• Title/Summary/Keyword: Plan system commissioning

Search Result 14, Processing Time 0.029 seconds

KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site (이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획)

  • Song, Inho;Oh, Jong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

System Safety Program Plan for The Development of KHSR (고속전철 기술개발 안전 확보 계획)

  • 황희수;최강윤
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.288-295
    • /
    • 1998
  • In this paper the system safety program plan(SSPP) for the development of Korea high speed railway system was presented. The plan for the design phase built up base upon MIL-STD 882C, manual for the development of rail transit system safety program plans by American Public Transit Association, and SSPP for Seoul-Pusan High Speed Rail project should be modified and then applied to the phases of manufacturing, test and commissioning. The plan deals with the safety program, the reference standards, the management and responsibility for the safety related activities, the methods to be used for early identifying safety critical items and functions and eliminating or controlling all hazards in a timely and cost-effective manner, and the documentation generated for safety assessment.

  • PDF

Safety Case for AREX's E&M System (공항철도 기전시스템의 종합안전대책기술서)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.280-288
    • /
    • 2007
  • This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.

  • PDF

The Feasibility study of Commission plan in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 시운전방안 효율성 검토)

  • Cho, B.C.;Kim, K.G.;Jeong, S.H.;Kim, J.S.;Lim, K.M.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1039-1044
    • /
    • 2008
  • By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.

  • PDF

A Comparative Study on Management Evaluation and Re-certification System of G-SEED, BREEAM, LEED (국내외 녹색건축인증제의 유지관리 및 재인증 제도에 대한 비교 연구)

  • Hyun, Eun Mi;Kim, Yong Sik
    • KIEAE Journal
    • /
    • v.14 no.1
    • /
    • pp.121-129
    • /
    • 2014
  • As time passes, the aging of the plant building, the building's energy performance degradation than the initial plan does not express a situation could arise. This year, the certification of buildings certified in 2009 has expired for measures such as the situation required. In this study, management of national and international green building certification and re-certification was compared in two ways. First, the evaluation of green building certification system management assessments were compared. Second, the green building certification system for the re-certification analysis. As a result, G-SEED was not reflected life-cycle of building in management assessment and the commissioning of G-SEED is the UK and the U.S and other concepts of evaluation. In addition, the re-certification system is insufficient about substantial energy consumption of buildings. In this study, the revised the management assessments in conjunction with the re-certification system to manage the building is proposed to improve. In addition, the current evaluation of the existing building certification "existing building" and "building the first certified" as it is more efficient to separate the information into assessment was judged. Green building certification system to meet the purpose of management and operation, and disposal phases of the building to promote energy conservation and sustainability in order to the management a systematic and detailed evaluation and re-certification system developed for the revision of the specific items required and future research want to continue.

A review of ATKP LEU System's Test procedure (자동열차보호장치(ATP) 지상설비 시험절차에 대한 고찰)

  • Chang, Seok-Gahk;Kim, Jin-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1480-1483
    • /
    • 2009
  • The KNR wayside and onboard subsystem has completed commissioning tests applicable to the Pilot Line section by BOMBARDIER. Andreas Hardt/Assessor and Rod Muttram/VP, Quality & safety approved the Automatic Train Protection(ATP) System. However additional evidences are necessary to come to a Specific Application, which is mandatory to approve the Generic Applications included for commercial running on the overall main line railway with ATP. According to Factory Acceptance Test plan, CBC, CBF, LEU(Line Electronic Unit) made by domestic factory is tested by official recognition test Standards-Setting Agency. It is important to verify quality which form checklist during Factory Acceptance Test. In this paper, review the process, test item, norm and checklist for the CBC, CBF, LEU.

  • PDF

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

Geodetic Survey Campaigns and Maintenance Plan for KASS Reference Station Antenna Coordinates

  • Hwanho, Jeong;Hyunjin, Jang;Youngsun, Yun;ByungSeok, Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.12 no.1
    • /
    • pp.83-89
    • /
    • 2023
  • The Korea Augmentation Satellite System (KASS) system is a Satellite Based Augmentation System (SBAS) under development to provide APV-I SBAS service in the Republic of Korea. The KASS ground segment generates correction and integrity information for GPS measurements of KASS users using the accurate positions of KASS Reference Station (KRS) antenna phase centers. For this reason, the accuracy of KRS reference points through geodetic survey campaigns is one of the important factors for providing the KASS service in compliance with the required navigation performance. In order to obtain accurate positions, two geodetic survey campaigns were performed at several reference points, such as Mark, Center of Mast at Ground Level (CMGL), and Center of Hole in Top Plate (CHTP), of each KRS site using three different survey methods, the Virtual Reference Station (VRS), Flächen Korrektur Parameter (FKP), and raw data post-processing methods. By comparing and analyzing the results, the computed coordinates of the reference points were verified and Antenna Phase Center (APC) positions were calculated using KRS Antenna Reference Point (ARP) data, and the first KASS Site Acceptance Test (SAT#1) was performed successfully using the verified APC coordinates. After the first site survey activities, the KASS operators should maintain the coordinates with the required performance such that the overall KASS navigation performance commitment is guaranteed during the lifetime of 15 years. Therefore, the maintenance plan for the KRS antenna coordinates should be developed before the commissioning of KASS operation planned after 2023. Therefore, this paper presents a geodetic survey method selected for the maintenance activities and provides the rationale for using this method.

A Leverage Strategy of the Defense Program Analysis Based on Systems Thinking (시스템 사고를 이용한 국방 사업분석 레버리지 전략)

  • Seo, Hyeok;Lee, Sang-Eun
    • Korean System Dynamics Review
    • /
    • v.10 no.1
    • /
    • pp.77-95
    • /
    • 2009
  • The ever-increasing government budget constraints have led to a continued decline in the increase rate for defense spending, and the government's 5-year National Fiscal Management Plan has served to reinforce the verification and validation procedures for the Force Improvement Programs (FIP) budget requirements and performance. Additionally, as large programs are controlled in accordance with the Total Program Cost Management Guidelines, timely and credible feasibility study and performance measurement need to be conducted. Due to these internal and external circumstances, needs have surged for feasibility and economic effectiveness study for big ticket projects in the FIP sector, with an increasing number of studies conducted by external research institutes. However, questions have been raised regarding the credibility and thoroughness of the program analyses performed by these research institutes due to various restrictions. This paper analyzes and identifies the structural limitations and problems using a systems thinking approach, and examines the systemic characteristics of the program analysis system. It also presents policy intervention recommendations based on the theory of systems thinking, a method to regularize and reinforce the program analysis system. Policy interventions recommended to ensure alignment of the external studies to the clear analysis objectives and resolve the bottlenecks in the external analysis include training those in charge of external study commissioning for a short term intervention, and increasing the number of research institutes and consulting agencies utilizing analysis and evaluation experts who transition to the private sector from the military for a long term intervention. additionally presented are strategies and policy alternatives to best utilize these policy interventions. They will contribute to the stable funding of Force Improvement Programs and efficient utilization of defense budget.