• Title/Summary/Keyword: Park Construction Cost

Search Result 1,019, Processing Time 0.028 seconds

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

The Functions and Roles of Bimodal Tram in the Public Transportation System (대중교통체계에서 바이모달 트램의 기능과 역할)

  • Yoon, Hee-Taek;Park, Young-Kon;Chang, Seky-Mok;Mok, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2463-2466
    • /
    • 2008
  • The public transportation in operation or to be planned domestically includes subway, LRT, bimodal tram and bus, which are independently characterized in their passenger capacity and cost. High quality service is generally accompanied by high cost of construction and operation. Thus, ITS, BIS/BMS and BRT system are recently introduced to provide high quality service to the passengers with the cost as low as possible. The bimodal tram is under development to achieve such goals in public transportation. The passenger capacity is approximately expected to be 10,000$\sim$17,000 persons/hour and the construction cost to be 10$\sim$30 million dollars/km. It is possible to construct the infrastructure gradually depending on the demand of transportation in the planned route, which can effectively reduce the initial cost to launch the service. The bimodal tram is developed to provide the advantages of subway and bus to the passengers with respect to the scheduled operation and flexibility of the lines.

  • PDF

Comparative Cost Analysis of Repair Method according to Bridge Superstructure Type (교량 상부구조 형식에 따른 보수공법 비용 비교분석)

  • Lee, Changjun;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.277-278
    • /
    • 2023
  • The need for maintenance of bridge infrastructure is increasing due to aging, and the cost of maintaining the infrastructure must be calculated for effective budget distribution. Therefore, in this study, representative defects according to bridge superstructure type are derived to calculate the cost for each repair method. First of all, the representative bridges, PSCI girder bridge, Rahmen bridge, Steel box girder bridge, and RC slab bridge, were selected as superstructures using BMS data, and repair methods for defects were presented. In addition, the cost of the repair method by superstructure type was compared. This result is expected to predict total maintenance costs in consideration of the maintenance cycle.

  • PDF

A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

Analysis of Economic Effectiveness in the Results of Construction R&D (건설R&D성과의 경제적 파급효과 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.71-81
    • /
    • 2010
  • In 1994, Korean construction research and development (R&D) projects received investments amounting to 1.2 billion KRW, an amount that rose to 164.8 billion KRW in 2007. Under the current system, construction researchers submit the application records of Construction Research and Development (R&D) in construction projects to the Korea Institute of Construction & Transportation Technology Evaluation and Planning. The performance of Construction R&D projects has thus been dependent on the subjective reporting of the results by the researchers themselves. For this reason, it is difficult to secure confidence in the records of Construction Research and Development. Therefore, this research suggested measures for revitalizing Construction Research and Development, analyzed approaches to cost-saving in Construction Research and Development, and analyzed economic effectiveness in the results of construction R&D.

The Effect of Aggressive Order Intake on Defect of Construction Companies - Empirical Analysis Using Financial Approach - (공격적인 수주행위가 건설기업의 하자발생에 미치는 영향 - 재무적 접근을 이용한 실증분석 -)

  • Park, Hong-Jo;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.149-156
    • /
    • 2021
  • This study empirically verified whether aggressive order intake affect occurrence of defects of Korean construction companies. In order to compensate for the shortage of construction costs due to aggressive low-cost orders of contractors, self-response measures such as design changes are followed, and construction defects may be induced in this process. It aims to verify relevance between aggressive order intake and defect in construction empirically using financial accounting data. As a result, it was confirmed that an abnormal increase in order volume and a deterioration in profitability such as operating margin due to aggressive order taking behavior leads to a decrease in construction quality and occurrence of defects. In addition, it was also confirmed that low construction ability and intentional changes in construction design or contract conditions after construction commences were a direct causes of defects. The results of this study can serve as an opportunity to come up with measures to prevent defects by confirming the relationship between defects in construction and deterioration of profitability due to aggressive low-cost order takings.

Life Cycle Cost Estimation of Cleaning Robot for External Windows (유리창 외부 청소용 로봇의 생애주기비용 예측)

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Jeoung-Tae;Park, Kyeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.272-273
    • /
    • 2017
  • As businesses put a greater emphasis on outward appearances, the demand for external window cleaning has been on the rise. However, with the conventional labor-intensive window cleaning method, it is hard to meet this demand. Therefore, this study proposes a Life Cycle Cost (LCC) analysis model for a guiderail-type cleaning robot, and estimate the LCCs of the conventional method and the cleaning robot. The findings of this research are expected to serve as a guide for future development of a cleaning robot.

  • PDF

Cost-Effectiveness Evaluation of Semi-Active Control System for Cable-Stayed Bridge (사장교에 장착된 준능동형 제어시스템의 비용효율성 평가)

  • Hahm, Dae-Gi;Park, Won-Suk;Koh, Hyum-Moo;Ok, Seung-Yong;Park, Kwan-Soon
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2005.03a
    • /
    • pp.388-395
    • /
    • 2005
  • This paper presents cost-effectiveness evaluation of semi-active control system for cable-stayed bridge under earthquake excitation. Bi-state control method with Linear Quadratic Gaussian(LQG) optimal controller is used for generic semi-active dampers. Cost-effectiveness of the structural control system is investigated by using the life-cycle cost(LCC) concept. The evaluation results show that the efficiency of semi-active control system is increased when the damage cost due to the failure of bridge system or the bridge importance is enlarged. It was also found that the damper cost had little influence on the cost-effectiveness of semi-active control system if it was relatively small to the initial construction cost.

  • PDF

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.