DOI QR코드

DOI QR Code

Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns

철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석

  • Received : 2020.09.26
  • Accepted : 2020.10.07
  • Published : 2020.10.20

Abstract

The purpose of this study is to secure the same or more structural performance and constructability for the detail off hooks cross-constructed at 135° used as external-ties standard detail in reinforced concrete columns, therefore, to the purpose of improving constructability, The clip-type binding implement was suggested. the experiment on the constructability evaluation and cost analysis of the clip-type binding implement by 90° end-hooked transverse reinforcement in reinforced conrete columns was carried out. The results of the analysis confirmed that standard detail column took about an one hour regardless of the diameter of tie. When using the clip-type binding implement, It was reduced to about 50% of the standard detail column. and regardless of the building size, it was most effective for the cost down when using the clip-type binding implement 1ea, it was about 32% fo labor cost reduction effect in comparison with using standard detail. as a result, Using the clip-type binding implement is shown be very effective in the working time and construction cost reduction.

이 연구의 목적은 철근콘크리트 기둥에서 띠철근 상세로 이용되는 갈고리 양단 135° 교차시공에 대해 동등이상의 구조적 성능을 확보하면서, 동시에 시공성을 개선할 목적으로 클립형 연결장치를 이용하여 90° 갈고리 띠철근에 결속하는 방법을 제시하였으며, 제안한 클립형 연결장치에 따른 시공성 평가 및 소요비용을 분석하였다. 분석 결과, 기둥 1개 전체 철근 조립하는 데 작업 시간은 클립형 연결장치 사용시 50%의 작업시간을 단축하는 것으로 나타났으며, 비용분석 결과 클립형 연결장치 1개 사용시 절감효과가 가장 효과적이었고, 표준 갈고리 상세 대비 약 32%의 비용 절감효과가 있는 것으로 분석되었다.

Keywords

References

  1. Korea Concrete Instiute. Standard specificaion for concrete. Seoul (Korea): Kimoondang Publishing Company; 2017. 637 p.
  2. American Concrete Instiute. Building code requirements for sturtural concrete and commentary: ACI 318-11. Farmington Hills. Mi (USA): American Concrete Instiute; 2011. 503 p.
  3. Architectural Institute of Korea Writing Committee. Site inspection and damage investigation of buildings by earthquake in gyeongju and pohang. Seoul (Korea): Architectural Institute of Korea; 2018. p. 257-63.
  4. Park KY, Yun HD. Clip-type binding implement effect on anchorage behavior of 90-degree end-hooked transverse reinforcement in reinforced concrete columns. Journal of the Korea for Structural Maintenance and Inspection. 2020 Aug;24(4):72-80.
  5. Kim, GY, Ryu, EM, Ryu JA, Kim HS, Shin YS. An experimental study on axial force behavior of RC columns with lapped hoops. Proceeding of Journal of the Korea Concrete Institute; 2016 11 2-4; Kangwon. Korea. Seoul (Korea): Korea Concrete Institute; 2016. p. 135-6.
  6. Eom TS, Choi TW, Park HG, Kang SM. Jin JM. Seismic tests on reinforced concrete dolumns confined with continuous hoops. Journal of Korea Institute of Building Construction. 2013 Feb;29(2):29-37. https://doi.org/10.5659/JAIK_SC.2013.29.2.29
  7. Lukkunaprasit P, Sittipunt C. Ductility enhancement of moderately confined concrete tied columns with hook-clips. Structural Journal. 2003 Jul;100(4):422-9.
  8. Castro JJ, Imai H. Development of hoops with double right angle anchorage for RC columns. In Proceedings of the 13th World Conference on Earthquake Engineering; 2004 Aug 1-6; 13th World Conference Earthquake Engineering Vancouver. Canada: 13 WECEE; 2004. Paper No. 2473.
  9. Park KY, Kim YJ. Band steel locking device. Daejeon (Korea): Korean Intellectual Property Office; 2020. Patent Public No.: 10-2148235; 2020.
  10. Korea Construction Association. The status of wages in construction industry in the first half of 2020 investigation report. Seoul (Korea): Korea Construction Association; 2020. 9 p.
  11. The Public Procurement Service, Application of the cost accounting ratio of public procurement service facilities in 2020: The Public Procurement Service - Information Provision - Work Data - Facility Construction[Internet] ,Daejeon: The Public Procurement Service; 2020 Jan [cited 2020 Jan 3]. 1 p. Available from. http://www.pps.go.kr/bbs/selectBoardList.do?boardId=PPS056&faqTotal=&cateSeqNo=&searchCondition=all&searchKeyword=%EC%9B%90%EA%B0%80&pageIndex=1