The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.
In this paper the system safety program plan(SSPP) for the development of Korea high speed railway system was presented. The plan for the design phase built up base upon MIL-STD 882C, manual for the development of rail transit system safety program plans by American Public Transit Association, and SSPP for Seoul-Pusan High Speed Rail project should be modified and then applied to the phases of manufacturing, test and commissioning. The plan deals with the safety program, the reference standards, the management and responsibility for the safety related activities, the methods to be used for early identifying safety critical items and functions and eliminating or controlling all hazards in a timely and cost-effective manner, and the documentation generated for safety assessment.
This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.
By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.
As time passes, the aging of the plant building, the building's energy performance degradation than the initial plan does not express a situation could arise. This year, the certification of buildings certified in 2009 has expired for measures such as the situation required. In this study, management of national and international green building certification and re-certification was compared in two ways. First, the evaluation of green building certification system management assessments were compared. Second, the green building certification system for the re-certification analysis. As a result, G-SEED was not reflected life-cycle of building in management assessment and the commissioning of G-SEED is the UK and the U.S and other concepts of evaluation. In addition, the re-certification system is insufficient about substantial energy consumption of buildings. In this study, the revised the management assessments in conjunction with the re-certification system to manage the building is proposed to improve. In addition, the current evaluation of the existing building certification "existing building" and "building the first certified" as it is more efficient to separate the information into assessment was judged. Green building certification system to meet the purpose of management and operation, and disposal phases of the building to promote energy conservation and sustainability in order to the management a systematic and detailed evaluation and re-certification system developed for the revision of the specific items required and future research want to continue.
The KNR wayside and onboard subsystem has completed commissioning tests applicable to the Pilot Line section by BOMBARDIER. Andreas Hardt/Assessor and Rod Muttram/VP, Quality & safety approved the Automatic Train Protection(ATP) System. However additional evidences are necessary to come to a Specific Application, which is mandatory to approve the Generic Applications included for commercial running on the overall main line railway with ATP. According to Factory Acceptance Test plan, CBC, CBF, LEU(Line Electronic Unit) made by domestic factory is tested by official recognition test Standards-Setting Agency. It is important to verify quality which form checklist during Factory Acceptance Test. In this paper, review the process, test item, norm and checklist for the CBC, CBF, LEU.
국내 CM시장이 활성화됨에 따라 경쟁이 심화되어 실제 프로젝트 관리를 담당하는 CM단장의 능력은 CM사업 수주를 위한 중요한 요소가 되었다. 이로 인해 각 CM전문회사는 유능한 CM단장의 확보를 위해 현재 담당 프로젝트가 없더라도 후속 프로젝트의 수주를 위해 CM단장을 일정수 대기상태로 확보하고 있으나, 효율적인 활용방안에 대해서는 체계적인 방법이 마련되지 못한 실정이다. 이에 본 연구는 현재 CM전문회사가 보유하고 있는 대기상태 CM단장들의 활용실태 및 문제점을 분석하고, CM단장의 효율적인 활용을 위한 개선방안을 모색하기 위한 실무적 기초자료를 제시하고자 하였다. 본 연구결과, CM전문회사의 현재 대기상태 CM단장 인력수는 적정 비율 및 인력수에 비해 약 2배 정도 많은 것으로 나타났고, CM단장의 선정기준으로 프로젝트의 수주를 위해 프레젠테이션 능력을 가장 중요한 요소로 고려하고 있었다. 그리고 대기상태 CM단장의 보유 및 활용상 문제점은 크게 고용비용 증가와 현장 및 본사 업무지원능력 부족 및 제한적 활용으로 요약되었고, 대기상태 CM단장의 효율적인 활용을 위한 현장 및 본사 기술지원과 수주능력 강화 및 제도개선 등에 관한 개선방안을 제안하였다.
Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.
Hwanho, Jeong;Hyunjin, Jang;Youngsun, Yun;ByungSeok, Lee
Journal of Positioning, Navigation, and Timing
/
제12권1호
/
pp.83-89
/
2023
The Korea Augmentation Satellite System (KASS) system is a Satellite Based Augmentation System (SBAS) under development to provide APV-I SBAS service in the Republic of Korea. The KASS ground segment generates correction and integrity information for GPS measurements of KASS users using the accurate positions of KASS Reference Station (KRS) antenna phase centers. For this reason, the accuracy of KRS reference points through geodetic survey campaigns is one of the important factors for providing the KASS service in compliance with the required navigation performance. In order to obtain accurate positions, two geodetic survey campaigns were performed at several reference points, such as Mark, Center of Mast at Ground Level (CMGL), and Center of Hole in Top Plate (CHTP), of each KRS site using three different survey methods, the Virtual Reference Station (VRS), Flächen Korrektur Parameter (FKP), and raw data post-processing methods. By comparing and analyzing the results, the computed coordinates of the reference points were verified and Antenna Phase Center (APC) positions were calculated using KRS Antenna Reference Point (ARP) data, and the first KASS Site Acceptance Test (SAT#1) was performed successfully using the verified APC coordinates. After the first site survey activities, the KASS operators should maintain the coordinates with the required performance such that the overall KASS navigation performance commitment is guaranteed during the lifetime of 15 years. Therefore, the maintenance plan for the KRS antenna coordinates should be developed before the commissioning of KASS operation planned after 2023. Therefore, this paper presents a geodetic survey method selected for the maintenance activities and provides the rationale for using this method.
The ever-increasing government budget constraints have led to a continued decline in the increase rate for defense spending, and the government's 5-year National Fiscal Management Plan has served to reinforce the verification and validation procedures for the Force Improvement Programs (FIP) budget requirements and performance. Additionally, as large programs are controlled in accordance with the Total Program Cost Management Guidelines, timely and credible feasibility study and performance measurement need to be conducted. Due to these internal and external circumstances, needs have surged for feasibility and economic effectiveness study for big ticket projects in the FIP sector, with an increasing number of studies conducted by external research institutes. However, questions have been raised regarding the credibility and thoroughness of the program analyses performed by these research institutes due to various restrictions. This paper analyzes and identifies the structural limitations and problems using a systems thinking approach, and examines the systemic characteristics of the program analysis system. It also presents policy intervention recommendations based on the theory of systems thinking, a method to regularize and reinforce the program analysis system. Policy interventions recommended to ensure alignment of the external studies to the clear analysis objectives and resolve the bottlenecks in the external analysis include training those in charge of external study commissioning for a short term intervention, and increasing the number of research institutes and consulting agencies utilizing analysis and evaluation experts who transition to the private sector from the military for a long term intervention. additionally presented are strategies and policy alternatives to best utilize these policy interventions. They will contribute to the stable funding of Force Improvement Programs and efficient utilization of defense budget.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.