• Title/Summary/Keyword: Plant Project Management

Search Result 263, Processing Time 0.025 seconds

Concept and Issues in Supply Chain Management for Plant Engineering Project (플랜트 엔지니어링 프로젝트의 공급망관리 : 개념과 이슈)

  • Cheong, Heung Gyo;Park, Seong-Taek;Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.10 no.9
    • /
    • pp.213-224
    • /
    • 2012
  • Supply chain management for complex project focuses on planning acquisitions, identifying and choosing the right suppliers and subcontractors, planning and negotiating appropriate contracts, and administering and closing contracts. Working with suppliers and subcontractors requires continuous integration activities during project execution. This article examines the concept and issues concerning supply chain management in plant engineering Project, of which has not been taken seriously by industry. We propose the technological infra, social infra and information system connecting all participants in supply chain, as the major fields of research requiring industry attentions, and give a brief summary of research in each proposed areas.

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

A Study on the Gate Review of Small and Medium-Sized Plants (SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안)

  • Jin Il, Kim;Choong Sub, Yeum;Joong Uk, Shin;Sang Bae, Lee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.