• Title/Summary/Keyword: Performance Management System

Search Result 6,352, Processing Time 0.034 seconds

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

A Development of the Performance Measurement System for Safely Management (안전관리 성과측정 시스템 개발)

  • 이영순;김용수;박교식;김형석
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.157-162
    • /
    • 2000
  • A performance measurement system for safety management was suggested with which performance of a company's safety activities can be expressed rationally, and analysis of impact with performance improvement. A key of the measurement system is performance index of the safety management activities, which consists of 3 perspectives; an external perspective, an internal perspective, and a innovation & learning perspective. Every perspective consists of 18 performance indices and each indices consist of activity unit a such planning, support, implementation, evaluation and review.

  • PDF

A Study on the Method for Promoting Acceptance on Performance Management : Focusing on the Public Enterprises Practices (성과관리의 수용성 제고 방안 : 공기업사례를 중심으로)

  • Kim, Youn Sung;Yoo, Hong Sung;Kim, Sun Cheol
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.40 no.1
    • /
    • pp.185-198
    • /
    • 2015
  • This study drew performance management factors analyzed a causal link between acceptance and satisfaction of performance management to present the method for promoting acceptance on the performance management system that most of the public enterprises, government-affiliated organizations are implementing. To achieve this, qualitative analysis and quantitative analysis were conducted in parallel through in-depth case studies and surveys. The results of this study are as follows. First, the analysis of the performance management factors with preceding studies shows that performance management indicators, performance management operations and performance management communications. Second, from the causal relationship of performance management factors affecting performance management acceptance reveals that performance management operation has statistical significance. Third, the analysis of the effect of performance management factors on the management satisfaction shows that operation and indicator of the performance management have statistical significance and reflecting the performance indicators to business, adequacy of target level, training, system support and CEO's Leadership have been revealed as important variables to the management satisfaction. Fourth, the result of the analysis on casual connection between acceptance and satisfaction of the performance management shows that improving management acceptance has a direct impact on satisfaction because performance management receptiveness were deemed statistically significant. Fifth, the result of the in-depth case studies on improving performance management acceptance shows that public enterprises have been putting in an effort to design indicators and try to encourage internal member's involvement during the monitoring and evaluation. The quantitative analysis based on survey has turned out that performance management operation and performance management indicators have statistical significance. The qualitative analysis by in-depth analysis shows that public enterprises put a lot of effort to performance management indicators and communication between internal members. As a result, commitment to performance management operation is required to improve the performance management acceptance. In other words, a detailed implementation plan for training, information system support, and CEO's leadership has to be established and ought to be pushed.

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

The Case Study on The Introduction and Practical Application of the Budget Management System -On the Performance Measurement of Standard Work Unit- (예산관리제도의 도입과 실제적 운용에 관한 사례연구 -표준적인 작업의 성과측정을 중심으로-)

  • 윤용운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.39-51
    • /
    • 1979
  • In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.

  • PDF

Mediating Effect of Change Management Activity on the Relationship between the Role of Participants of ERP Implementation and System Performance (ERP 구현의 참여자 역할과 시스템 성과 간의 관계에 있어 변화관리 활동의 매개 효과에 관한 연구)

  • Chang, Hwal-Sik;Oh, Jeong-Eun;Choi, Yoo-Jung;Han, Jung-Hee
    • The Journal of Information Systems
    • /
    • v.16 no.4
    • /
    • pp.75-106
    • /
    • 2007
  • The purpose of this research is to identify a mediating effect of change management activity(CMA) on the relationships between the role of participants of ERP implementation and system performance. In this paper the role of participants are composed of top's management, user's participation, project manager's skill. Also this research organized ERP system performance into the three dimensions(adaptation to the end-user's ERP system, system usage, individual's performance). The major results of this research can be summarized as follow; project manager's role, top management's involvement, and users' participation in ERP project directly affect CMA of system implementation process and have influence system performance through CMA too. CMA also has a positive effect on a series of system performance, that is, adaptation to the end-user's ERP system, system usage, and individual's performance. In conclusion, the role of participants have an considerable influence upon system performance through CMA. This research makes certain that a mediating effect of CMA between the role of participants and system performance exists. Therefore, the companies implementing ERP must consider CMA.

  • PDF

The Effect of Quality Management System of Small and Medium Manufacturing Companies on Management Performance in the Age of Digital Transformation: Focusing on the Leadership Mediation Effect (디지털 전환시대에 중소제조기업의 품질경영시스템이 경영성과에 미치는 영향: 리더십 매개효과를 중심으로)

  • Lee, JuYong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.18 no.1
    • /
    • pp.163-177
    • /
    • 2022
  • The purpose of this study is to analyze the impact of quality management system requirements, which are techniques for management innovation to secure competitiveness of small and medium-sized manufacturers, on management performance as economic uncertainties increase and non-face-to-face culture spread. To this end, a survey was conducted on small and medium-sized manufacturing companies that maintain ISO certification. As a result of the study, first, it was found that planning had a positive effect on management performance among the requirements of the quality management system. Second, it was found that improvement among the requirements of the quality management system had a positive effect on management performance. Third, in the relationship between the requirements of the quality management system and management performance, leadership was found to have a complete mediating effect on planning. This means that the CEO plays a large role in establishing strategies for companies to gain a competitive advantage and will contribute to establishing all measures.

A Case Study on the Implementation of Management System for Information Systems Operational Performance (정보시스템 운영성과 관리시스템 구축에 관한 사례연구)

  • Lee, Yong Geun;Hwang, K.T.
    • Journal of Information Technology Applications and Management
    • /
    • v.24 no.1
    • /
    • pp.63-79
    • /
    • 2017
  • This study is a subsequent research results of Lee and Hwang (2015) and presents results of the case in which an information system is developed and applied for the performance management scheme proposed by the early study. This study aims to provide the organizations that want to implement and apply an effective IS operational performance management scheme with the practical alternatives that they may consider. This study first summarize the major contents of the performance management scheme proposed by the early study. Then, the processes and detailed contents in which an information system is developed in order to operate and improve the performance management scheme. The specific contents provided by the study include the system development environments and methods, system architecture, and application structure. Finally, this study summarizes the major results of the study and suggests future research directions.

A Study of the Green Management Requisites Effect on Corporate Performance (녹색경영 구성요소가 기업성과에 미치는 영향에 관한 연구)

  • Ko, Young-Hak;Chung, Young-Bae;Yoo, Woo-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.93-100
    • /
    • 2012
  • The purpose of this study is to present the green management requisites effect on corporate performance. Corporate performance consists of customer and green performance, work satisfaction and financial performance. In order to carry out this research we obtained 175 survey sheets, inspect the twelve assumptions focused on reliability, appropriateness of the model. Validation results of hypothesis are summarized as follows. First, the green management components : system, resource/energy affect significantly to the customer and green performance. Second, the green management components : system, resource/energy influence significantly to work satisfaction. Finally, the strategy has on effect to the financial performance. This paper shows that the green management requisites have an effect on the corporate performance directly and significantly.

Development of a Performance-Based Supply Chain Management System (지표기반 공급사슬 성과관리 시스템을 활용한 효과적인 공급사슬관리)

  • Min, Dae-Gi;Park, Jong-Duck
    • IE interfaces
    • /
    • v.16 no.3
    • /
    • pp.382-391
    • /
    • 2003
  • Supply chain performance management is the essential part of various business activities in supply chain management area, and integrating it with general business management improves the supply chain performance. Although supply chain performance management is important and expected of market growth, there are few researches on this area and lack of practical applications. To resolve these problems, this paper presents a new performance management methodology for a supply chain integrating SCOR (Supply Chain Operational Reference) model and Balanced Scorecard (BSC). And we develop a framework of the Supply Chain Performance Management System (SCPMS) based on this methodology, and implement a prototype system.