Pavement management systems require systematic monitoring of pavement surfaces to determine preventive and corrective maintenance. The process involves the accumulation of large amounts of visual data, typically obtained from site visitation. The pavement surface condition is then correlated to a pavement distress index that is based on a scoring system previously established by state or federal agencies. The scoring system determines if the pavement section requires maintenance, overlay or reconstruction. One of the surface distresses forming part of the overall pavement distress index is the Alligator Crack Index (AC Index). The AC Index involves the visual evaluation of the crack severity of a section of a pavement as being low, medium, or high. This evaluation is then integrated into a formula in order to obtain the AC Index. In this study a quantification of the visual evaluation of the severity of alligator cracking is carried out using photographs and the fractal dimension concept from fractal theory. Pavements with low levels of cracking were found to have a fractal dimension equal to 1.051. Pavements with moderate levels of cracking had a fractal dimension equal to 1.1754. Pavements with high degrees of cracking had a fractal dimension that varied between 1.5037 (high) and 1.7111 (very high). Pavements with a level of cracking equal to 1.8976 represented pavements that disintegrated and developed potholes. Thus, the visual evaluation of the state of cracking of a pavement (the AC Index) could be enhanced with the use of the fractal dimension concept from fractal theory.
Proceedings of the Korean Geotechical Society Conference
/
2002.10a
/
pp.188-200
/
2002
In this study, a pavement evaluation method is introduced by a case study of the measurement data obtained in Incheon International Airport. Based on the results obtained by both visual inspection and automobile inspection equipments, the pavement surface condition is evaluated and used for maintenance and rehabilitation strategy for pavement. In addition, the special attention was given to the back calculation and solution technique of E-modulus by FWD's deflection data in Pavement.
Periodical evaluations of the airfield pavement are necessary to provide the ability for the existing pavement to support the increasing volume of air traffic. Also, the evaluation of the existing Pavement condition is necessary for the decision of the maintenance strategy. For this reason, airport pavements in Korea have been evaluated every five years currently. It was known, however, that the current pavement evaluation methodology was not logical and practical. The purpose of this study is to compare the current pavement evaluation method with design chart to the mechanistic approach used in other advanced countries. As a result of this study the mechanistic approach is found to be more logical than the current method.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.3
/
pp.467-475
/
2018
The purpose of this study is to propose the evaluation criteria of asphalt pavement condition in narrow regional road considering the traffic environment in order to reduce road budget of local governments. In general, narrow regional roads are considered relatively less important because they have low travel speed and low traffic volume of heavy-vehicle. Generally, automatic surveying equipment is used for investigations of pavement condition, but the operating costs are not efficient for the narrow regional roads because the cost is too high. This study presents the pavement condition evaluation index suitable for narrow regional roads. In this study, the pavement condition evaluation index is presented considering the traffic environment of narrow regional roads. The pavement condition were classified into three classes based on the crack measured by visual inspection, and the validity of the pavement condition evaluation index presented through the expert's questionnaire survey was examined. Pavement condition for the narrow regional roads was classified into three grades based on the index values calculated by visual inspection. Expert's surveys were conducted to evaluate the validity of the proposed pavement condition evaluation. The proposed evaluation index shows a high correlation with questionnaire survey result ($R^2=0.88$). The proposed evaluation index which is obtained through visual crack inspection under limited conditions can be applied to narrow regional roads. In addition, it is expected that it will be effective not only for road management but also for road management budget by more economical evaluation method of pavement condition.
PURPOSES : This study aims to evaluate the performance of interlocking block pavement system for low speed highway. METHODS : Through on-site monitoring, environmental impact assessment of interlocking block pavement such as heat island reduction, traffic safety, noise pollution were evaluated as compared with asphalt pavement. Also the pavement condition and roughness were evaluated according to performance period. RESULTS : Surface temperature of interlocking block pavement was about 7 degree lower than asphalt pavement in midsummer. Compared to asphalt pavement, vehicle speed reduction effect of interlocking block pavement was about 2kph. For low speed driving, the noise pollution was measured at a similar level for both asphalt and interlocking block pavement. After 42month service period, the breakage of block was only 0.24% for the whole surveyed area. IRI of interlock block pavement was estimated within the range of 5~8m/km. CONCLUSIONS : Depending on the performance monitoring results such as heat island reduction, providing traffic safety and keeping a good pavement condition for a long service period, it assures that interlocking block pavement was applicable for low speed road.
Proceedings of the Korean Geotechical Society Conference
/
2008.03a
/
pp.1417-1421
/
2008
Temperature variation affect the response of asphalt pavement and should be considered in the evaluation of performance of the pavement. In this paper, HWAW method is applied to evaluate shear wave velocity(or shear modulus) of the asphalt pavement with temperature. HWAW method which is based on time-frequency analysis using harmonic wavelet transform have been developed to determine phase and group velocities of waves. This method minimize effect of noise and is not affected by mode jump effect which cause erroneous result when surface wave method is applied to pavement evaluation. In order to estimate the applicability of HWAW method, field tests were performed in 1 site and preliminary correlation between shear wave velocity(shear modulus) and asphalt pavement average temperature.
OBJECTIVES : This study develops an evaluation method, which is useful to inspect pavement condition of specific boroughs. This is because pavement condition is broadly divided into five grades via visual inspection, which does not consider the types of deteriorations, and is decided by an investigator having a subjective viewpoint. This visual inspection method is not a satisfactory method for accurate maintenance when various deteriorations occur. METHODS : The performance model considers several factors such as crack, rutting, and IRI. This method is also modified from borough SPI based on SPI (Seoul Pavement Index). Considering limited budget of borough, PI (prediction index) is suggested, which is related to the grade of pavement condition evaluation and type of materials. Practical correlation review is also conducted with statistical verification by using the Monte Carlo simulation. RESULTS : The results of the study show that modified criteria are reasonable. First, the comparison between the visual inspection result and the SPI result indicates that the R-square value is sufficiently high. Second, through the common section, each evaluation method could be compared, and the result shows considerable similarity, which increases when the range is modified. Finally, PI for predicting remaining life and the random number SPI have common parts, which means that each indicator would be adequate to be used as an evaluation method. CONCLUSIONS : Comparison and analysis results show that the developed evaluation method is reasonable for specific boroughs where financial support is inadequate for the evaluation process by using the newer equipment. Moreover, for more accurate evaluation method, previous visual inspection data should be utilized, and the database of inspection equipment have to be collected.
PURPOSES : The permeable pavement type has been rapidly developed for solving problems regarding traffic noise in the area of housing complex and heavy rainwater drainage in order to account for the climate change. In this regards, the objective of this study is to figure out the characteristics of pavement types. METHODS : The laboratory test for deriving optimum asphalt content (OAC) was conducted using the mixtures of the permeable asphalt surface for the pavement surface from Marshall compaction method. Based on its results, the pavement construction at the test field was conducted. After that, the site performance tests for measuring the traffic noise, strength and permeability were carried out for the relative evaluation in 2 months after the traffic opening. The specific site tests are noble close proximity method (NCPX), Light falling deflectometer test (LFWD) and the compact permeability test. RESULTS : The ordered highest values of the traffic noise level can be found such as normal dense graded asphalt, drainage and porous structure types. In the results from LFWD, the strength values of the porous and drainage asphalt types had been lower, but the strength of normal asphalt structure had relatively stayed high. CONCLUSIONS :The porous structure has been shown to perform significantly better in permeability and noise reduction than others. In addition to this study, the evaluation of the properties and the determination of the optimum thickness for the subgrade course under the porous pavement will be conducted using ground investigation technique in the further research.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.1D
/
pp.63-72
/
2009
This study aims at establishing the decision-making support system for the highway assets, long-term performance presumption and evaluation of asset value, which are appropriate for Korea, and proposing the methods of the optimal engineering method and the timing decision for the preventive maintenance through the project evaluation, the optimization method and life-cycle analysis related to the highways. In order to supplement the current problem of the near-sighted budget management system, which chooses the maintenance place of the highway, depending on the level of the budget with fixed amount, the long-term required budget prediction system and the economy principle were introduced, so that the pavement agency can predict the level of the required budget, and it was aimed to develop the pavement asset evaluation system to maintain the performance of the highway with the minimum of the cost. In the use of the highway pavement asset evaluation system, to maintain the appropriate level of the pavement evaluation index, when the budget was efficiently established in the reference of the required maintenance budget for the chosen section of the highway in the year concerned, it was possible to analyze the most rational pavement maintenance budget. With this result, it is estimated to prevent the unnecessary waste of budget in advance, and through the development of the decision-making system for the long-term performance presumption and the asset value estimation of the pavement, it is expected to able to analyze the previous evaluation of the project related to the highway and the feasibility of introduction.
Pavement evaluation is a fundamental component for rational pavement management. Optimal rehabilitation method and the priority of rehabilitation should be based on the evaluation data. Some types of pavement condition index are needed for objective evaluation of Pavement condition and management of road network. In this study a expressway concrete pavement condition index model is developed through regression analysis that correlates panel rating with distress measurement from the test sections. The derived condition index can be used for network level PMS for the expressway concrete pavement. Correlation coefficient of the model was 0.68. The selected independent variables were International Roughness Index, crack and area of patching.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.