Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Status of Overseas Construction Market and Domestic R&D Case for Plant Projects (해외 플랜트시장 현황 및 국내 연구개발 사례)

  • An, Sung-Hoon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.129-134
    • /
    • 2008
  • Global construction market has grown rapidly since 2000. Even though developing countries grew into an economic, the most of oil-producing countries of continuous high oil prices due to an increase in plant construction orders is to present a lot of influence. According to the growth of global construction market, the domestic construction companies in the overseas market share have recorded 3% of the performance of the top 10 world records. However, current performance has analyzed the expansion of the market rather than competitiveness development of domestic construction companies. Therefore, to improve competitiveness in the global construction orders for the domestic construction companies in terms of long term, the government in Korea has ordered various research projects related to the plant since 2005. This paper presents not only global plant market trends and plant project in domestic but also introduction of completed research standardization recently.

  • PDF

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project (원전건설 물량데이터를 활용한 사업비관리 방안)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF

Establishment of Critical Work Models through the Evaluation of Technology Competitiveness (산업설비 기술수준 평가를 통한 주요업무 도출 및 모델 구축방안 연구)

  • Park Su-Hyun;Ha Seung-Ho;Kim Kyong-Min;Park Chan-Hyuk;Kim Kyong Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.526-530
    • /
    • 2004
  • The portion of plant industry has increased within construction market. In spite of plant industry is dynamic field which leads state-of-the-art and creates a value, phased information management and knowledge intensive business accomplishment are insufficient. Henceforth plant is expected to demand increment of industrial project from hereafter international plant industry market. The continuous plan technique and know-how accumulation are urgent from domestic. 1'his research analyzes the areas in which domestic plant industry is insufficient and then elicits project management key success factors from current operation process. In addition, this research compares domestic plant level with overseas plant level. This study establishes work models for critical work phases based on the analysis of domestic plant technical level.

  • PDF

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.