• Title/Summary/Keyword: Path Interval

Search Result 122, Processing Time 0.026 seconds

CNC Tool Path Planning for Free-Form Sculptured Surface with a New Tool Path Interval Algorithm (새로운 공구경로간격 알고리듬을 이용한 자유곡면에서의 CNC 공구경로 계획)

  • Lee, Sung-Gun;Yang, Seung-Han
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.6
    • /
    • pp.43-49
    • /
    • 2001
  • A reduced machining time and increased accuracy for the sculptured surface are very important when producing complicated parts. The step-size and tool-path interval are essential components in high speed and high resolution machining. If they are small, the machining time will increase, whereas if they are large, rough surfaces will be caused. In particular, the machining time, which is key in high speed machining, is affected by the tool-path interval more than the step-size. The conventional method for calculating the tool=path interval is to select a small parametric increment of a small increment based on the curvature of the surface. However, this approach also has limitations. The first is that the tool-path interval can not be calculated precisely. The second is that a separate tool-path interval needs to be calculated in each of the three cases. The third is that the conversion from Cartesian domain to parametric domain or vice versa must be necessary. Accordingly, the current study proposes a new tool-path interval algorithm that do not involve a curvature and that is not necessary for any conversion and a variable step-size algorithm for NURBS.

  • PDF

Conditions for Disjoint Path Coverability in Proper Interval Graphs (진구간 그래프의 서로소인 경로 커버에 대한 조건)

  • Park, Jung-Heum
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.34 no.10
    • /
    • pp.539-554
    • /
    • 2007
  • In this Paper, we investigate conditions for proper interval graphs to have k-disjoint path covers of three types each: one-to-one, one-to-many, and many-to-many. It was proved that for $k{\geq}2$, a proper interval graph is one-to-one k-disjoint path coverable if and only if the graph is k-connected, and is one-to-many k-disjoint path coverable if and only if the graph is k+1-connected. For $k{\geq}3$, a Proper interval graph is (paired) many-to-many k-disjoint path coverable if and only if the graph is 2k-1-connected.

The Singular Position Detection Method from the Measured Path Loss Data for the Cellular Network (이동 통신 망에서 측정하여 계산된 경로 손실의 급격한 변동 위치 추출 방법)

  • Park, Kyung-Tae;Bae, Sung-Hyuk
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.15 no.1
    • /
    • pp.9-14
    • /
    • 2014
  • The path loss data was re-calculated according to the distance between the base station and a mobile station in the mobile telecommunications network. In this paper, the averaged path loss data was plotted with the conventional path loss models(free space, plane earth, Hata model ${\ldots}$). The standard deviations for the 2 Km, 1 Km, 0.5 Km-interval averaged path loss were 2.29 dB, 3.39 dB, 4.75 dB, respectively. Additionally, the derivative values for the 2 Km, 1 Km, 0.5 Km-interval averaged path loss were evaluated to find the positions with more than 1 times or 2times of the standard deviation. The situations with the sharply fluctuated path loss were calculated to 5 positions in the 2 Km interval, to 7 positions in the 1 Km interval, to 19 positions in the 0.5 Km interval, respectively. And, the exact distances between the base station and a mobile station were found with the sharply fluctuated path loss.

A Heuristic Algorithm to Find the Critical Path Minimizing the Maximal Regret (최대후회 최소화 임계 경로 탐색 알고리듬)

  • Kang, Jun-Gyu;Yoon, Hyoup-Sang
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.90-96
    • /
    • 2011
  • Finding the critical path (or the longest path) on acyclic directed graphs, which is well-known as PERT/CPM, the ambiguity of each acr's length can be modeled as a range or an interval, in which the actual length of arc may realize. In this case, the min-max regret criterion, which is widely used in the decision making under uncertainty, can be applied to find the critical path minimizing the maximum regret in the worst case. Since the min-max regret critical path problem with the interval arc's lengths is known as NP-hard, this paper proposes a heuristic algorithm to diminish the maximum regret. Then the computational experiments shows the proposed algorithm contributes to the improvement of solution compared with the existing heuristic algorithms.

The Method to Setup the Path Loss Model by the Partial Interval Analysis in the Cellular Band

  • Park, Kyung-Tae;Bae, Sung-Hyuk
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.14 no.2
    • /
    • pp.105-109
    • /
    • 2013
  • There are the free space model, the direct-path and ground reflected model, Egli model, Okumura-Hata model in the representative propagational models. The measured results at the area of PNG area were used as the experimental data in this paper. The new proposed partial interval analysis method is applied on the measured propagation data in the cellular band. The interval for the analysis is divided from the entire 30 Km distance to 5 Km, and next to 1 Km. The best-fit propagation models are chosen on all partial intervals. The means and standard deviations are calculated for the differences between the measured data and all partial interval models. By using the 5 Km- or 1 Km- partial interval analysis, the standard deviation between the measured data and the partial propagation models was improved more than 1.7 dB.

MODELS AND SOLUTION METHODS FOR SHORTEST PATHS IN A NETWORK WITH TIME-DEPENDENT FLOW SPEEDS

  • Sung, Ki-Seok;Bell, Michael G-H
    • Management Science and Financial Engineering
    • /
    • v.4 no.2
    • /
    • pp.1-13
    • /
    • 1998
  • The Shortest Path Problem in Time-dependent Networks, where the travel time of each link depends on the time interval, is not realistic since the model and its solution violate the Non-passing Property (NPP:often referred to as FIFO) of real phenomena. Furthermore, solving the problem needs much more computational and memory complexity than the general shortest path problem. A new model for Time-dependent Networks where the flow speeds of each link depend on time interval, is suggested. The model is more realistic since its solution maintains the NPP. Solving the problem needs just a little more computational complexity, and the same memory complexity, as the general shortest path problem. A solution algorithm modified from Dijkstra's label setting algorithm is presented. We extend this model to the problem of Minimum Expected Time Path in Time-dependent Stochastic Networks where flow speeds of each link change statistically on each time interval. A solution method using the Kth-shortest Path algorithm is presented.

  • PDF

Inverse Offset Method for Adaptive Cutter Path Generation from Point-based Surface

  • Kayal, Prasenjit
    • International Journal of CAD/CAM
    • /
    • v.7 no.1
    • /
    • pp.21-30
    • /
    • 2007
  • The inverse offset method (IOM) is widely used for generating cutter paths from the point-based surface where the surface is characterised by a set of surface points rather than parametric polynomial surface equations. In the IOM, cutter path planning is carried out by specifying the grid sizes, called the step-forward and step-interval distances respectively in the forward and transverse cutting directions. The step-forward distance causes the chordal deviation and the step-forward distance produces the cusp. The chordal deviation and cusp are also functions of local surface slopes and curvatures. As the slopes and curvatures vary over the surface, different step-forward and step-interval distances are appropriate in different areas for obtaining the machined surface accurately and efficiently. In this paper, the chordal deviation and cusp height are calculated in consideration with the surface slopes and curvatures, and their combined effect is used to estimate the machined surface error. An adaptive grid generation algorithm is proposed, which enables the IOM to generate cutter paths adaptively using different step-forward and step-interval distances in different regions rather than constant step-forward and step-interval distances for entire surface.

On Finding an Optimal Departure Time in Time-Dependent Networks

  • Park, Chan-Kyoo;Lee, Sangwook;Park, Soondal
    • Management Science and Financial Engineering
    • /
    • v.10 no.1
    • /
    • pp.53-75
    • /
    • 2004
  • Most existing studies on time-dependent networks have been focused on finding a minimum delay path given a departure time at the origin. There, however, frequently happens a situation where users can select any departure time in a certain time interval and want to spend as little time as possible on traveling the networks. In that case. the delay spent on traveling networks depends on not only paths but also the actual departure time at the origin. In this paper, we propose a new problem in time-dependent networks whose objective is to find an optimal departure time given possible departure time interval at the origin. From the optimal departure time, we can obtain a path with minimum delay among all paths for possible departure times at the origin. In addition, we present an algorithm for finding an optimal departure time by enumerating trees which remain shortest path tree for a certain time interval.

Automatic NC-Date Generation Method for 5-axis Cutting of Turbine-Blades by Finding Safe Heel-Angles and Adaptive

  • Piao, Cheng-Dao;Lee, Cheol-Soo;Cho, Kyu-Zong;Park, Gwang--Ryeol
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.5
    • /
    • pp.753-761
    • /
    • 2004
  • In this paper, an efficient method for generating 5-axis cutting data for a turbine blade is presented. The interference elimination of 5-axis cutting currently is very complicated, and it takes up a lot of time. The proposed method can generate an interference-free tool path, within an allowance range. Generating the cutting data just point to the cutting process and using it to obtain NC data by calculating the feed rate, allows us to maintain the proper feed rate of the 5-axis machine. This paper includes the algorithms for: (1) CL data generation by detecting an interference-free heel angle, (2) finding the optimal tool path interval considering the cusp-height, (3) finding the adaptive feed rate values for each cutter path, and (4) the inverse kinematics depending on the structure of the 5-axis machine, for generating the NC data.

INTEGRATION OF BICOMPLEX VALUED FUNCTION ALONG HYPERBOLIC CURVE

  • Chinmay Ghosh;Soumen Mondal
    • Korean Journal of Mathematics
    • /
    • v.31 no.3
    • /
    • pp.323-337
    • /
    • 2023
  • In this paper, we have defined bicomplex valued functions of bounded variations and rectifiable hyperbolic path. We have studied the integration of product-type bicomplex valued functions on rectifiable hyperbolic path. Also we have established bicomplex analogue of the Fundamental Theorem of Calculus for hyperbolic line integral.