• 제목/요약/키워드: Plan system commissioning

검색결과 14건 처리시간 0.026초

이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획 (KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site)

  • 송인호;오종석
    • 전력전자학회논문지
    • /
    • 제27권5호
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

고속전철 기술개발 안전 확보 계획 (System Safety Program Plan for The Development of KHSR)

  • 황희수;최강윤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 추계학술대회 논문집
    • /
    • pp.288-295
    • /
    • 1998
  • In this paper the system safety program plan(SSPP) for the development of Korea high speed railway system was presented. The plan for the design phase built up base upon MIL-STD 882C, manual for the development of rail transit system safety program plans by American Public Transit Association, and SSPP for Seoul-Pusan High Speed Rail project should be modified and then applied to the phases of manufacturing, test and commissioning. The plan deals with the safety program, the reference standards, the management and responsibility for the safety related activities, the methods to be used for early identifying safety critical items and functions and eliminating or controlling all hazards in a timely and cost-effective manner, and the documentation generated for safety assessment.

  • PDF

공항철도 기전시스템의 종합안전대책기술서 (Safety Case for AREX's E&M System)

  • 이창환;임성수;송미옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.280-288
    • /
    • 2007
  • This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.

  • PDF

분산형 고속철도 시스템의 시운전방안 효율성 검토 (The Feasibility study of Commission plan in HEMU (High-speed Electric Multiple Unit) System)

  • 조병찬;김광길;정상훈;김종선;임광만
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1039-1044
    • /
    • 2008
  • By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.

  • PDF

국내외 녹색건축인증제의 유지관리 및 재인증 제도에 대한 비교 연구 (A Comparative Study on Management Evaluation and Re-certification System of G-SEED, BREEAM, LEED)

  • 현은미;김용식
    • KIEAE Journal
    • /
    • 제14권1호
    • /
    • pp.121-129
    • /
    • 2014
  • As time passes, the aging of the plant building, the building's energy performance degradation than the initial plan does not express a situation could arise. This year, the certification of buildings certified in 2009 has expired for measures such as the situation required. In this study, management of national and international green building certification and re-certification was compared in two ways. First, the evaluation of green building certification system management assessments were compared. Second, the green building certification system for the re-certification analysis. As a result, G-SEED was not reflected life-cycle of building in management assessment and the commissioning of G-SEED is the UK and the U.S and other concepts of evaluation. In addition, the re-certification system is insufficient about substantial energy consumption of buildings. In this study, the revised the management assessments in conjunction with the re-certification system to manage the building is proposed to improve. In addition, the current evaluation of the existing building certification "existing building" and "building the first certified" as it is more efficient to separate the information into assessment was judged. Green building certification system to meet the purpose of management and operation, and disposal phases of the building to promote energy conservation and sustainability in order to the management a systematic and detailed evaluation and re-certification system developed for the revision of the specific items required and future research want to continue.

자동열차보호장치(ATP) 지상설비 시험절차에 대한 고찰 (A review of ATKP LEU System's Test procedure)

  • 장석각;김진환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1480-1483
    • /
    • 2009
  • The KNR wayside and onboard subsystem has completed commissioning tests applicable to the Pilot Line section by BOMBARDIER. Andreas Hardt/Assessor and Rod Muttram/VP, Quality & safety approved the Automatic Train Protection(ATP) System. However additional evidences are necessary to come to a Specific Application, which is mandatory to approve the Generic Applications included for commercial running on the overall main line railway with ATP. According to Factory Acceptance Test plan, CBC, CBF, LEU(Line Electronic Unit) made by domestic factory is tested by official recognition test Standards-Setting Agency. It is important to verify quality which form checklist during Factory Acceptance Test. In this paper, review the process, test item, norm and checklist for the CBC, CBF, LEU.

  • PDF

CM 전문회사 단장 활용실태 및 개선방안 (Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures)

  • 손창백;허영기;이동은
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.87-95
    • /
    • 2013
  • 국내 CM시장이 활성화됨에 따라 경쟁이 심화되어 실제 프로젝트 관리를 담당하는 CM단장의 능력은 CM사업 수주를 위한 중요한 요소가 되었다. 이로 인해 각 CM전문회사는 유능한 CM단장의 확보를 위해 현재 담당 프로젝트가 없더라도 후속 프로젝트의 수주를 위해 CM단장을 일정수 대기상태로 확보하고 있으나, 효율적인 활용방안에 대해서는 체계적인 방법이 마련되지 못한 실정이다. 이에 본 연구는 현재 CM전문회사가 보유하고 있는 대기상태 CM단장들의 활용실태 및 문제점을 분석하고, CM단장의 효율적인 활용을 위한 개선방안을 모색하기 위한 실무적 기초자료를 제시하고자 하였다. 본 연구결과, CM전문회사의 현재 대기상태 CM단장 인력수는 적정 비율 및 인력수에 비해 약 2배 정도 많은 것으로 나타났고, CM단장의 선정기준으로 프로젝트의 수주를 위해 프레젠테이션 능력을 가장 중요한 요소로 고려하고 있었다. 그리고 대기상태 CM단장의 보유 및 활용상 문제점은 크게 고용비용 증가와 현장 및 본사 업무지원능력 부족 및 제한적 활용으로 요약되었고, 대기상태 CM단장의 효율적인 활용을 위한 현장 및 본사 기술지원과 수주능력 강화 및 제도개선 등에 관한 개선방안을 제안하였다.

전수명주기를 고려한 PMIS개발 방안 (A Development Plan for PMIS based on Total Life Cycle)

  • 박수중;이성권;정계용;김재진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

Geodetic Survey Campaigns and Maintenance Plan for KASS Reference Station Antenna Coordinates

  • Hwanho, Jeong;Hyunjin, Jang;Youngsun, Yun;ByungSeok, Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제12권1호
    • /
    • pp.83-89
    • /
    • 2023
  • The Korea Augmentation Satellite System (KASS) system is a Satellite Based Augmentation System (SBAS) under development to provide APV-I SBAS service in the Republic of Korea. The KASS ground segment generates correction and integrity information for GPS measurements of KASS users using the accurate positions of KASS Reference Station (KRS) antenna phase centers. For this reason, the accuracy of KRS reference points through geodetic survey campaigns is one of the important factors for providing the KASS service in compliance with the required navigation performance. In order to obtain accurate positions, two geodetic survey campaigns were performed at several reference points, such as Mark, Center of Mast at Ground Level (CMGL), and Center of Hole in Top Plate (CHTP), of each KRS site using three different survey methods, the Virtual Reference Station (VRS), Flächen Korrektur Parameter (FKP), and raw data post-processing methods. By comparing and analyzing the results, the computed coordinates of the reference points were verified and Antenna Phase Center (APC) positions were calculated using KRS Antenna Reference Point (ARP) data, and the first KASS Site Acceptance Test (SAT#1) was performed successfully using the verified APC coordinates. After the first site survey activities, the KASS operators should maintain the coordinates with the required performance such that the overall KASS navigation performance commitment is guaranteed during the lifetime of 15 years. Therefore, the maintenance plan for the KRS antenna coordinates should be developed before the commissioning of KASS operation planned after 2023. Therefore, this paper presents a geodetic survey method selected for the maintenance activities and provides the rationale for using this method.

시스템 사고를 이용한 국방 사업분석 레버리지 전략 (A Leverage Strategy of the Defense Program Analysis Based on Systems Thinking)

  • 서혁;이상은
    • 한국시스템다이내믹스연구
    • /
    • 제10권1호
    • /
    • pp.77-95
    • /
    • 2009
  • The ever-increasing government budget constraints have led to a continued decline in the increase rate for defense spending, and the government's 5-year National Fiscal Management Plan has served to reinforce the verification and validation procedures for the Force Improvement Programs (FIP) budget requirements and performance. Additionally, as large programs are controlled in accordance with the Total Program Cost Management Guidelines, timely and credible feasibility study and performance measurement need to be conducted. Due to these internal and external circumstances, needs have surged for feasibility and economic effectiveness study for big ticket projects in the FIP sector, with an increasing number of studies conducted by external research institutes. However, questions have been raised regarding the credibility and thoroughness of the program analyses performed by these research institutes due to various restrictions. This paper analyzes and identifies the structural limitations and problems using a systems thinking approach, and examines the systemic characteristics of the program analysis system. It also presents policy intervention recommendations based on the theory of systems thinking, a method to regularize and reinforce the program analysis system. Policy interventions recommended to ensure alignment of the external studies to the clear analysis objectives and resolve the bottlenecks in the external analysis include training those in charge of external study commissioning for a short term intervention, and increasing the number of research institutes and consulting agencies utilizing analysis and evaluation experts who transition to the private sector from the military for a long term intervention. additionally presented are strategies and policy alternatives to best utilize these policy interventions. They will contribute to the stable funding of Force Improvement Programs and efficient utilization of defense budget.

  • PDF