• Title/Summary/Keyword: Placing method

Search Result 426, Processing Time 0.025 seconds

A Study on the Influencing Factors on the Estimation of Compressive Strength by Small Size Core (소구경 코어에 의한 콘크리트 압축강도 추정에 미치는 실험인자의 영향에 관한 연구)

  • 한민철;김기정;백병훈;한천구;송성진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.361-364
    • /
    • 2002
  • This paper discusses the influencing factors such as coring position, height to diameter ratio of core specimen(h/d) and coring torque on the strength estimation of concrete by small site coring method in order to verify the validities of small size core method. According to results, as for the influence of drilling position, when core specimens are obtained from the place parallel to placing direction, compressive strength of core specimens are higher than those perpendicular to placing direction. This is due to the loss of the area of core specimen perpendicular to plating direction by bleeding. And in case of $\phi$ 24mm core specimen, when vertical drilling against placing direction is taken. compressive strength of core specimen obtained at the bottom of the structure is higher than that at the top of the structure. As for the influence of height to depth ratio, as h/d ratio increases compressive strength shows to be decreased. As for the influences of rotation speed of drilling machine, as its speed goes up, compressive strength decreases, regardless of core diameter.

  • PDF

A Study of the Thermal Analysis for the Crack Control of Underground Pier Footing (지하 교각 기초의 온도균열 제어를 위한 수화열 해석 연구)

  • Park, Weon-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.2
    • /
    • pp.91-101
    • /
    • 2006
  • Lately, massive concrete structures are increasingly built. In such massive structures, the heat of hydration of mass concrete causes thermal cracks. To avoid thermal crack, methods widely acceptable for practical use are pre-cooling, pipe cooling and control of placing height. Thermal stress analysis is performed to find the way of controlling the thermal crack of pier footing mat in this paper. The footing mat model for the analysis is $12m{\times}14m$area and 3m height. The analysis results are compared with method of control of lift height and method of pipe cooling. The analysis results show that thermal crack can be removed by method of placing control and pipe cooling at footing mat placed on the ground.

An Elemental Study for construction elevation of a Underground Columns in Top-Down construction Method (TOP-DOWN공법에 의한 지하기둥의 시공성 향상을 위한 기초적 연구)

  • 임형일;박희곤;백민수;조상영;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.1059-1064
    • /
    • 2001
  • This study is about accurate steel column position method in the Top down method's delicate part. When the concrete is placing, it is required that complementary measures to the transformation due to concrete pressure, column buckling, the trouble due to bar net inserting and so on. To solve the problem of exist method, the concrete is placed at the bottom of excavated hole in advance. then, the steel column is inserted into the excavated hole. With a new method try, the problem due to placing pressure and others is could be prevented. In this study, the concrete is examined with test-slump, slump flow, and compressive strength to do quantitative analysis of concrete. The factors of the experiment is plasticizer, retarder addition rate, fly ash substitution rate to cement. Considering of the new method try, the retarder added concrete properties-fluidity, viscosity, strength-is investigated as time lapsing.

  • PDF

Full Scale Tests of Concrete Filled Steel Tube Column using High Fluidity Concrete (고유동 콘크리트를 이용한 콘크리트 충전강관 기둥의 실물대 시공실험)

  • Kim Ook-Jong;Lee Do-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.222-227
    • /
    • 2001
  • Full scale construction tests of CFT(concrete filled steel tube) column to solve construction problem and to confirm quality were performed in apartment site. To improve construction efficiency, the tests has been accomplished two stages after the tests for material mixing design had been completed. In the first stage, the experimental variables were the placing methods, existence of guiding pipe, placing velocity and drop height and the height of specimen were $3.6{\cal}m$. In the second stage, Filling steel tube of 9.6m height with concrete was performed by two ways, that is, the pump-up method and the dropping method. The filled condition of the concrete and concrete strength distribution according to the column height were checked and the quality of the CFT column was confirmed.

  • PDF

Behavior of Steel Box Girder Bridge According to the Placing Sequences of Concrete Slab (II) (강합성 상자형 교량의 바닥판 타설에 따른 거동 연구(II) - 해석적 연구 및 균열제어 -)

  • Kwak, Hyo Gyoung;Seo, Young Jae;Jung, Chan Mook;Park, Young Ha
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.2 s.45
    • /
    • pp.133-142
    • /
    • 2000
  • This study deals with behavior of steel box girder bridges according to the concrete slab casting sequences and sectional types. The time dependent behavior of bridges caused by the differential setting of slab concrete resulting from time gap for each part of slab deck in a sequential placing method produces is analyzed. In correlation studies between girder section types and placing sequences, time dependent effects of concrete creep and shrinkage are implemented in the analytical model proposed in the previous study. Finally, field recommendations in terms of concrete slump and relative humidity are suggested to prevent early transverse cracking of concrete slabs.

  • PDF

A Comparison of the Moving Time about Gantry (겐트리에 대한 구동 시간의 비교)

  • Kim, Soon Ho;Kim, Chi Su
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.6 no.3
    • /
    • pp.135-140
    • /
    • 2017
  • SMT is an equipment that picks up electronic components and does precise placing onto PCBs. In order to do this, it stops in front of a camera installed in the middle to go over vision inspection. And after that it is move for placing. In this paper, We compared to the method of the placing after inspect to the stoped component and the moving component in front of the camera. As a result, This paper shows that the time efficiency of the fly-motion was increased by 9 percent than the stop-motion.

Mock-up Test on the Reduction of Hydration Heat of Mass Concrete for Transfer Girder (전이보 매스콘크리트의 수화열 저감에 관한 Mock-up 실험)

  • Yoon Seob;Hwang Yin Seong;Baik Byung Hoon;Han Cheon Goo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.707-710
    • /
    • 2004
  • This paper reported the results of mock-up test on mass concrete for transfer girder using setting time difference of super retarding agent(SRA). According to test results, two mock-up structures were made. Plain concrete without placing layer reached maximum temperature after 24hours since placement and caused surface hydration cracks at top section. However, concrete with placing layer reached maximum temperature after 72hours and surface temperature was higher than center temperature, which did not cause surface crack. After form removing, no crack was observed at side surface of plain concrete, while concrete using SRA at mid section had surface scaling and settling crack. According to coring results, concrete with placing layer had a penetration crack from top section to bottom section. Therefore, the setting time difference method to reduce hydration heat will have difficulty in applying the mass concrete for transfer girder.

  • PDF

Hydrate Heat Analysis for the Determination of Optimized Thickness in Mass Concrete (매스 콘크리트의 적정 타설높이 산정을 위한 수화열 해석)

  • 신성우;이광수;유석형;김선호;황동규;박기홍
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.385-390
    • /
    • 2001
  • The thermal crack in mass concrete is mainly due to the difference of concrete temperature, which is generated by hydration heat of cement. As the thickness of mat foundation increases, the difference of temperature becomes bigger. The purpose of this study is to estimate the optimum placing depth. The temperature of real mat foundation was observed and the thermal analysis by Finite Element Method was executed. Finally, the crack index according to the placing depth was estimated.

  • PDF

A Study on Construction Method for Joints between Old and New Concrete Deck Slabs (콘크리트 교량 바닥판 신구접합부의 시공방안에 관한 연구)

  • Paek Nak Seung;Choi Young Chul;Cha Soo Won;Oh Byung Hwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.363-366
    • /
    • 2005
  • When widening or repairing concrete deck slab, there is a joint inevitably. However, joining-construction method have following problem, that is the additional stress in existing part of bridge resulting from the specific process of joining-construction and the difference of amount of shrinkage between new and existing bridge. On this study, compared shrinkage stress of the direct joining construction method with the indirect joining construction method, and concluded the proper substitution rate of expansion cement. The rate of replacement was proper at $10\%$. but more than $15\%$, concrete had excessive expansion and weeker compressive strength. The time of placing closure concrete, considering the shinkage stresses and creep, was suitable in $45\~60$ days after placing the new concrete deck slab.

  • PDF

Mobile Augmented Reality for Teaching Bar Placing (철근 배근 교육을 위한 증강현실 컨텐츠 개발)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.471-477
    • /
    • 2018
  • The purpose of this study is to develop an mobile augmented reality for students to learn bar placing work, which is increasingly utilized in the construction field. In order to improve the understanding of the structural drawing, a structural drawing is used as a marker image, and an augmented reality is realized by superimposing a virtual 3D bar placing model that is placed according to the structural drawing on the screen. In addition to the 3D modeling, the contents are developed so as to help students to learn the interpretation method of 2D drawings, the development and splices of reinforcing steel, bar fabricating practice according to KCI structural concrete design code, and the process of bar placing. The results show that the augmented reality is positively evaluated in terms of interface style, perceived usefulness, perceived ease of use, perceived enjoyment, attitude toward using, and intention to use. The augmented reality is worth to be introduced because it has advantages of visualization and interaction in terms of education.