1 |
한국터널공학회 (2008), "제3회 터널 기술 강좌", (주)씨아이알, 서울, pp. 27-28.
|
2 |
Bezuijen, A., Schamine'e, P.E.L. (2001). "Simulation of the EPB-shield TBM in model tests with foam as additive". Proceedings of Congress on Modern Tunnelling Science and Technology. Balkema, pp. 935-940.
|
3 |
Borio, L., Peila, D., Oggeri, C., Pelizza, S. (2008). "Characterization of soil conditioning for mechanized tunnelling", ltaly, IATTMED, pp. 8.
|
4 |
Merritt, A., Mair, R.J. (2006). "Mechanics of tunnelling machine screw conveyor: model tests", Geotechnique, Vol. 56, No. 9, pp. 605-615.
DOI
ScienceOn
|
5 |
Merritt, A.S., Mair, R.J. (2008), "Mechanics of tunneling machine screw conveyor: a theoretical model", Geotechnique, Vol. 58, No. 2, pp. 79-94.
DOI
ScienceOn
|
6 |
Peron, J.Y., Marcheselli, P. (1994), "Construction of the passante ferroviario link in Milan, Italy. Lots 3P, 5P, and 6P: Excavation by large EPBS with chemical foam injection", Proceedings of Tunnelling 94, IMM, London, pp. 679-707.
|
7 |
Yu, Y., Arnold, P.C. (1995), "Estimate of the volumetric efficiency of a screw feeder", Proceedings of the 5th International Conference on Bulk Material Storage, Handling and Transportation, Newcastle, Australia, pp. 517-522.
|
8 |
Yu, Y., Arnold, P.C. (1997), "Theoretical modeling of torque requirements for single screw feeders", Powder Technology, Vol. 93, pp. 151-162.
DOI
ScienceOn
|
9 |
社団法人 地盤工学会. (1997), シールド工法の調査、設計から施工まで, 日本, pp. 145.
|