• 제목/요약/키워드: Planning Standards

검색결과 628건 처리시간 0.026초

군 해체공사 안전관리 개선에 관한 연구 (A Study on the Improvement of Safety Management for Military Demolition Works)

  • 정상준;박종일
    • 한국안전학회지
    • /
    • 제37권6호
    • /
    • pp.71-80
    • /
    • 2022
  • Since the 2000s, the demand for private demolition works has been gradually increasing as the apartment housing market has been led by redevelopment and reconstruction. In the case of the military, the Ministry of National Defense is consolidating troops from each military unit to reorganize the unit structure in accordance with Defense Reform 2.0; the plan includes reducing the garrison used by each unit to 70% of its current level. Accordingly, the demand for demolition work in the military is also expected to increase. However, the military regulations do not reflect the relevant laws that have been revised recently. This study identifies regulations and system improvements for demolition work suitable for the military based on an analysis of accident cases that have occurred during demolition work, of domestic and foreign laws and regulations related to military demolition work, and of the problems with current military safety management at each stage of planning, design, and construction. The study subsequently proposes improvements for military demolition work, including budget execution adjustment, the establishment of training courses, on-site inspections, the development of guidelines for military demolition work, the provision of risk assessment standards, and the need for the qualification of equipment operators.

SE 프로세스 기반 국방 M&S체계 개발 절차 연구 (A Study on SE Process based Defense M&S System Development Procedures)

  • 이동준;고성현;이상복;노광현;윤주일
    • 시스템엔지니어링학술지
    • /
    • 제19권1호
    • /
    • pp.44-55
    • /
    • 2023
  • The defense M&S system, which has been classified as a weapon system between requirements determination and project implementation, is being developed by applying the weapon system development procedure of the Defense Acquisition Program Administration. The M&S system abstracts and models the real world to suit the intended use and proceeds with the process of developing it as a software-oriented system. Overseas, the conceptual model development stage is staged before entering the design stage after the requirements analysis. In addition, each step includes verification and validation processes. In Korea, while establishing and applying the weapon system development procedure based on the SE process, the M&S system is also applied in the same way as the general weapon system, limiting appropriate development outputs and verification and validation. In this study, the system development procedure of the M&S system is established and presented based on the relevant standards and SE process of developed countries.

석면해체 공사의 작업 위험성 기반 공정 계획 모델 개발 (Development of Process Planning Model for Asbsestos Dismantling Work Based on Performance Risk)

  • 이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.71-72
    • /
    • 2023
  • Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.

  • PDF

PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구 (A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members)

  • 전영훈;신은영;윤원건;김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

UAM 상용화를 위한 버티포트 구축 사례 연구: 프랑스 퐁투와즈 실증사례를 중심으로 (Case Study Building a Vertiport for UAM Commercialization: Based on the Demonstration in Pontoise-Cormeiles, France)

  • 김주민
    • 한국산업융합학회 논문집
    • /
    • 제27권1호
    • /
    • pp.77-86
    • /
    • 2024
  • Urban Air Mobility (UAM) is considered the future of transportation, offering solutions to urban challenges and reducing environmental issues through the use of electric power and leveraging the sky as a new transportation corridor. UAM has diverse applications, including passenger and goods transportation, emergency rescue operations, patient transfers, and urban tourism. Furthermore, it is poised to revolutionize the transportation landscape, impacting existing infrastructures such as roads and parking lots, along with autonomous vehicles. The UAM industry is anticipated to exert a significant impact on various sectors, including airframe manufacturing, the development of new materials (e.g., fuel cells and batteries), and even the defense industry, resulting in substantial economic benefits. Consequently, conducting proactive research and setting industry standards for UAM takeoff and landing infrastructure is crucial for securing market leadership. In this regard, the case of Pontoise-Cormeiles, France, stands out as it achieved the world's inaugural successful demonstration of a vertiport before the 2024 Olympics. This achievement has significant implications for our preparations for the commercialization of UAMs. Thus, a detailed review of the French vertiport construction case in this study will serve as a foundation for guiding the planning and operation of UAMs in South Korea, particularly in anticipation of upcoming demonstration tests.

소규모 대지의 조경 개선방안에 관한 연구 - 서울시를 사례로 - (Improving on Planting in Small Scale Development - The Case of Seoul -)

  • 조용현
    • 한국조경학회지
    • /
    • 제37권5호
    • /
    • pp.31-41
    • /
    • 2009
  • 우리나라 건축법에 따르면, $200m^2$ 이상의 대지 위에 건축행위를 하기 위해서는 반드시 일정면적비율 이상의 식재를 실시해야 한다. 대규모 개발에서는 이 법규가 잘 지켜지나, 소규모 개발에서는 잘 지켜지지 않고 있기 때문에 소규모 개발에 대해서는 특별한 관심이 기울여져야 한다. 따라서 이 연구의 목적은 대지의 조경에 대한 국내외 사례를 분석하고 서울시에서 소규모 대지에 대한 조경관리 실태분석을 통해 소규모 대지의 조경 설치 및 사후관리에 대한 합리적인 개선 방안을 마련하는 것이다. 이 연구에서는 2002년도에 서울시 성북구와 강남구를 대상으로 조사된 조경 실태자료를 사용하였고, 추가 현장조사와 담당공무원 및 건물소유주에 대한 설문조사를 수행하였으며, 그 분석결과를 토대로 건축단계별로 개선방안을 도출하였다. 결과를 요약하면 다음과 같다. 첫째, 건축설계 상위계획 단계에서는 조경기준의 강화, 지구단위계획에서의 지침 제공, 인센티브 제도의 도입 등을 제안하였다. 둘째, 건축설계단계에서는 설계지침 및 사례집 제작 보급, 합벽개발 허용, 연면적 2,000m2 이상 건축물 건축에서 조경기사의 직접참여 또는 협력 의무화 법조항 신설 등을 제시하였다. 셋째, 건축허가 및 준공, 사후관리단계와 관련하여 조경에 대한 허가서류 검토에 녹지직 공무원 참여 보장, 현장 검사 및 확인 업무에 조경전문가가 참여할 수 있도록 관련규정의 개정 등을 제시하였고, 사후관리에 조경전문기술자가 대행 또는 참여할 수 있도록 허용하는 관련 규정 개정 필요성 등을 제시하였으며, 시정명령 미이행 또는 위법건축물에 대한 관리감독 강화의 필요성을 제기하였다.

도시열환경 개선 및 보행자 열 쾌적성 증대를 위한 효율적 가로녹지 조성방안 연구 - 계획 및 설계를 위한 매개변수 도출과 녹지조성 방법 제안을 중심으로 - (A Study on Efficient Sidewalk Green Space Development for Improving Urban Thermal Environments and Enhancing Pedestrian Comfort - Focused on the Derivation of Parameters for Design, and Proposing Methods for Green Space Creation -)

  • 박주현;엄정희
    • 한국조경학회지
    • /
    • 제52권2호
    • /
    • pp.21-38
    • /
    • 2024
  • 본 연구는 문헌 고찰을 통해 도시 열환경 개선 및 보행자 열쾌적성 증대를 위한 효율적인 가로녹지 조성방안을 제안하는 것이 목적이다. 특히, 녹지 계획 및 설계에 활용가능한 매개변수를 도출하고, 매개변수별로 열환경 완화 매커니즘을 분석한 후, 이를 바탕으로 녹지 계획 및 설계 시 활용가능한 수종선택 방법 및 녹지조성 방법을 제안하였다. 이를 위해 국내외 관련 논문 중 4단계 과정을 통해 고찰하고자 하는 61개의 논문을 선정하였으며, 선정된 논문을 분석하여 다음과 같은 주요 결과를 도출하였다. 열스트레스가 높은 종횡비 낮고 천공률이 높은 오픈된 거리협곡의 경우, 그늘의 양과 질을 높이기 위해 수관폭이 넓고, 수고가 높고, 지하고가 낮고, 엽면적 지수가 높고, 수관의 녹량이 많은 활엽수를 다열의 좁은 간격으로 다층식재하는 것이 열저감에 효과적이다. 반면 열스트레스가 비교적 적은 종횡비가 높고 천공률이 낮은 깊고 좁은 거리협곡의 경우, 거리협곡 내 환기력을 높이기 위해 수관폭이 좁고, 지하고가 높고, 수관높이가 낮고, 엽면적 지수가 낮은 활엽수를 넓은 간격으로 식재하는 것이 열저감에 효과적이다. 본 연구는 거리협곡 내 열환경 개선 및 보행자 열쾌적성 증대를 위한 가로녹지 조성의 기초자료로 활용할 수 있으며, 녹지의 위치 선정 및 우선순위 선정 시 기초자료로 활용할 수 있다. 나아가 기후변화 대응을 위한 녹지 계획 및 설계를 위한 가이드라인 작성 시 기초자료로 활용될 수 있을 것으로 기대한다.

업무분야 규제의 폐지에 따른 종합 및 전문건설사업자들의 상호시장 진출 수준 분석 (Analysis of Mutual Market Entry Level between General and Specialty Contractors according to Abolishing the Regulation of Business Area)

  • 이치주;강형주;문혁;김민철
    • 한국건설관리학회논문집
    • /
    • 제21권2호
    • /
    • pp.59-69
    • /
    • 2020
  • 건설산업의 경쟁력 향상을 위하여 업역규제가 폐지되었으며, 종합 및 전문건설사업자들이 상호시장에 진출할 수 있게 되었다. 정부에서는 후속단계로, 세분화된 업종을 대분류하는 업종체계의 개편을 준비 중이다. 업역규제의 폐지가 건설산업에 미치는 영향을 분석한 자료가 있다면, 업종개편을 단계적으로 적용하기 위한 범위의 결정에 도움을 줄 수 있을 것이다. 본 연구는 상호시장 진출의 가능성이 높은 종합 및 전문건설사업자들의 업종들을 도출한 후, 시장규모를 분석하여 업역규제의 폐지 효과를 설명하고자 한다. 먼저, 과거에 수행한 공사들의 연계성과 등록기준의 유사성을 기반으로, 종합건설사업자들이 진출 가능한 전문공사를 분석하였다. 분석결과, 15개의 전문공사에 진출할 수 있었으며, 시장규모는 2017년 전문공사의 총 수주금액인 약 96조원의 약 82%(78.8조원)으로 분석되었다. 다음으로, 업무내용의 관련성을 기반으로 전문건설사업자들이 진출할 가능성이 높은 종합공사와 시장규모를 분석하였다. 분석결과, 4개의 종합공사에 진출할 수 있는 시장규모는 2017년 종합공사의 총 수주금액인 약 190조원의 약 13%(24.7조원)으로 분석되었다. 본 연구의 분석결과에서는 종합건설사업자가 전문공사 시장으로 진출할 가능성이 전문건설사업자가 종합공사 시장으로 진출할 가능성이 더 클 것으로 나타났다. 하지만, 본 연구는 업종별 업무내용과 등록기준, 업역규제가 폐지되기 전의 공사실적을 기반으로 분석한 한계가 있다. 향후에 업종별 업무내용과 등록기준이 변경된다면, 본 연구의 결과와 차이가 있을 수 있을 것이다.

공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 - (LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling -)

  • 김복영;손용훈;이순지
    • 한국조경학회지
    • /
    • 제46권3호
    • /
    • pp.14-26
    • /
    • 2018
  • 생태면적률은 친환경적 공간 개발을 위한 정량적 사전 계획지표이자 건축물과 외부공간의 균형 있는 개발을 유도하는 통합적 지표이다. 그러나 제도 적용상 면적 산정의 오류, 하부 지반과 토심 확보 기준의 미달, 시공 후 실제 생태면적의 감소, 사전 계획지표로서의 기능 저하 등의 문제점들이 지적되어 왔다. 본 연구에서는 이를 해결하기 위해 LIM 활용을 제안하였다. 생태면적률의 가중치는 주로 하부 지반과 토심, 피복 유형에 의해 결정되므로 지형과 포장재를 중심으로 연구를 진행하였다. 모델은 정부기관 및 관련 전문단체에서 제시한 BIM 기준과 가이드라인, 지침서를 참고하여 여기에 부합되도록 모델의 작성 범위와 상세 수준을 의미하는 LOD(Level Of Detail)를 설정하고, BIM 저작도구를 선정하여 조경정보모델을 구축하는 방법을 제시하였다. 사례 대상지로는 경사지에 위치한 공동주택단지를 선정하여 3차원적 지형을 모델링하고, 생태면적률과 관련된 속성정보를 포함한 포장재 라이브러리를 제작하였으며, 이들을 토대로 부지의 조경 정보모델을 완성하였다. 그리고 구축된 모델을 활용하여 생태면적률을 산정하고, 계획도와 산정표, 포장 상세도 등 관련 도면을 출력하였다. LIM을 활용함으로써 생태면적률의 기준 적용과 면적 산정이 정확해지고 설계업무의 효율성을 도모할 수 있었으며, 지형과 지하구조물의 관계 등 입체적 형태에 대한 객관적 검토가 가능해짐을 알 수 있었다. LIM 도입을 위해 라이브러리 매뉴얼 또는 템플릿을 작성, 배포하거나 KBIMS 기준에 부합하는 라이브러리 구축에 힘써야 하며, 인증제도에서 BIM 모델을 제출하도록 하는 제도적 전환이 필요하다. 앞으로 생태면적률에 식재 유형별 기준이 도입되어 확대 적용될 것으로 예상되므로 식재 정보 모델 구축과 활용에 대한 후속 연구가 요구된다.

방사선치료계획시스템의 독립적 검증을 위한 선량 계산 및 빔데이터 관리 프로그램 (A Comprehensive Computer Program for Monitor Unit Calculation and Beam Data Management: Independent Verification of Radiation Treatment Planning Systems)

  • 김희정;박양균;박종민;최창헌;김정인;이상원;오헌진;임천일;김일한;예성준
    • 한국의학물리학회지:의학물리
    • /
    • 제19권4호
    • /
    • pp.231-240
    • /
    • 2008
  • 방사선치료계획시스템의 MU계산 결과를 포괄적이고 독립적으로 검증할 수 있고 빔데이터 관리를 위한 사용자 친화적인 프로그램을 개발하였다. 선량계산의 정확성을 향상시키기 위해서 축이탈 인자, 빔 경화효과, 비균질성 보정 등의 요소를 계산 알고리듬에 포함하였고 상시적 정도관리 결과로 측정된 빔데이터로의 경신이 용이하도록 하였다. 기준깊이, SSD 등의 측정조건이 다를 때에 보정하는 알고리듬을 구현하였다. 상용 스프레드시트의 워크시트 함수를 빔데이터베이스 접근에 사용하였고, Visual Basic for Application (VBA) 개발환경을 사용하여 graphic user interface (GUI)를 구현하였다. 프로그램의 정확도를 평가하기 위하여 동일한 빔 데이터를 가진 치료계획 시스템을 이용하여 213개의 경우에 대한 팬톰의 선량을 계산하고 비교하였다. 또한 3차원 입체조형방사선 치료를 받은 17명의 환자데이터로부터 108개의 MU계산 기록을 추출하여 본 프로그램에서 계산된 MU와 비교하였다. 가상의 팬톰을 대상으로 계산을 수행한 결과, 과도한 비균질 영역계산을 제외하면 계산된 MU가 치료계획시스템과 3% 이내에서 잘 일치하였고, 환자 데이터를 이용한 계산에서도 과도한 비균질 영역 계산을 제외한 모든 계산에서 최대오차가 5% 이하로 나타났다. VBA 및 Microsoft Excel 워크시트 인터페이스를 이용하여 임상에 이용될 빔데이터 자료의 자동 생성 및 빔데이터 비교 템플릿 등의 용이성이 판명되었다. 본 프로그램을 이용하여 치료계획시스템의 정확성을 포괄적으로 검증할 수 있으므로 치료계획시스템의 정도관리 및 환자의 독립적 선량검증을 효과적으로 수행할 수 있다. 빔데이터베이스 생성 기능을 이용하여 빔데이터의 주기적 관리 경신 및 대단위 빔데이터베이스의 모니터링을 효율적으로 수행할 수 있다.

  • PDF