• Title/Summary/Keyword: Pile Driving

Search Result 186, Processing Time 0.021 seconds

Drivability Monitoring of Large Diameter Underwater Steel Pipe Pile Using Pile Driving Analyzer. (수중 대구경강관말뚝의 항타관입성 모니터링을 위한 PDA 적용 사례)

  • Kim, Dae-Hak;Park, Min-Chul;Kang, Hyung-Sun;Lee, Won-Je
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.11-19
    • /
    • 2004
  • When pile foundation constructed by driving method, it is desirable to perform monitoring and estimation of pile drivability and bearing capacity using some suitable tools. Dynamic Pile Monitoring yields information regarding the hammer, driving system, and pile and soil behaviour that can be used to confirm the assumptions of wave equation analysis. Dynamic Pile Monitoring is performed with the Pile Driving Analyser. The Pile Driving Analyser (PDA) uses wave propagation theory to compute numerous variables that fully describe the condition of the hammer-pile-soil system in real time, following each hammer impact. This approach allows immediate field verification of hammer performance, driving efficiency, and an estimate of pile capacity. The PDA has been used widely as a most effective control method of pile installations. A set of PDA test was performed at the site of Donghea-1 Gas Platform Jacket which is located east of Ulsan. The drilling core sediments of location of jacket subsoil are composed of mud and sand, silt. In this case study, the results of PDA test which was applied to measurement and estimation of large diameter open ended steel pipe pile driven by underwater hydraulic hammer, MHU-800S, at the marine sediments were summarized.

  • PDF

Analysis of Dynamic Behavior of Pile Driving (타입말뚝의 동적거동 분석)

  • 조천환;이명환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.11a
    • /
    • pp.27-52
    • /
    • 2002
  • Pile driving formula, wave equation analysis of pile driving(WEAP) and dynamic pile loading test have been known to useful tools to appraise the behaviour of pile driving. This paper reviews basic theories of three methods and gives some suggestions to apply them to practice. And also some cases on application of the methods to the sites are discussed in this paper. It appears that it is inevitable for engineers to be experienced well so that the methods can be regarded as useful tools.

  • PDF

A case study on the evaluation of pile damage during driving by PDA testing. (PDA 시험을 이용한 말뚝손상 판단에 관한 사례 연구)

  • 송명준;박영호;이영남
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.334-341
    • /
    • 2002
  • Nowadays, owing to the development of analysis techniques for PDA test, we can evaluate the serious damage of pile during driving in site. In this study, we checked the damage of pile by pulling it out after evaluation of the pile damage during driving by PDA testing. After that, almost damaged pile was checked and the outline depth of damage could be verified. To increase the quality of driven pile, we have to increase the number of PDA testing for drivability analysis with checking the damage especially for preliminary pile driving and dynamic load test for checking the bearing capacity and consider the application of driving by energy monitoring.

  • PDF

Reliability of Pile Driving Formula (항타공식의 신뢰도)

  • 박영호;김경석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.209-216
    • /
    • 1999
  • Prefabricated piles used for construction of highway bridges are most of steel pipe piles and few of prestressed concrete piles. Its installation and inspection are less controllable and have much uncertainty due to changes in subsoil and groundwater conditions. However, most of these piles have been controlled using outdated pile driving formula such as Hiley's formula which models just the energy conservation due to its simple applicability in the field. This formula results in overstriking or sometimes understocking due to buckling of pile head. Engineers cannot ensure by the formula whether pile is installed properly. To compensate the drawbacks of excising pile formula, parameters in Hiley's formula and 55 formula are reviewed. Final sets used in pile formula and PDA test results(E.O.I.D) are measured during pile driving along the depth. These measured results along the depth were compared with each other and with N values, so that relations between the each result could be inferred. Also the factor of safety which can be used for pile driving formula are suggested.

  • PDF

Prediction of Pile-Driving Resistance by the Wave Equation and Residual Stress (파동방정식 및 잔류응력에 의한 항타지대력 추정)

  • 황정규
    • Geotechnical Engineering
    • /
    • v.2 no.3
    • /
    • pp.15-26
    • /
    • 1986
  • A great number of different pile-driving formulas are widely used to determine the load-carr-ying capacity during driving. However, engineers have been unable to agree on any particular pile.driving formula because the mechanisms of pile driving action which involves many complications such as hammer-pile-soil interaction could not be solved completely in any practical manner. This paper is presented for the purpose of giving field engineers a reliable analytical procedures for the prediction of pile.driving resistance without resort to electronic computers based on the theory of longitudinal wave transmission in conjunction with the wave equation and on the consideration of the effect of residual stresses induced by reversed friction in pile.

  • PDF

Pile and Ground Responses during Driving of a Long PHC Pile in Deep Soft Clay (대심도 연약지반에서 장대 PHC말뚝의 항타에 따른 지반과 말뚝거동)

  • Kim, Sung-Ryul;Dung, N.T.;Chung, Sung-Gyo
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.131-141
    • /
    • 2007
  • Because pile behavior is governed by geotechnical characteristics of surrounding soils, it is therefore necessary to monitor ground responses during pile driving and analyze the relation between the behaviors of pile and ground. In this research, the 57 m long PHC pile was driven into deep soft clay in the Nakdong River estuary area. During and after the pile driving, the ground responses and the residual load of pile have been monitored for about a year, by using piezometers, inclinometers, level posts for surface settlement, and strain gauges in piles etc. As the results, the residual load by the negative skin friction along the pile increased with the dissipation of the excess pore pressure, which was developed by pile driving and reclamation. About 30% of the maximum residual load developed due to the dissipation of the increased excess pore pressure during the driving. It is thus emphasized that most piles driven in clay deposits need to be designed by considering negative skin friction along the pile.

A new proposal for the appropriate quality control of driven piles by using set values (최종관입량을 기준으로 한 합리적인 말뚝 시공관리 방안)

  • 이명환;홍헌성;김성회;전영석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03a
    • /
    • pp.51-63
    • /
    • 2000
  • Because of simplicity and easiness, dynamic pile driving formulae have long been used by most of the field engineers for pile quality control purposes. Yet their reliability have been repeatedly reported unsuitable and the results can lead to significant errors. According to the research results by the authors, the two most important sources of unreliability of dynamic pile driving formulae are uncertainty in the estimation of hammer efficiency and time dependent characteristics of pile bearing capacity. Based on this finding a new method is proposed. By using the actual value of hammer efficiency the pile bearing capacity at the time of driving could be reasonably estimated. By performing restrike test sometime after pile installation, time effect coefficient could be determined. The effectiveness of the proposed method was proven in the actual construction project.

  • PDF

JV Rock Driving Method (JV 공법)

  • Kim, Kwang-Il;Inoue Hajimu;Toshio Teraoka;Yeo, Byung-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.41.1-44
    • /
    • 1995
  • The JV method is an epochal civil engineering style that boasts of significant pile driving power through low-vibration works by ideally combining the high pressure water injected from the water jet cutter and the vibrations combining from the vibratory pile driver extractors. As a result, you are ensured stable and safe pile driving and extraction in bedrocks that were previously impossible with conventional machines and methods. The other advantage is its high performance and a low-pollution characteristis that is ensured by suppressing ground vibrations. This is a very important factor since it often becomes an issue upon civil engineering in the city. With the addition of this method. the range of steel pipe pile, steel sheet pile and other steel pile use has been drastically expanded. Other advantages of this method incldes accurate works, shortening of the construction period and improved work performance. Since the minimun amount of high pressure water is used to drill the ground, it not only loosens the ground, but also cuts the ground at the tip of the pile to improve driving works.

  • PDF

Characteristics of Bearing Capacity and Reliability-based Evaluation of Pile-Driving Formulas for H Pile (H-pile의 지지력 특성 및 동역학적 공식의 신뢰도 평가)

  • 오세욱;이준대
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.1
    • /
    • pp.81-88
    • /
    • 2003
  • Recently, pile foundations were constructed in rough or soft ground than ground of well condition thus it is important that prediction of ultimate bearing capacity and calculation of proper safety factor applied pile foundation design. This study were performed to dynamic loading tests for the thirty two piles at four different construction sites and selected pile at three site were performed to static loading tests and then compare with measured value and value of static and dynamic loading tests. The load-settlement curve form the dynamic loading tests by CAPWAP was very similar to the results obtained from the static load tests. Based on dynamic and static loading tests, the reliability of pile-driving formula were analyzed and then suggested with proper safety factor for prediction of allowable bearing capacity in this paper.

Estimating of Optimal Allowed Distance for Reducing Vibration and Noise Problems by Pile Driving after Drilling Method in Deep Foundation Work (천공 후 말뚝타격공법의 진동 $\cdot$ 소음 문제 해소를 위한 적정 이격거리 산정 방안 연구)

  • Park Hong-Tae;Kang Lee-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.152-163
    • /
    • 2005
  • Pile driving work causes a vibration problem in the construction site using pile foundation and often causes civil affairs by construction noise around the construction site. For the vibration and noise problems, the driving after drilling method rather than the direct driving method is being generalized for reducing vibration and noise. However, this method also causes civil affairs when the driving work is operated in adjacent area. This study suggests a criterion for evaluating an optimal allowed distance for pile driving work by the driving after drilling method. Actual surveys of vibration and noise for pile driving work in seven construction sites were used for developing regression analysis equations. The results can be a standard to estimate the allowed distance to avoid vibration and noise problems in pile driving work for deep foundation.