• Title/Summary/Keyword: Performance-based Project Delivery System

Search Result 19, Processing Time 0.028 seconds

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

A Study about Improvement Idea for Performance-based Project Delivery system (성능발주방식의 개념 정의 및 활용방안에 관한 연구 - 공동주택 성능표시 제도를 바탕으로 한 발주자를 위한 체크리스트 -)

  • Lee, Ha-Seung;Baek, Hun-Ku;Shin, Seung-Ha;Lee, Jung-Won;Kim, Kyung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.634-637
    • /
    • 2008
  • Performance-based Project Delivery System(PPDS) is one of Project Delivery System that when owner ask for performance than constructor feel free to choose materials, technology, an engineering method. PPDS rank higher position than Performance Warranty Contract and Technical Proposal Bid. This study aims to propose Improvement Idea for PPDS that based Housing Performance Grading Indication System. 'Request-performance Checklist' is used as communication means(between owner and constructor) and a kind of corroborative facts make the procedures achievement of project like contract easier.

  • PDF

Development of ROS2-on-Yocto-based Thin Client Robot for Cloud Robotics (클라우드 연동을 위한 ROS2 on Yocto 기반의 Thin Client 로봇 개발)

  • Kim, Yunsung;Lee, Dongoen;Jeong, Seonghoon;Moon, Hyeongil;Yu, Changseung;Lee, Kangyoung;Choi, Juneyoul;Kim, Youngjae
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.4
    • /
    • pp.327-335
    • /
    • 2021
  • In this paper, we propose an embedded robot system based on "ROS2 on Yocto" that can support various robots. We developed a lightweight OS based on the Yocto Project as a next-generation robot platform targeting cloud robotics. Yocto Project was adopted for portability and scalability in both software and hardware, and ROS2 was adopted and optimized considering a low specification embedded hardware system. We developed SLAM, navigation, path planning, and motion for the proposed robot system validation. For verification of software packages, we applied it to home cleaning robot and indoor delivery robot that were already commercialized by LG Electronics and verified they can do autonomous driving, obstacle recognition, and avoidance driving. Memory usage and network I/O have been improved by applying the binary launch method based on shell and mmap application as opposed to the conventional Python method. Finally, we verified the possibility of mass production and commercialization of the proposed system through performance evaluation from CPU and memory perspective.

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

A Study on the ITIL Management Model Based on the IT Governance for Public Sector (공공부분을 위한 IT 거버넌스 기반의 ITIL 관리 모델에 관한 연구)

  • Kim, Sang-Gil;Kim, Jin-Young;Park, Yeung-Gyu
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.4
    • /
    • pp.490-505
    • /
    • 2014
  • IT governance in order to achieve the strategic goals of the organization, leadership, organizational structure, and the process is defined. In order to achieve IT governance, organizational structure, leadership for spindle formation, maintenance, and standardized processes to specific and an effective ITIL (Information Technology Infrastructure Library) management model is needed. In this study, the K Authority Management Model of IT Governance ITIL - based research on service delivery and customer satisfaction through the effective information for ITSM (Information Technology Service Management, IT Service Management) building measures, information for business planning and performance management PMS (Project Management System, project Management System), survey on ICT service levels established through the process of planning and construction management models such as ITIL future research on the public portion of the proceeds from the ITIL management model can be utilized as a guideline when establishing a theoretical presents a base.

Conveyor Capability Simulation for Semiconductor Diffusion Area (반도체 확산공정에서의 컨베이어 적정속도와 길이를 구하는 시뮬레이션)

  • 박일석;이칠기
    • Journal of the Korea Society for Simulation
    • /
    • v.11 no.3
    • /
    • pp.59-65
    • /
    • 2002
  • Semiconductor wafer fabrication is a business of high capital investment and fast changing nature. To be competitive, the production in a fab needs to be effectively planned and scheduled starting from the ramping up phase, so that the business goals such as on-time delivery, high output volume and effective use of capital intensive equipment can be achieved. Project executed that use conveyor in bay semiconductor A line. But conveyor capability is lacking and rundown happened in equipment. Do design without normal simulation and conveyor system failed. The comparison is peformed through simulation using .AutoMod a window 98 based discrete system simulation software, as a tool for comparing performance of proposed layouts. In this research estimate optimum conveyor capability, there is the purpose.

  • PDF