• Title/Summary/Keyword: Parking Lot Expansion Plan

Search Result 6, Processing Time 0.022 seconds

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

A Study on the Functional Analysis of Parking Lot Expansion Technology using Technology-Tree (기술트리를 이용한 주차장 확대 기술의 기능분석에 관한 연구)

  • Youn, Bohyung;Choi, Jaewook;Park, Sungpyo;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.64-76
    • /
    • 2019
  • Aged apartments lack parking space and are suffering from severe parking difficulties due to the increase in the supply of private cars due to the economic improvement. Efficient remodeling technology is required as a way to solve the problem of a shortage of parking spaces, but there is a lack of establishing a technology for remodeling plans that can reflect the characteristics of various parks. This study was conducted to analyze the functions of the parking lot expansion technology using the technology tree and to derive the final technology through the function deployment. As a result of functional deployment of the plan to expand the parking lot, the fifth function was deployed and a total of 22 technologies were derived. Four types of technologies are categorized, four technologies for underground expansion, 12 technologies for underground and ground expansion, two technologies for ground expansion, and four technologies for ground-based expansion. As a result of the functional deployment of the main entrance plan, the fifth function was deployed and derived with 22 technologies. The total technologies were grouped into four categories, four technologies for direct underground entry, 11 technologies for indirect underground entry, three technologies for direct access to ground, and four technologies for indirect entry to ground. Through case verification, the detailed technologies applied to the semi-industrial complex of remodeling were identified and expert surveys and interviews were conducted to verify the adequacy of the technology tree.

A Study on Expansion for the Parking Space of Rental Housing Complexes (임대주택단지 주차공간확충 방안 연구)

  • Song, Sung-Hyun;Lee, Min-Seok
    • Journal of the Korean housing association
    • /
    • v.24 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • The purpose of this study is just for parking shall identify the status of the lack of rental apartments to relieve parking shortages. Next performed, and subsequent utilization of space just outside the parking space expansion plan is to present an alternative. Analysis of the study only 30 of the direction of the plan and set standards according to the nature of each complex. Planned urban planning aspects and architectural aspects of a parking space that can expand and classify the types of features will be discussed. Suggestions on how to take advantage of the parking space that can expand only in state owned lands in the urban planning aspects. The Architectural Planning of the side lot line change in the space and change the use of the Common Service Facilities or just to change the internal road system, by changing the way of parking, secure parking space. This way of working to improve the environment of the complex, at least. Actually just the space of improvement to be made with the opinion of the residents and the surrounding areas of the business association, must be preceded by a feasibility study.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

Development of Estimation Models for Parking Units -Focused on Gwangju Metropolitan City Condominium Apartments- (주차원단위 산정 모형 개발에 관한 연구 -광주광역시 공동 주택 아파트를 대상으로-)

  • Kwon, Sung-Dae;Ko, Dong-Bong;Park, Je-Jin;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.549-559
    • /
    • 2014
  • The rapid expansion of cities led to the shortage of housing in urban areas. The government compensated for this shortage through large scale residential developments that increased the housing supply. The supply of condominium apartments remains above 83% of the entire housing supply, and the proportion of apartments are at a steady increase, at about 50%. Due to the increase, illegally parked cars resulting from the shortage of parking spaces within the apartment complex have become increasingly problematic as they block the transit of emergency vehicles, and heighten the tension among neighboring residents in obtaining a parking space. Especially, the future residents are considered to plan the parking based on the estimated demand for parking. However, the parking unit method utilized to estimate the parking demand accounts for the exclusive use of space, which is believed to be far from the parking demands in reality. The reason for this discrepancy is that, as the number of households decrease, and area of exclusive space is expanded, the planned parking increases. On the other hand, when the number of households increase, and the area of exclusive space is reduced, the planned parking decreases, thus methods to recalculate the parking units based on estimated parking demand is an urgent concern. To estimate the parking units based on condominium apartments, this study first examined the existing research literature, and appointed the field of investigation to collect the necessary data. In addition, field study data and surveys collected and analyzed, in order to identify the problems underlying parking units, and problems regarding the current traffic impact assessment parking unit calculation method were deduced. Through identifying the influential factors on parking demand estimates, and performing a factorial analysis based on the collected data, the variables were selected in relation to the parking demand estimates, to develop the parking unit estimate model. Finally, through comparing and verifying the existing traffic impact assessment parking unit estimate against the newly developed model using collected data, a far more realistic parking unite estimate was suggested, reflecting the characteristics of the residents. The parking unit estimate model developed in this study is anticipated to serve as the guidelines for future parking lot legislature, as wel as the basis to provide a more realistic estimate of parking demands based on the resident characteristics of an apartment complex.

A Study on the Efficient Use of Public Facility Site in the 1st Generation New Town: Focused on Pyeongchon New Town (수도권 1기 신도시 공공시설부지의 효율적 이용 방안 연구: 평촌신도시를 중심으로)

  • Kim, Seong-Hee;Kim, Joong-Eun;Shim, Gyo-Eon
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.3
    • /
    • pp.572-583
    • /
    • 2020
  • The purpose of this study is to find out how to effectively utilize the public facilities site that is being used in the new town for the expansion of newly required public facilities, because it is difficult to carry out redevelopment projects in apartment complexes of 1st generation new town due to the rigidity of land use and macroeconomic conditions. This study examined the following three ways to effectively utilize existing public facilities sites for Pyeongchon new town. First, it suggested how to secure the parking lot by deciding multi-dimensional urban planning facility of public facilities such as parks and schools in superblock that lacks parking space of apartment complex. Second, it suggested a plan to accommodate the demands of public facilities required by increasing the building density of existing public buildings in commercial district as an example of the Anyang Tax Office. Lastly, it suggested a way to install additional functions required by users through the reorganization of the existing public facilities and some extensions by examining the Pyeongchon library.