• Title/Summary/Keyword: Park Construction Cost

Search Result 1,028, Processing Time 0.032 seconds

Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects (파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법)

  • Seong, Ki-Hoon;Park, Mun-Seo;Lee, Hyun-Su;Ji, Sae-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.207-211
    • /
    • 2008
  • The importance of cost management in early stage has been increasing due to market change and competition severence in construction industry. Because the adjustable budget is only 20% after finishing design stage, the critical decision is made in the early stage. However, in the early stage, the design information is not enough to make crucial decision. Therefore, this research suggests the predicting method on the purpose of accurate cost estimation. The parametric estimation is appropriate for the early stage, especially it has the strength of rapidity in cost estimation. This research analyzes 84 actual data of public apartment on the scale of $11{\sim}15$ stories, and then performs the correlation analysis between cost and influence factors. After eliminating the parameters which causes the problem of multicollinearity, this research derived the formula through the multi-regression analysis.

  • PDF

Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns (철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석)

  • Park, Koung-Yeun;Yun, Hyun-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.459-469
    • /
    • 2020
  • The purpose of this study is to secure the same or more structural performance and constructability for the detail off hooks cross-constructed at 135° used as external-ties standard detail in reinforced concrete columns, therefore, to the purpose of improving constructability, The clip-type binding implement was suggested. the experiment on the constructability evaluation and cost analysis of the clip-type binding implement by 90° end-hooked transverse reinforcement in reinforced conrete columns was carried out. The results of the analysis confirmed that standard detail column took about an one hour regardless of the diameter of tie. When using the clip-type binding implement, It was reduced to about 50% of the standard detail column. and regardless of the building size, it was most effective for the cost down when using the clip-type binding implement 1ea, it was about 32% fo labor cost reduction effect in comparison with using standard detail. as a result, Using the clip-type binding implement is shown be very effective in the working time and construction cost reduction.

Conceptual Design of a 5 MW HTS Motor (5 MW 고온초전도 모터 설계)

  • Baik, S.K.;Kwon, Y.K.;Kim, H.M.;Lee, J.D.;Kim, Y.C.;Park, H.J.;Kwon, W.S.;Park, G.S.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.10 no.3
    • /
    • pp.36-42
    • /
    • 2008
  • The superconducting motor shows several advantages such as smaller size and higher efficiency against conventional motor especially utilized in ship propulsion application. However, this size reduction merit appears in large capacity more than several MW. We are going to develop a 5MW class synchronous motor with rotating High-Temperature Superconducting (HTS) coil. that is aimed to be utilized for ship propulsion so it has very low-speed, The ship propulsion motor must generate very high electromagnetic torque instead of low-speed. Therefore. the rotor (field) coils need very large magnetic flux that results in large amount of expensive HTS conductor for the field coil. In this paper a 5MW HTS motor for ship propulsion is considered to be designed with construction cost reduced via HTS field coil cost reduction because HTS conductor cost is critical factor in the construction cost of HTS motor. In order to reduce the HTS conductor amount. iron-cored rotor types are considered. so several cases with iron-core are compared one another and with an air-core case.

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

FUTURE STRATEGY FOR KOREAN FIRMS INVOLVED IN OVERSEAS MARKETS

  • Rak-Keun Jeon;Jin-Woo Park;Jun-Youl Choi;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.389-396
    • /
    • 2005
  • Despite very good reputation that Korean construction industrial firms had enjoyed until early 1990's in overseas markets, their participation abroad drastically declined after the delivery of two(2) million unit-housing project in the early 1990's and the foreign currency crisis that took place in the late 1990's. The revival of booming construction industry in domestic market is far beyond the expectation due to the long recession of the construction economy and government's severe restriction against real estate development. Under such crucial circumstances, the construction industrial firms' strategy to survive is the more active business promotion in overseas markets. However, the Korean construction industrial firms have to abandon the labor intensive strategy, through that they have enjoyed until the early 1990's, and turn to management oriented strategy which may be a new prosperous horizon and a new challenge as well, because the labor cost of newly developing countries is much more competitive. The aim of this study is to suggest how to cope with current market situations through a chronological survey based on the cost data prevailed during four decades from the 1960's until the 1990's in overseas markets.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Cost-Effective Model for Energy Saving in Super-Tall Building

  • Song, Kwonsik;Park, Moonseo;Lee, Hyun-Soo;Kim, Sooyoung;Shin, Jinho
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.17-22
    • /
    • 2013
  • In many urban cities, super-tall buildings have been being constructed around New York and Chicago as the center since 1930 to improve the efficiency of land use and respond to new residential type. In terms of energy consumption, super-tall buildings are classified as a top energy consumption building. Also, as time passed, the degradation of energy performance occurs in super-tall buildings like general things so that these cannot show the initial performance planned in the design phase. Accordingly, building owners need to make a plan to apply energy saving measures to existing building during the operation phase. In order to select energy saving measures, calculus-based methods and enumerative schemes have been typically used. However, these methods are time-consuming and previous studies which used these methods have problems with not considering the initial construction cost. Consequently, this study proposes a model for selecting an optimal combination of energy saving measures which derives maximum energy saving within allowable cost using genetic algorithms. As a contribution of this research, it would be expected that a model is utilized as one of the decision-making tools during the planning stage for energy saving.

A Study on Life Cycle Cost Analysis of Thermal Bridge Barrier Between Window Frame and Concrete Wall (건축물의 창틀과 벽체 사이 열교방지공법의 LCC 분석)

  • Park, Cheol-Yong;Kim, Woong-Hoi;Lee, Sang-Hee;Nam, Seung-Young;Yoon, Gil-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.59-60
    • /
    • 2019
  • Thermal bridge on a building envelope causes additional heat loss which increases the heating energy consumption. As the higher building insulation performance is required, heat loss through thermal bridge becomes higher proportion among total building heating energy consumption. For the exterior insulation and finish system, thermal bridge between window frame and concrete wall should be constidered as one of main reasons of heat loss. In this study, the thermal bridge barrier between window frame and concrete wall(STAR) was proposed as the best practice for reducing thermal bridge. The STAR was confirmed that the use of thermal bridge barrier imporved the annual heat energy capacity by 35% or more and the innitial construction cost by 7.4% or less because of additional interior insulation against condensation. Finally the life cycle cost during 20 year by heating energy of a building reduced by 25% or more compared with the exist technology. This STAR thermal bridge barrier will be used as the main technology to improve the energy efficiency of building.

  • PDF

COST-EFFECTIVE MODEL FOR ENERGY SAVING IN SUPER-TALL BUILDING

  • Kwonsik Song;Moonseo Park;Hyun-Soo Lee;Sooyoung Kim;Jinho Shin
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.294-299
    • /
    • 2013
  • In many urban cities, super-tall buildings have been being constructed around New York and Chicago as the center since 1930 to improve the efficiency of land use and respond to new residential type. In terms of energy consumption, super-tall buildings are classified as a top energy consumption building. Also, as time passed, the degradation of energy performance occurs in super-tall buildings like general things so that these cannot show the initial performance planned in the design phase. Accordingly, building owners need to make a plan to apply energy saving measures to existing building during the operation phase. In order to select energy saving measures, calculus-based methods and enumerative schemes have been typically used. However, these methods are time-consuming and previous studies which used these methods have problems with not considering the initial construction cost. Consequently, this study proposes a model for selecting an optimal combination of energy saving measures which derives maximum energy saving within allowable cost using genetic algorithms. As a contribution of this research, it would be expected that a model is utilized as one of the decision-making tools during the planning stage for energy saving.

  • PDF

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.