• 제목/요약/키워드: Pilot

검색결과 5,791건 처리시간 0.071초

Building Information Model(BIM) 기반의 건축 구조설계 Pilot Study (The Pilot Study of the structural design based on the Building Information Model(BIM))

  • 신태송;조영상;천진호;엄진업;양종민
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.265-268
    • /
    • 2008
  • With application of IT convergence technique in AEC industry, it is currently conducted the research on the virtual construction system. This paper aims at the pilot study on the structural design based on BIM used in collaboration environment. The work scope of structural design includes the structural analysis model, structural detail model and analytic model and we focuse the research on the interoperability among them. It is partly utilized the transfer module supplied by software developer and partly developed here the interface module through API. This paper shows the interoperability process to pilot test and indicates the problems occurred in interface.

  • PDF

A Efficient Channel Estimation of OFDM Using The Pilot Method

  • Yun, Jin-Nam;Park, Sang-Soon;Baik, Heung-Ki
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 제14회 신호처리 합동 학술대회 논문집
    • /
    • pp.923-926
    • /
    • 2001
  • In this paper, we investigate a new approach pilot-symbol-aided channel estimation for orthogonal frequency division multi-plexing (OFDM) systems. Until now, lots of channel estimation methods are proposed. The pilot symbol assisted modulation (PSAM) has good performance. But, our proposed Algorithm has more good performance than the conventional PSAM system. Our algorithm is that channel estimation performance using the less inserted pilot-symbols systems is almost same to the two times inserted pilot-symbols system. The proposed method is highly robust to fast Rayleigh fading channel. Simulation results are presented to demonstrate the performance of our proposed algorithm.

  • PDF

ONE BIG STEP FORWARD IN THE TELEMATICS REVOLUTION : JEJU TELEMATICS PILOT PROJECT

  • Jang In-Sung;Ryu Jae-Jun;Choi Wan-Sik;Park Jong-Hyn
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2005년도 Proceedings of ISRS 2005
    • /
    • pp.579-581
    • /
    • 2005
  • One of the latest wonders brought to us by ICT(Information and Communication Technology) is telematics turning automobiles, not long ago a mere means of transportation, into a whole-new digital living space. Telematics is indeed fast becoming a household word, and countries around the globe are giving spur to research and development of core technologies to acquire competitiveness in related IT sectors. This paper discusses the telematics pilot project launched in Jeju to promote the development of telematics technology and stimulate related industries. The objective of the pilot project is to give impetus to research in related technologies and a head-start to Korea in the global race in this technology field. The pilot deployment, covering 6 services, promising to be most demanded in Korea's telematics environment, is sure to make a sizeable contribution toward familiarizing the public with the new technology.

  • PDF

Pilot bus를 이용한 지역별 전압 제어 (Regional voltage control using pilot bus)

  • 이호철;송성환;김선교;윤용태;문승일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.210-211
    • /
    • 2006
  • 본 논문은 무효전력 특성에 따라 나누어진 각 지역의 대표 pilot bus 전압을 기준으로 계통 전압을 제어함으로 계통 내에 모든 버스 전압을 통한 제어보다 효율적인 방법을 제시한다. Pilot bus 전압을 기준으로 하는 경우는 계통내 모든 버스의 전압을 기준으로 하는 경우에 비해 필요로 하는 정보의 양이 작을 것이므로 더 효율적이라고 할 수 있다. 본 논문에서는 IEEE 14 버스 시스템에서 특정 상정사고가 일어났을 경우를 가정으로 steady state voltage monitoring and control(SSVMC)를 통한 전압제어 시뮬레이션을 하였다. 모든 버스 전압을 기준으로 한 경우와 pilot bus 전압을 기준으로 SSVMC해준 경우를 비교 제시하였다.

  • PDF

Applications of Diverse Data Combinations in Subsurface Characterization using D-optimality Based Pilot Point Methods (DBM)

  • Jung, Yong;Mahinthakumar, G.
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제18권2호
    • /
    • pp.45-53
    • /
    • 2013
  • Many cases of strategically designed groundwater remediation have lack of information of hydraulic conductivity or permeability, which can render remediation methods inefficient. Many studies have been carried out to minimize this shortcoming by determining detailed hydraulic information either through direct or indirect measurements. One popular method for hydraulic characterization is the pilot point method (PPM), where the hydraulic property is estimated at a small number of strategically selected points using secondary measurements such as hydraulic head or tracer concentration. This paper adopted a D-optimality based pilot point method (DBM) developed previously for hydraulic head measurements and extended it to include both hydraulic head and tracer measurements. Based on different combinations of trials, our analysis showed that DBM performs well when hydraulic head is used for pilot point selection and both hydraulic head and tracer measurements are used for determining the conductivity values.

도심지에서 효율적인 무도갱 2-Arch 터널의 설계사례 (A case study on efficient non pilot 2-Arch Tunnel in the urban)

  • 윤일병;강희준;김홍대;김동식
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.543-552
    • /
    • 2010
  • Due to increase in urban tunnelling as urban population and traffic volume increase, problems related with site security and civil appeal also increase. This paper presents a comparative analysis between conventional 2-arch tunnel method and non-pilot 2 arch tunnel method, which were performed in the basic design of Wie-Rae region. According to the analysis results, non-pilot 2-arch tunnel method is more efficient in terms of stability, constructability, and economic aspect. It is authors' wish that design procedure and method presented in this paper could help the design and construction of non-pilot 2-arch tunnel that should be planned in the near future.

  • PDF

Hybrid Pilot System을 이용한 철도 오염토양 복원 (Remediation of Contaminated Railroad Soils using by Hybrid Pilot System)

  • 박덕신
    • 한국철도학회논문집
    • /
    • 제3권3호
    • /
    • pp.101-108
    • /
    • 2000
  • In this study, we tested hybrid pilot system combined with soil vapor extraction and bioventing methods on the contaminated railroad soil. So, we found out the remediability and operating conditions. Air permeability(k) and gas phase(O$_2$/CO$_2$/VOCs) level trend are very important to determine the remediation rate of the contaminated sites. Throughout hybrid pilot test on different conditions, the range of air permeability(k) was 1985∼1194 darcy. The tests results in hybrid system was appropriate on this test sites, and the suitable injection air flow rate was 3.5㎥/hr. So, we suggested a basic data for the remediation and management of contaminated railroad soil.

  • PDF

FACTS Pilot Plant 도입을 위한 기본 계통 해석 (System Study for FACTS Pilot Plant Application)

  • 김학만;전영환;전진홍;국경수;오태규;이학성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.90-92
    • /
    • 2001
  • This Paper presents a part of system study results for UPFC Pilot Plant application in Korea. The system study includes short circuit rate of Kangjin S/S which is site of UPFC Pilot Plant, ${\Delta}V/{\Delta}Q$ characteristics in STATCOM mode, P and Q flow control boundary of UPFC Pilot Plant. The system study is simulated by PSS/E Ver. 26.

  • PDF

Superimposed Pilot Aided Multiuser Channel Estimation for MIMO-OFDM Uplinks

  • Yang, Qinghai;Kwak, Kyung-Sup
    • ETRI Journal
    • /
    • 제28권5호
    • /
    • pp.688-691
    • /
    • 2006
  • This letter addresses the superimposed pilot aided multiuser channel estimation for the uplinks of multi-input multi-output orthogonal frequency-division multiplexing systems. To mitigate the embedded-data effects on the performance of channel estimation, a novel combining algorithm is proposed. Optimal pilot symbols are developed with respect to the least square channel estimate's mean square error. The averaged sum-capacity lower bound is derived and simulated. Simulation results show that on a low signal-to-noise ratio regime, our proposed scheme achieves better performance and higher capacity than the conventional pilot aided approach.

  • PDF