviewed in terms of sustainability. Sustainable features of the sample projects can be summarized as recycled and relocatable usage, adoption of various renewable energy techniques, installation of self-supporting plant, application of modular system and others like new material & open layout. Sustainable features need to be developed more and more in detail and applied to many types of floating buildings.

The establishment of R&D management system for Gas Plant R&D Center (가스플랜트 사업단에서 연구관리스템 구축)

  • Hwang, Seong Ha;Yoo, Sun Il;Nam, Tae Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.1
    • /
    • pp.19-29
    • /
    • 2008
  • Traditionally gas plant R&D has had a world-wide weak position in terms of high technology. Especially System engineering did not exactly apply to gas plant construction. So, Gas Plant R&D Center is determined to make the establishment of the system engineering for the standard of gas plant. Gas Plant R&D Center has two projects. Firstly, the establishment of the R&D management system. Secondly, the system engineering which is included in the VE concept of EPC parts. But Gas Plant R&D Center exists in the particular conditions for successful development of the new process and core equipments. Now we will describe the establishment of R&D management system and particular conditions(Risk Conditions) for gas plant.

  • PDF