• Title/Summary/Keyword: Pilot터널

Search Result 60, Processing Time 0.021 seconds

A study on pilot Test of the Composition Presplitting Angle Cut method in tunnel blasting (터널 심발부의 선균열을 이용한 발파공법의 현장시험에 관한 연구)

  • Hwang, Hak;Lee, Tai Ro
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.287-300
    • /
    • 2002
  • Composition Presplitting Angle Cut (COPA-Cut) is a newly developed blasting method for tunnel excavation. Contrary to existing methods, COPA-Cut first creates presplitting by tension crack in cut. In this study, field tests measuring the advance efficiency, noise and ground vibration were performed in order to verify the presplitting effect. To compare the economy and workability, tests were simultaneously performed by COPA-Cut and existing method on the same condition. Results show that COPA-Cut increased advance efficiency and decreased noise and ground vibration. Also, it was confirmed that COPA-Cut is superior to existing method in terms of economy, workability and quality control.

  • PDF

Three Dimensional Dynamic Analysis of Newly Developed Drill and Blast Method with Bi-directions using TBM Pilot Tunnels (TBM 터널을 이용한 이방향 천공 발파공법의 3차원 동적해석)

  • 이찬우
    • Computational Structural Engineering
    • /
    • v.8 no.1
    • /
    • pp.30-38
    • /
    • 1995
  • 이방향 천공 발파공법의 실용성을 입증하여 실시공에 착수하기 위해서는 수치해석을 통하여 사전에 종방향 및 방사방향 천공발파에 따른 지표면에서의 지반진동의 영향을 알아보는 것이 필요하였다. 정확한 현장조건과 발파하중이 주어진 상태에서의 정밀해를 구하기 위해서는 시공상의 발파패턴대로 전체 발파공을 모형화하는 것이 필요하나 앞서 언급한 바와 같이 해석목적상 기존공법과 신공법의 지반응답의 차이를 비교하는 것이 주목적이였기 때문에 해석조건을 동일하게 가정하고 발파공도 대표적인 방향성을 가지는 1개공만을 선택하여 해석을 수행하였다. 기존 종방향 천공 발파공법과 신공법인 이방향 천공 발파공법의 상대적 비교를 위한 3차원 동적 해석결과, 관심의 대상이 되는 터널 직상부의 경우 기존의 종방향 천공 발파에 비해 이방향 천공발파는 진동이 두드러지게 감소함을 알 수 있었으며 이는 발파공의 방향성에 따라 지반응답이 크게 영향을 받는다는 것을 의미한다. 따라서 터널굴착시 문제시 되는 지상구조물의 위치에 따라 발파공의 위치를 적절히 조절함으로써 문제발생 예상지역의 진동치를 감소시킬 수 있을 것이라 판단된다. 그러나 이러한 잇점은 확대발파전 파이롯트 터널이라는 자유공간이 존재할 때만 가능하므로 이방향 천공 발파공법은 TBM의 효용성을 극대화시킨 것이라 할 수 있다.

  • PDF

A Study on the Ground Settlement and Reinforcement Measures in the Case of Tunnelling at the Yangsan Fault (양산단층대 터널시공에서 침하량 및 보강대책에 대한 연구)

  • Jung, Hyuksang;Kim, Hyeyang;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.35-48
    • /
    • 2009
  • An excessive ground displacement occurs with excavating tunnel in a fault zone because the fault has properties of soft ground in generally. It may have had a bad influence to adjacent structure. So, rapid reduction of ground strength by groundwater inflow should be prevented. It must be established for an impervious and reinforcing effect of ground to ensure a tunnel stability. The ground settlement and reinforcing effects were estimated by numerical analyses on tunnel through 570 m sector in Yangsan fault zone of Keongbu high-speed railway. Settlements evaluated by numerical analysis is similar to those calculated by using equation of Loganathan & Poulo. It was shown that reliable estimate of ground settlement by applying a prediction equation is possible. Applicability of adopted tunnel reinforcement method in fault zone was investigated by results of pilot construction and numerical analysis. Results from this study indicate that the adopted reinforcement method make tunnel displacements and member stresses restrain in design criteria.

  • PDF

Case Study on the Tunnel Collapses during the Construction and Application of Geotechnical Investigation (터널 시공 중 지반 관련 사고 사례의 원인 분석과 지반 조사 결과의 활용에 관한 검토)

  • Park, Nam-Seo;Lee, Chi-Mun;Gang, Sang-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1998.04a
    • /
    • pp.47-60
    • /
    • 1998
  • It is considered in this paper that the main causes of tunnel collapse during the construction were the insufficiency of data of geotechnical investigations, or their limits due to special ground condition such as its heterogeneity and anisotropy It is thought that safety of ground can be affected by the geological conditions such as presences of discontinuities in good intact rocks, and considered to be necessary that awareness of the conditions of discontinuities in advance is important to apply adequate reinforcement measures. It is also shown that a serious accident had occurred because of the unawareness of the permeable alluvial deposits at the top of the tunnel. And it is shown that the example of application of the results of geotechnical investigation such as face-mapping, pilot boring etc. during tunnel construction, and a serious deformation of tunnel under special geological condition. Therefore, it is strongly recommended to perform an adequate geotechnical investigation to confirm the geotechnical conditons of ground before design, and supplimentary investigation is also needed depending on conditions for safe and econonic construction.

  • PDF

Review on the application of single-shell tunnel in Korea (싱글쉘 터널의 국내 적용에 대한 고찰)

  • Sangpil Lee;Heesang Ha;Donghyun Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.223-242
    • /
    • 2024
  • Single-shell tunnels, introduced to South Korea in the early 2000s, have not been adopted for the main tunnels of roads or railways over the past two decades despite several attempts starting with the Gwangju City Bypass. This reluctance likely arises from concerns about the long-term performance of supporting materials and the absence of relevant criteria and specifications. However, recent progress, including the incorporation of high-strength shotcrete standards and corrosion-resistant rock bolt specifications, alongside equipment and technique enhancements, necessitates a reassessment of single-shell tunnels. While the single-shell tunnel method offers advantages in environmental impact, construction cost and period compared to the conventional NATM, it is crucial to address the challenges, such as limited design and construction experience, incomplete detailed standards, and insufficient construction specifications, through further research and pilot projects. This paper reviewed the basic principles of single-shell tunnel, current application and research status, technical development trends, criteria and specifications, and remaining challenges. It aims to reignite discussions on the feasibility of applying single-shell tunnels in South Korea.

Evaluation of Drainage System and Coupled Analysis of Heat Transfer and Water Flow for Ice Ring formation in Daejeon LNG Pilot Cavern (대전 LNG Pilot Cavern에서의 배수시스템 평가 및 Ice Ring 형성에 관한 냉열수리 연동해석)

  • Jeong Woo-Cheol;Lee Hee-Suk;Lee Dae-Hyuck;Kim Ho-Yeong;Choi Young-Tae
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.38-49
    • /
    • 2006
  • LNG storage in lined rock cavern demands various techniques concerned with rock mechanics, thermo-mechanics and hydrogeology in design, construction and maintenance stage. LNG pilot cavern was constructed in Daejeon in order to verify these techniques. In this paper, evaluation of drainage system and ice ring formation was studied by numerical simulation. By Modflow analysis in the viewpoint of aquifer and Seep/W analysis in the viewpoint of flow system, it was verified that the drainage system in the pilot cavern was efficiently operated. Since ice ring formation can be simulated by interactive relation between heat transfer and water flow, coupled analysis of those was performed. In this analysis, the position of ice ring was presumed and it was demonstrated that the formation is affected by velocity and direction of groundwater flow.

A Pilot Study of Stiffness Mesurements for Tunnel-Face Materials Using In-hole Seismic Method (인홀 시험을 이용한 터널 막장의 암반강성 측정에 대한 적용성 연구)

  • Mok Young-Jin;Kim Young-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.133-142
    • /
    • 2005
  • The research concentrates on improving the in-hole seismic probe, which has been developed in past five years, to be used in stiffness measurements of tunnel-face materials. The size of probe was reduced to be fit in 45-mm diameter holes (or BX) drilled by a jumbo-drill, which is used to drill holes to install explosives for tunneling. Also trigger system was improved by using a down-speeding motor for operating convenience and air packing system was replaced with a set of plate-springs to eliminate supply of compressed air. These modifications are to adjust the probe for the unfavourable environment inside of tunnels and to test without any further drilling cost. The probe and testing procedure were successfully adopted with horizontal holes drilled by a jumbo-drill at a tunnel-face to evaluate the stiffness of rock mass. The measured shear wave velocities can be used to estimate deformation properties of rock mass for tunnel analyses.

Stablility Analysis of Underground Cold Storage Openings in Shallow Jointed Rocks (천심도 절리 암반 중에 굴착된 지하 냉장저장 공동의 안정성 해석)

  • 김호영;박연준;한공창;박의섭;선경건
    • Tunnel and Underground Space
    • /
    • v.7 no.1
    • /
    • pp.58-64
    • /
    • 1997
  • A pilot plant of underground cold storage for food has been excavated as a R&D program. For the stability assessment of underground cold storage opeinengs in shallow jointed rocks, three kinds of stability problems were analyzed by numerical methods. For the analysis of unstability by rock block movements, DEM was used considering the statistical distribution of rock joints. Concerning thermally induced cracking, FDM was used with thermomechanical stress analysis. Finally, in order to evaluate the joint failure during the thawing process, BE algorithm was applied. Numerical examples applied for the pilot plant show that the possibility of unstable failure of opeings exists but can be avoided with proper rock reinforcements provided.

  • PDF

Development of the catenary system for the narrow tunnel with design speed of 160km/h (160km/h가 가능한 협소터널용 터널가선시스템 설계 및 개발)

  • 권삼영;조용현;창상훈;이희성
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.509-515
    • /
    • 2002
  • While performing the advisory services of the electrification of conventional lines for KTX(Korea High Speed Train), we faced the speed-up problem of catenary system for the existing narrow tunnel. To solve this problem, the new system, to be named "Oblique encumbrance tunnel catenary", was developed. This system is mainly characterized by a simple catenary type, a dual bracket, a oblique encumbrance, a small system height and the same bracket used for the radial tension load and compression one. In this paper, the basic concepts, overall system configuration and main points considered in a design phase for the ′oblique encumbrance tunnel catenary′ are described. Moreover, the detail design criteria and other contents like manufacturing pilot products and verifying the performance through a factory and site test are added.

  • PDF

An experimental study on screw conveyor system of EPB shield TBM (EPB Shield TBM의 스크루 컨베이어 시스템에 관한 실험적 연구)

  • Kim, Sang-Hwan;Kim, Jin-Dae;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.6
    • /
    • pp.519-530
    • /
    • 2011
  • The screw conveyor system installed in EPB Shield TBM chamber was manufactured in small scale for pilot test to investigate the tunnel muck hauling system that could control the earth pressure and support face thrust force. In this experimental study, there were three different test conditions that include screw angles, screw pitch, and screw RPM. Through analysis on test results based on the muck hauling amount per unit time from screw conveyor, the optimum conditions of screw conveyor were proposed to be efficiently performed by the muck processing system. Finally, this study provided the meaningful results such as optimum screw angle, screw RPM, and screw pitch for anti-reverse flow of muck hauling.