• Title/Summary/Keyword: Planning Standards

Search Result 628, Processing Time 0.033 seconds

A Study on the Improvement of Safety Management for Military Demolition Works (군 해체공사 안전관리 개선에 관한 연구)

  • Sang Jun, Jeong;Jong Yil, Park
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.71-80
    • /
    • 2022
  • Since the 2000s, the demand for private demolition works has been gradually increasing as the apartment housing market has been led by redevelopment and reconstruction. In the case of the military, the Ministry of National Defense is consolidating troops from each military unit to reorganize the unit structure in accordance with Defense Reform 2.0; the plan includes reducing the garrison used by each unit to 70% of its current level. Accordingly, the demand for demolition work in the military is also expected to increase. However, the military regulations do not reflect the relevant laws that have been revised recently. This study identifies regulations and system improvements for demolition work suitable for the military based on an analysis of accident cases that have occurred during demolition work, of domestic and foreign laws and regulations related to military demolition work, and of the problems with current military safety management at each stage of planning, design, and construction. The study subsequently proposes improvements for military demolition work, including budget execution adjustment, the establishment of training courses, on-site inspections, the development of guidelines for military demolition work, the provision of risk assessment standards, and the need for the qualification of equipment operators.

A Study on SE Process based Defense M&S System Development Procedures (SE 프로세스 기반 국방 M&S체계 개발 절차 연구)

  • Dong Joon Lee;Seong Hyun Koh;Sang Bok Lee;Kwan Ghyun Ro;Ju Il Yoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.44-55
    • /
    • 2023
  • The defense M&S system, which has been classified as a weapon system between requirements determination and project implementation, is being developed by applying the weapon system development procedure of the Defense Acquisition Program Administration. The M&S system abstracts and models the real world to suit the intended use and proceeds with the process of developing it as a software-oriented system. Overseas, the conceptual model development stage is staged before entering the design stage after the requirements analysis. In addition, each step includes verification and validation processes. In Korea, while establishing and applying the weapon system development procedure based on the SE process, the M&S system is also applied in the same way as the general weapon system, limiting appropriate development outputs and verification and validation. In this study, the system development procedure of the M&S system is established and presented based on the relevant standards and SE process of developed countries.

Development of Process Planning Model for Asbsestos Dismantling Work Based on Performance Risk (석면해체 공사의 작업 위험성 기반 공정 계획 모델 개발)

  • Lee, Su-Min;Noh, Jae-Yun;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.71-72
    • /
    • 2023
  • Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.

  • PDF

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

Case Study Building a Vertiport for UAM Commercialization: Based on the Demonstration in Pontoise-Cormeiles, France (UAM 상용화를 위한 버티포트 구축 사례 연구: 프랑스 퐁투와즈 실증사례를 중심으로)

  • Joomin Kim
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.1
    • /
    • pp.77-86
    • /
    • 2024
  • Urban Air Mobility (UAM) is considered the future of transportation, offering solutions to urban challenges and reducing environmental issues through the use of electric power and leveraging the sky as a new transportation corridor. UAM has diverse applications, including passenger and goods transportation, emergency rescue operations, patient transfers, and urban tourism. Furthermore, it is poised to revolutionize the transportation landscape, impacting existing infrastructures such as roads and parking lots, along with autonomous vehicles. The UAM industry is anticipated to exert a significant impact on various sectors, including airframe manufacturing, the development of new materials (e.g., fuel cells and batteries), and even the defense industry, resulting in substantial economic benefits. Consequently, conducting proactive research and setting industry standards for UAM takeoff and landing infrastructure is crucial for securing market leadership. In this regard, the case of Pontoise-Cormeiles, France, stands out as it achieved the world's inaugural successful demonstration of a vertiport before the 2024 Olympics. This achievement has significant implications for our preparations for the commercialization of UAMs. Thus, a detailed review of the French vertiport construction case in this study will serve as a foundation for guiding the planning and operation of UAMs in South Korea, particularly in anticipation of upcoming demonstration tests.

Improving on Planting in Small Scale Development - The Case of Seoul - (소규모 대지의 조경 개선방안에 관한 연구 - 서울시를 사례로 -)

  • Cho, Yong-Hyeon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.5
    • /
    • pp.31-41
    • /
    • 2009
  • Under the Korea Building Act, anyone planning to build a building or buildings on a site over $200m^2$ must plant plants over a specific area. In large scale development this rule is adhered to well, but such is not the case in small scale development. Therefore, special attention must be given to small scale development. Thus, the purpose of this research is to analyze the current situation and practice of planting at small scale development sites in Seoul, and then suggest policies for improving them. In this study using the data covering Seongbuk-Gu and Gangnam-Gu, which was surveyed in 2002, the current situation and practice of planting at small scale development sites was analyzed. After a questionnaire survey was conducted with government officers and building owners, the same analysis was made. Then the policies for improvement were extracted. The results are as follows: 1. In superordinate planning stage, because the minimum standards are too low, those must be strengthened. Any district plan does not control planting in private building lots. This requests active application of planting in private building lots as a design control measure in district planning. 2. In the building design stage, there are no guidelines. The obligation of building set-back between adjacent buildings by the Korean Building Act produces mass shaded and inferior planting beds. The act also is blocking landscape architects' participation in small scale development. And wall installations deteriorate the streetscape and growth of plants with shading. Therefore guidelines must be made. 3. In each stage of the building permit, the permit for building completion, and maintenance the Korean Building Act is blocking landscape architects' participation in small scale development, so the planting plan is completely handled by nonprofessional persons. Therefore, the act should be amended in order to make way for landscape architects' participation in each stage of the small scale development process.

A Study on Efficient Sidewalk Green Space Development for Improving Urban Thermal Environments and Enhancing Pedestrian Comfort - Focused on the Derivation of Parameters for Design, and Proposing Methods for Green Space Creation - (도시열환경 개선 및 보행자 열 쾌적성 증대를 위한 효율적 가로녹지 조성방안 연구 - 계획 및 설계를 위한 매개변수 도출과 녹지조성 방법 제안을 중심으로 -)

  • Park, Ju-Hyeon;Eum, Jeong-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.2
    • /
    • pp.21-38
    • /
    • 2024
  • This study aims to establish an efficient street green area to improve the urban thermal environment and enhance pedestrian thermal comfort. Specifically, This study identified parameters applicable to green space planning and design, analyzed thermal environment mitigation mechanisms for each parameter, and, based on these findings, proposed methods for tree species selection and planting in green space planning and design. To achieve this, 61 papers were selected through a four-stage process from both domestic and foreign sources. The selected papers were analyzed, and the following main results were derived: In open street canyons with high stress levels due to low aspect ratios and high sky view factors(SVF), broadleaf trees with wide crown widths, low trunk heights, high leaf area index(LAI), and high crown heights were found effective in reducing heat, thereby increasing the amount and quality of shade. In contrast, in deep and narrow street canyons with relatively low heat stress due to high aspect ratios and low SVF, broad-leaved trees with narrow crown widths, high trunks, low crown heights, and low LAI were effective in reducing heat by enhancing ventilation. This study can serve as fundamental data for establishing standards for street green spaces to improve the thermal environment of street canyons and enhance thermal comfort of pedestrians. Additionally, it can be valuable when selecting the location and prioritizing street green spaces. Moreover, it is anticipated to be a foundational resource for creating guidelines for green space planning and design in response to climate change.

Analysis of Mutual Market Entry Level between General and Specialty Contractors according to Abolishing the Regulation of Business Area (업무분야 규제의 폐지에 따른 종합 및 전문건설사업자들의 상호시장 진출 수준 분석)

  • Lee, Chijoo;Kang, Hyeongjoo;Moon, Hyuk;Kim, Minchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.59-69
    • /
    • 2020
  • The regulation of business area was abolished to improve the competitiveness of the construction industry and the ability of general and specialty contractors to enter the mutual market. As the next step, the government is preparing for a reorganization of business type. If the impact of the abolishing of business area on the construction industry is analyzed, the result can contribute to determining the step by step application scope of the reorganization of business type. This study derived the business types having a high probability of the mutual market entry of general and specialty contractors. Then, the size of mutual market entry is analyzed. First, the connection between the general and specialty construction, and the similarities between the registration standards of general and specialty construction are analyzed. Based on the result, a general contractor can enter 15 business types of specialty construction, and the market size is about 78.8 trillion KRW. This is about 82% of the total contract cost of specialty construction during the year 2017 (about 96 trillion KRW). Next, based on the relevance of business contents, the market size when general contractors enter the specialty construction market is analyzed. As a result, the market size is about 24.7 trillion KRW, and this is about 13% of total contract cost of general construction during the year 2017 (about 190 trillion KRW). Based on the result of this study, there is a higher probability of the mutual market entry of general contractors into specialty construction than vice versa. However, the result of this study is based on the current contents of business types, registration standards, and construction data of before abolishing the regulation of business area. This is a research limitation. If the business contents and registration standards are changed in the future, the result could differ from the current result.

LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling - (공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 -)

  • Kim, Bok-Young;Son, Yong-Hoon;Lee, Soon-Ji
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.14-26
    • /
    • 2018
  • The Biotope Area Ratio (BAR) is a quantitative pre-planning index for sustainable development and an integrated indicator for the balanced development of buildings and outdoor spaces. However, it has been pointed out that there are problems in operations management: errors in area calculation, insufficiency in the underground soil condition and depth, reduction in biotope area after construction, and functional failure as a pre-planning index. To address these problems, this study proposes implementing LIM. Since the weights of the BAR are mainly decided by the underground soil condition and depth with land cover types, the study focused on the terrain and pavements. The model should conform to BIM guidelines and standards provided by government agencies and professional organizations. Thus, the scope and Level Of Detail (LOD) of the model were defined, and the method to build a model with BIM software was developed. An apartment complex on sloping ground was selected as a case study, a 3D terrain modeled, paving libraries created with property information on the BAR, and a LIM model completed for the site. Then the BAR was calculated and construction documents were created with the BAR table and pavement details. As results of the study, it was found that the application of the criteria on the BAR and calculation became accurate, and the efficiency of design tasks was improved by LIM. It also enabled the performance of evidence-based design on the terrain and underground structures. To adopt LIM, it is necessary to create and distribute LIM library manuals or templates, and build library content that comply with KBIMS standards. The government policy must also have practitioners submit BIM models in the certification system. Since it is expected that the criteria on planting types in the BAR will be expanded, further research is needed to build and utilize the information model for planting materials.

A Comprehensive Computer Program for Monitor Unit Calculation and Beam Data Management: Independent Verification of Radiation Treatment Planning Systems (방사선치료계획시스템의 독립적 검증을 위한 선량 계산 및 빔데이터 관리 프로그램)

  • Kim, Hee-Jung;Park, Yang-Kyun;Park, Jong-Min;Choi, Chang-Heon;Kim, Jung-In;Lee, Sang-Won;Oh, Heon-Jin;Lim, Chun-Il;Kim, Il-Han;Ye, Sung-Joon
    • Progress in Medical Physics
    • /
    • v.19 no.4
    • /
    • pp.231-240
    • /
    • 2008
  • We developed a user-friendly program to independently verify monitor units (MUs) calculated by radiation treatment planning systems (RTPS), as well as to manage beam database in clinic. The off-axis factor, beam hardening effect, inhomogeneity correction, and the different depth correction were incorporated into the program algorithm to improve the accuracy in calculated MUs. A beam database in the program was supposed to use measured data from routine quality assurance (QA) processes for timely update. To enhance user's convenience, a graphic user interface (GUI) was developed by using Visual Basic for Application. In order to evaluate the accuracy of the program for various treatment conditions, the MU comparisons were made for 213 cases of phantom and for 108 cases of 17 patients treated by 3D conformal radiation therapy. The MUs calculated by the program and calculated by the RTPS showed a fair agreement within ${\pm}3%$ for the phantom and ${\pm}5%$ for the patient, except for the cases of extreme inhomogeneity. By using Visual Basic for Application and Microsoft Excel worksheet interface, the program can automatically generate beam data book for clinical reference and the comparison template for the beam data management. The program developed in this study can be used to verify the accuracy of RTPS for various treatment conditions and thus can be used as a tool of routine RTPS QA, as well as independent MU checks. In addition, its beam database management interface can update beam data periodically and thus can be used to monitor multiple beam databases efficiently.

  • PDF